### Executive summary and program status
- Extended Credit Facility (ECF) program: First Review approved in May 2023; authorities committed to reform agenda after the June 4, 2023 legislative election.
- Program performance: Five out of eight quantitative performance criteria (QPCs) for March 2023 were met.
- Structural benchmarks (SBs): All five SBs for the second review, two for the third review, and one for the fourth review have been met.
- Authorities proposed four new SBs to:
  - accelerate professionalization of the tax function;
  - reintroduce expenditure controls (COTADO);
  - improve governance of state property;
  - add a quarterly review this year for closer monitoring.

### Recent economic developments and key statistics
- Real GDP at market prices: growth moderated to 4.2 percent in 2022; projected 4.5 percent in 2023.
- Real GDP per capita: 1.9 percent in 2022; projected 2.3 percent in 2023.
- Inflation (annual average): 7.9 percent in 2022; expected about 7.0 percent in 2023; staff/authorities medium-term projection ~2 percent.
- Current account:
  - 2022 current account deficit: 8.9 percent of GDP (provisional).
  - Projected 2023 current account deficit: 7.1 percent of GDP.
- Banking sector:
  - Credit to the economy growth in 2022: 23.7 percent.
  - Gross NPLs to total loans: declined from 19.4 percent in 2021 to 10.4 percent in 2022.
  - Banking sector meets regional prudential criteria except for one large undercapitalized bank.

### Fiscal outcomes, public debt, and government finances (selected figures)
- Overall fiscal deficit: 5.9 percent of GDP in 2022.
- Public debt stock: increased to 80.3 percent of GDP in 2022 (provisional).
- Public and publicly guaranteed debt composition (percent of GDP):
  - Stock of public and publicly guaranteed debt: 80.3 percent in 2022.
  - External debt: 39.2 percent in 2022.
- Government finances (2022, percent of GDP):
  - Revenue excluding grants: 11.8 percent of GDP.
  - Domestic primary expenditure: 15.0 percent of GDP.
  - Domestic primary balance: -3.2 percent of GDP.
  - Overall balance (including grants): -5.9 percent of GDP.
  - Overall balance (excluding grants): -9.3 percent of GDP.
- Public debt outlook:
  - Stock projected to decline to 75.5 percent of GDP in 2023.
  - Authorities aim for fiscal deficit and debt ratio within 3 percent and 70 percent of GDP by 2025 and 2027, respectively.

### Program performance details, missed QPCs, and corrective actions
- Missed QPCs (September 2023 reporting for March 2023):
  - Total domestic tax revenue: Prel. 21.4 CFAF billion; transitory 21.1; deviation -0.3 CFAF billion (missed mainly due to lower customs collection).
  - Wages and salaries: Prel. 14.3 CFAF billion; target 14.9; deviation 0.6 CFAF billion (missed mainly because of lower-than-expected savings from the 2022 census).
  - Domestic primary balance: deviation -10.8 CFAF billion; transitory component -21.6; of which CFAF 7.9 billion transitory to be compensated and CFAF 2.9 billion linked to front-loading of domestic investment.
- Corrective measures taken or planned:
  - Strengthening expenditure controls and reintroducing COTADO approval requirements.
  - Selling 5G licenses (target mobilization: at least CFAF 5.0 billion in 2023).
  - Rationalizing tax expenditures and streamlining tax exemptions for imported goods.
  - New census and payroll integrity measures; quantified reinstatement costs: reinstatement of 1,505 public workers (CFAF 0.5 billion) and additional security forces (CFAF 0.1 billion).
  - Suspension of incentives for DGCI’s unqualified managers for rest of 2023 (expected saving CFAF 0.6 billion).

### Fiscal stance, short-term revenue mobilization, and wage bill control
- One-off fiscal measures:
  - One-off transfer of CFAF 5.2 billion to the public utility company in April-May 2023 to pay three months of unpaid invoices.
  - Mobilized CFAF 5.0 billion of nontax revenue through the 5G licensing process to keep domestic primary deficit unchanged (0.2 percent of GDP) for 2023.
  - Additional budget support raised: CFAF 2.0 billion.
- Short-term revenue measures:
  - DGCI under new leadership outperformed tax collection targets by CFAF 2.6 billion until April 2023.
  - Ministerial order to eliminate tax exemptions for imported raw materials; expected to compensate CFAF 1.4 billion underperformance.
  - 5G licensing: government aims to raise at least CFAF 5.0 billion in latter part of 2023; timing uncertainty noted (if delayed to 2024, 2023 domestic primary balance impact 0.4 percent of GDP).
- Wage bill controls:
  - New census of public workers expected saving CFAF 2.0 billion through dismissal of ~2,000 ghost workers.
  - New interministerial coordination body headed by MoF to eradicate ghost workers immediately.
  - Biometric attendance controls to be installed; suspension and reprioritization of incentive payments.

### Electricity utility (EAGB) fiscal risks and mitigation
- Oversight transfer:
  - Oversight of EAGB shifted from Ministry of Energy to MoF in March 2023.
- Metering and revenue actions:
  - 14,401 pre-paid meters installed by end-May 2023; target completion of all 35,000 pre-paid meters by end-July 2023 (SB timelines include June/December 2023 milestones).
  - Meter installation expected to generate revenue to stay current with payments to Karpower without further government transfers; CFAF 2 billion monthly revenue target cited to avoid arrears.
- Management and contractual actions:
  - Regional connection project OMGV planned to connect to hydropower by end-2023.
  - New management to be selected on merit via open competitive selection with World Bank support.
  - Renegotiation with Karpower ongoing; Audit Court progressing audits of power purchase contracts and addendums (audit publication SB: December 2023).

### Financial sector stability, bank disengagement, and contingent liabilities
- Large undercapitalized bank:
  - Government settled cross-arrears of ~CFAF 4.7 billion in 2022, improving the bank’s situation.
  - Due diligence by a potential strategic investor completed; investor reiterated interest.
  - Final terms to be submitted to the Regional Banking Commission for evaluation in August 2023.
  - Contingency: if divestment fails, authorities committed to SB to commission an assessment and full independent audit of loan portfolio and prepare a viable recapitalization/resolution/liquidation plan by end of program.
- Contingent liabilities:
  - Possible failure of disengagement strategy may generate contingent liabilities to recapitalize the bank or compensate small depositors to retain confidence.

### Financing needs, debt strategy, and arrears management
- Additional financing needs:
  - Additional financing needs of 1.8 percent of GDP over the next three years to support fiscal consolidation and preserve debt sustainability.
  - Staff estimates a financing gap of CFAF 7.9 billion—around 0.6 percent of GDP per year—which are fully covered for the next 12 months with good prospects for 2024 and 2025.
- Financing strategy:
  - Catalyze donor financing; contract only new highly concessional loans; rationalize disbursements of contracted non-concessional project loans.
  - Zero ceiling on new non-concessional external borrowing (except BOAD Development and Cohesion Fund adjustor items).
- Arrears:
  - Authorities plan to clear audited and recognized domestic arrears during the program period.
  - Legacy external arrears total US$5.7 million at end-2022 (Brazil US$1.9 million pending parliamentary approval; Russia US$1.5 million; Pakistan US$2.2 million); agreements/negotiations in progress.

### Debt profile, risk assessment, and external borrowing plan (text table highlights)
- Debt distress assessment:
  - Guinea-Bissau at high risk of external and overall debt distress, but debt assessed as sustainable based on authorities’ commitment and donor engagement.
  - External debt around 39.0 percent of GDP at end-2022; PV of public debt relative to GDP remains well above indicative benchmark in projections.
- External Borrowing Plan (Text Table 2, In USD million):
  - Sources/Uses: Volume of new debt 32.7; Present value of new debt 21.2.
  - Urban Infrastructure: Volume 12.3; Present value 8.0.
  - Agriculture: Volume 20.4; Present value 13.3.
  - Note: Present value calculated using individual loan terms and applying 5 percent program discount rate; debt with grant element ≥35 percent categorized as concessional.

### Governance, transparency, AML/CFT, and rule of law reforms
- Governance actions implemented/ongoing:
  - Publication of third-party audit and beneficial ownership information for COVID-19 related public contracts.
  - Progress in priority audits by the Audit Court.
  - Commitment to modernize the asset declaration regime and finalize national AML/CFT policy and action plan.
- Action plans and timelines (Annex II highlights):
  - Revenue administration: 24 priority actions between Mar-2023 and Jun-2025; public tenders for IT specialists launched May-2023.
  - PFM/TSA: Excel-based medium-term PIP database (SB end-Dec-2023); monthly reporting of externally financed capital expenditure (ministerial order, pilot for top 30 projects).
  - AML/CFT and public procurement: finalize national AML/CFT policy and action plan by end-Dec-2023; require BO identification for legal persons registering at CFE and DGICRN by end-Jun-2024.
  - Anti-corruption and rule of law: resubmit asset declaration reform law to Parliament (SB end-Sep-2023); CAJ rollout and website (SB end-Mar-2024).

### Risk Assessment Matrix — principal risks and mitigation policies (Annex I summary)
- External risks (selected, relative likelihood / expected impact if realized / time horizon):
  - Intensification of regional conflicts: High / High / ST. Mitigations: wage bill control, spending review, target social spending, mobilize grants/concessional loans.
  - Abrupt global slowdown or recession: High / High / ST. Mitigations: reprioritize public spending, mobilize grants/concessional loans.
  - Monetary policy miscalibration: Medium / High / ST. Mitigations: adjust fiscal policy, monitor macro-financial risks.
  - Commodity price volatility and further adverse cashew price movements: Medium / Medium or Medium / ST, MT. Mitigations: fiscal space creation, diversification.
  - Cyberthreats: Medium / Medium High / ST. Mitigations: contingent plans.
- Domestic risks (selected):
  - Social discontent and political risks: High / High / ST, MT. Mitigations: prioritize social spending, wage bill control, mobilize grants.
  - Systemic financial instability: Medium / Medium/High / MT. Mitigations: enhance banking supervision, fiscal buffers.
  - Continued SOE weaknesses (EAGB): Medium / Medium/High / ST. Mitigations: SOE management reforms, accountability.
  - Extreme climate events: Medium / High / ST, MT. Mitigations: diversification, climate resilient infrastructure.
- Note on probability classification: “low” <10 percent, “medium” 10–30 percent, “high” 30–50 percent.

### Program modalities, monitoring, and conditionality
- QPCs, SBs, and prior actions:
  - Authorities requested waiver for non-observance of three QPCs for March 2023 based on corrective actions (new census, biometric devices, incentive payment streamlining, COTADO controls).
  - Request to convert end-September 2023 indicative targets into QPCs and rephase two disbursements of SDR 2.37 million on January 17, 2024 and April 17, 2024.
  - Prior action enacted: ministerial order requiring Treasury to pay all external debt service by due date (or on dates specified by Minister for CFAF-denominated service).
  - Four new SBs proposed for next 12 months: accelerate DGCI professionalization, implement COTADO expenditure controls, require external debt service payments by due date, improve state property governance.
- Monitoring and review schedule:
  - IMF monitoring: quarterly until Dec-2023, then semi-annually; bi-annual performance criteria (end-June, end-December) and continuous criteria throughout program.
  - Review dates: Third review based on end-Jun-2023 targets (on/after Oct-17, 2023); Fourth review based on end-Sep-2023 targets (on/after Jan-17, 2024); Fifth review based on end-Dec-2023 targets (on/after Apr-17, 2024); Sixth review based on end-Jun-2024 targets (on/after Oct-17, 2024).
- Reporting requirements (selected):
  - Central government budget and execution: Monthly — 30 days after end of month.
  - Change in stock of domestic arrears: Monthly — 30 days after end of month.
  - External and domestic debt and guaranteed debt by creditor: Monthly — 30 days after end of month.
  - Detailed consolidated balance sheet of commercial banks: Monthly — 45 days after end of month — BCEAO.
  - Balance of Payments data: Quarterly — 45 days after end of quarter — BCEAO.

### Staff appraisal and recommendations
- Outlook: positive but subject to significant downward risks from global and domestic factors; growth expected to recover slightly in 2023 but with substantial uncertainty.
- Fiscal policy priorities:
  - Fiscal consolidation to preserve debt sustainability and support inclusive growth.
  - Wage bill controls and payroll integrity measures are crucial to stay on track.
  - Domestic revenue mobilization to be accelerated via DGCI professionalization, tax exemption streamlining, and one-off measures like 5G licensing.
  - Reintroduction of COTADO to strengthen non-wage expenditure controls.
- Governance and rule-of-law recommendations:
  - Continue priority audits, publish beneficial ownership information, finalize asset declaration regime, and speed up national AML/CFT policy preparation.
  - Secure funding for minimum operating costs in the judicial sector.
- Program support:
  - Staff supports completion of the second review, waiver of nonobservance of performance criteria, and rephasing of access under the ECF arrangement.
  - Staff recommends completion of the financing assurance review.

*Source: IMF staff report — GUINEA-BISSAU: SECOND REVIEW UNDER THE EXTENDED CREDIT FACILITY ARRANGEMENT (content unit 1gnbea2023003).*

### 5.9 percent of GDP in 2022. Based on provisional data, the public debt increased to 80.3

### GUINEA-BISSAU: SECOND REVIEW UNDER THE EXTENDED CREDIT FACILITY ARRANGEMENT

### Executive summary and program status
- Extended Credit Facility (ECF) program: First Review approved in May 2023; authorities committed to the reform agenda following the June 4, 2023 legislative election.
- Program performance: Five out of eight quantitative performance criteria (QPCs) for March 2023 were met.
- Structural benchmarks: All five SBs for the second review, two for the third review, and one for the fourth review have been met. Authorities proposed four new structural benchmarks to:
  - accelerate the professionalization of the tax function;
  - reintroduce expenditure controls;
  - improve the governance of state property;
  - add a quarterly review this year for closer monitoring.

### Recent economic developments
- Real GDP at market prices: growth moderated to 4.2 percent in 2022; projected 4.5 percent in 2023.
- Real GDP per capita: 1.9 percent in 2022; projected 2.3 percent in 2023.
- Inflation (annual average): 7.9 percent in 2022; expected about 7.0 percent in 2023.
- Current account:
  - Based on provisional data, the current account deficit worsened to 8.9 percent of GDP in 2022.
  - Projected at 7.1 percent of GDP in 2023.
- Banking sector:
  - Credit to the economy grew by 23.7 percent in 2022.
  - Gross NPLs to total loans declined from 19.4 percent in 2021 to 10.4 percent in 2022.
  - Except for one large undercapitalized bank, the banking sector meets regional prudential criteria.

### Fiscal outcomes and public debt
- Overall fiscal deficit: remained at 5.9 percent of GDP in 2022.
- Public debt stock: increased to 80.3 percent of GDP in 2022 based on provisional data, driven by:
  - higher-than-projected overall fiscal deficit;
  - new government guarantees mainly to the public utility company;
  - recognition of cross-arrears owed to suppliers with non-performing loans at the undercapitalized bank.
- Public debt outlook: projected to decline in 2023 mainly due to fiscal consolidation efforts.
- Government finances (selected percentages of GDP, 2022):
  - Revenue excluding grants: 11.8 percent of GDP.
  - Domestic primary expenditure: 15.0 percent of GDP.
  - Domestic primary balance: -3.2 percent of GDP.
  - Overall balance (including grants): -5.9 percent of GDP.
  - Overall balance (excluding grants): -9.3 percent of GDP.
- Public and publicly guaranteed debt composition (percent of GDP):
  - Stock of public and publicly guaranteed debt: 80.3 percent in 2022.
  - Of which: external debt: 39.2 percent in 2022.

### Program performance details and corrective actions
- Missed QPCs (March 2023) and explanations:
  - Total domestic tax revenue: Prel. 21.4 CFAF billion; transitory 21.1; deviation -0.3 CFAF billion (missed mainly due to lower customs collection).
  - Wages and salaries: Prel. 14.3 CFAF billion; target 14.9; deviation 0.6 CFAF billion (missed mainly because of lower-than-expected savings from the 2022 census).
  - Domestic primary balance: deviation -10.8 CFAF billion; transitory component -21.6; of which CFAF 7.9 billion transitory to be compensated and CFAF 2.9 billion linked to front-loading of domestic investment.
- Corrective measures taken or planned:
  - Strengthening expenditure controls.
  - Selling 5G licenses.
  - Rationalizing tax expenditures.
  - Reinstatement and hiring adjustments linked to the 2022 census were quantified: reinstatement of 1,505 public workers (CFAF 0.5 billion) and additional security forces (CFAF 0.1 billion).

### Outlook and risks
- Baseline medium-term projections:
  - Growth to accelerate to around 5 percent per year in 2024 and over the medium term.
  - Inflation expected to gradually converge to about 2 percent.
  - Current account deficit expected to improve due to sustained fiscal consolidation and more favorable terms-of-trade.
- Downside risks (Annex I):
  - Domestic political risks and weak state capacity.
  - Disappointing cashew nut exports.
  - Climate shocks.
  - Geo-economic fragmentation affecting food and oil prices, donor support, supply disruptions, and financial stability.
  - Monetary policy miscalibration at the regional level leading to sharp swings in interest rates.
  - Fiscal risks from SOEs, including delays in connection to OMVG and increased technical losses from the distribution grid.
  - Financial stress in the banking sector generating contingent liabilities.
- Policy response if risks materialize:
  - Further rationalize non-priority expenditure.
  - Seek additional concessional financial support.

### Policy priorities and governance actions
- Fiscal consolidation remains central to:
  - preserve debt sustainability;
  - support inclusive growth;
  - strengthen governance and management of public resources;
  - mitigate fiscal risks and rely on highly concessional financing.
- Governance and anti-corruption measures implemented and ongoing:
  - Publication of third-party audit and beneficial ownership information of public contracts related to COVID-19 emergency spending.
  - Progress in priority audits by the Audit Court.
  - Mitigating fiscal risks from the public utility company.
  - Commitment to modernize the asset declaration regime and improve the AML/CFT framework.
- Additional reforms needed:
  - Enhance economic diversification.
  - Ensure banking vulnerabilities are managed effectively.
  - Improve professionalization of the tax function, expenditure controls, and governance of state property.

*Source: IMF staff report — GUINEA-BISSAU: SECOND REVIEW UNDER THE EXTENDED CREDIT FACILITY ARRANGEMENT (July 6, 2023).*

### 10.      The draft 2023 budget and the fiscal consolidation strategy aims to ensure medium-

### 10.      The draft 2023 budget and the fiscal consolidation strategy aims to ensure medium-term fiscal sustainability while supporting the economic recovery.

### Fiscal stance and immediate corrective actions
- Government made a one-off transfer of CFAF 5.2 billion to the public utility company in April-May 2023 to pay for three months of unpaid invoices owed to the sole power supplier.  
- Government mobilized CFAF 5.0 billion of nontax revenue through the 5G licensing process to keep the level of a domestic primary deficit unchanged for 2023 (0.2 percent of GDP).  
- Additional budget support of CFAF 2.0 billion was raised, catalyzed by the ECF supported program.  
- Stock of public and publicly guaranteed debt is projected to decline to 75.5 percent of GDP in 2023.  
- Authorities aim to bring the fiscal deficit and debt ratio within 3 percent and 70 percent of GDP by 2025 and 2027, respectively, consistent with WAEMU convergence criteria.

### Short-term domestic revenue mobilization (MEFP ¶10)
- Professionalization of the Directorate-General of Duties and Taxes (DGCI):
  - Under new leadership, the DGCI outperformed its tax collection targets by CFAF 2.6 billion until April 2023.
  - Implementation of the revenue reform action plan included in the ministerial order (Annex II) and a new SB to prepare a redeployment plan for DGCI managers through public tenders.
- Streamlining of tax exemptions for imported goods:
  - MoF issued a ministerial order to eliminate tax exemptions for imported raw materials.
  - Expected to generate additional revenue to compensate underperformance of CFAF 1.4 billion in tax collection from imported goods until April 2023.
- Mobilization of 5G license fees:
  - Government aims to raise at least CFAF 5.0 billion of additional one-off nontax revenue in the latter part of 2023 to compensate the one-off transfer to the public utility company.
  - Note: Although CFAF 5 billion is conservatively estimated, uncertainty in timing exists; if delayed until 2024, without additional measures, impact on domestic primary balances for 2023 would be 0.4 percent of GDP, which can be financed by issuance of Treasury securities.
  - Regulatory authority expected to issue the fee schedule and licenses shortly after completion of negotiations.

### Measures to contain wage bill and non-wage recurrent expenditures (MEFP ¶11-12)
- New census of public workers:
  - Expected saving of CFAF 2.0 billion through dismissal of around 2,000 ghost workers (similar to results of 2022 census).
  - New census will target four ministries with largest potential savings.
  - New interministerial coordination body headed by MoF to eradicate identified ghost workers immediately without relying only on the Ministry of Public Administration.
- Streamlining of tax collection incentive payments:
  - Incentives for DGCI’s unqualified managers suspended for rest of 2023.
  - Expected reduction in other current expenditure by CFAF 0.6 billion.
  - Incentives for qualified managers retained and gradually shifted to merit-based systems per TA recommendations.
- Reintroduction of commitment controls by COTADO:
  - Proposed continuous SB will revive the COTADO process and ex-post review by the President of Republic.
  - Expected to reduce discretionary expenditure for rest of 2023 to compensate election census spending and overruns until May 2023.

### Fiscal structural reforms and Treasury modernization (MEFP ¶13, 17-18)
- Public Investment Project database:
  - Progress in developing a monthly reporting system of externally financed capital expenditure.
- Census of public bank accounts:
  - Revealed significant positive and negative cash balances.
  - For Treasury bank accounts, positive and negative cash balances were, respectively, CFAF 6.6 billion and 7.1 billion in April 2023; the sum corresponds to discrepancies recorded in the fiscal table for 2022.
- Payment systems and Treasury Single Account:
  - Authorities joined the BCEAO’s Real-Time Gross Settlement system in early 2023.
  - Installation of software to create interfaces between the Treasury and banking systems is being completed, a key milestone for Treasury Single Account implementation.

### Fiscal risks from the public utility company (MEFP ¶14-16)
- Oversight shifted from Ministry of Energy to MoF in March 2023, boosting revenue mobilization efforts for Electricidade e Aguas da Guinea-Bissau (EAGB).
- Metering and revenue actions:
  - 14,401 pre-paid meters installed by end-May 2023; all 35,000 pre-paid meters expected to be installed by end July 2023.
  - Installation will generate revenue needed to stay current with payments to sole power supplier, Karpower, without further government transfers.
- Diversification and management:
  - Regional connection project OMGV planned to connect grid to hydropower from Guinea Conakry by end-2023.
  - New management team to be selected on a merit basis through an open competitive selection process with World Bank support.
  - Authorities continuing renegotiation with Karpower; Audit Court progressing audits of power purchase contracts and addendums to support renegotiation and identify legality issues.

### Financing needs, debt strategy, and arrears
- Additional financing needs:
  - Supporting fiscal consolidation and preserving debt sustainability entails additional financing needs of 1.8 percent of GDP over the next three years.
  - Staff estimates a financing gap of CFAF 7.9 billion—around 0.6   percent of GDP per year—which are fully covered for the next 12 months and have good prospects for being covered for 2024 and 2025.
- Financing strategy:
  - Catalyze donor financing, contract only new highly concessional loans, and rationalize disbursements of contracted non-concessional project loans.
  - Strategy aims to alleviate pressures from reliance on non-concessional lending from BOAD, local commercial banks, and treasury issuances in the regional market.
- Arrears:
  - Authorities plan to clear during the program period all audited and recognized domestic arrears and are addressing legacy external arrears (MEFP, ¶21).
  - Authorities committed to clear part of outstanding domestic arrears (MEFP, ¶20).
  - Legacy external arrears total US$5.7 million at end-2022 to Brazil, Russia, and Pakistan; agreements/negotiations in progress (Russia US$1.5 million; Pakistan US$2.2 million; Brazil US$1.9 million pending parliamentary approval).

### Debt profile, risks, and limits
- Risk assessment:
  - Guinea-Bissau is at a high risk of external and overall debt distress, but debt is assessed as sustainable.
  - External debt estimated around 39.0 percent of GDP at end-2022.
  - Risk of external debt distress is high because debt-service ratio indicators breach indicative thresholds under the baseline.
  - Overall risk of debt distress is high because PV of public debt relative to GDP remains well above its indicative benchmark throughout the projection period.
- Debt management and policy:
  - Debt assessed as sustainable based on authorities’ commitment to sound policies supported by strong donor engagement; regional context reduces medium-term rollover risks for domestic debt.
  - Staff projects a gradual decline of the PV of public debt relative to GDP over the medium term.
  - Authorities will plan new investments carefully and contract future debt only on highly concessional terms (MEFP, ¶23).
  - Debt sustainability prospects expected to improve through better transparency and compliance with a QPC of the zero ceiling on new non-concessional borrowing consistent with the authorities’ external borrowing plan (Text Table 2).
- Text Table 2 excerpt (Guinea-Bissau: External Borrowing Plan, In USD million):
  - Sources of debt financing: Volume of new debt 32.7; Present value of new debt 21.2.  
  - Concessional debt: Volume of new debt 32.7; Present value of new debt 21.2.  
  - Multilateral debt: Volume of new debt 32.7; Present value of new debt 21.2.  
  - Uses of debt financing: Volume of new debt 32.7; Present value of new debt 21.2.  
  - Urban Infrastructure: Volume of new debt 12.3; Present value of new debt 8.0.  
  - Agriculture: Volume of new debt 20.4; Present value of new debt 13.3.  
  - Note: Contracting and guaranteeing of new debt excluding IMF. Present value calculated using terms of individual loans and applying the 5 percent program discount rate. Debt with a grant element of at least 35 percent is categorized as concessional.

### Strengthening debt management and payment prioritization (MEFP, ¶22)
- Recent payment issues:
  - Late payments of debt service to the regional development bank.
  - Late payment of CFAF 0.6 billion of external debt service, which ran into arrears momentarily in April 2023.
- Policy action:
  - Ministerial order (Prior Action) requires the Treasury to pay all external debt service by the due date or if denominated in CFAF on dates specified by the Minister of Finance.
  - Proposed continuous SB will require implementation of this ministerial order, monitored through the Treasury Committee.

### Financial sector stability and bank disengagement
- Large undercapitalized bank:
  - Government settled cross-arrears of about CFAF 4.7 billion in 2022 to the bank, paid directly for government suppliers, significantly improving the bank’s situation.
  - Due diligence by a potential strategic investor completed; investor reiterated interest in purchase.
  - Final terms of agreement being negotiated and expected to be submitted to the Regional Banking Commission for evaluation in August 2023.
  - If divestment does not materialize, authorities committed to a new SB to commission an assessment of the bank’s financial position and a full independent audit of the loan portfolio (including NPLs) and prepare a viable plan to ensure recapitalization, resolution, or liquidation by end of program based on IMF recommendations (MEFP, ¶30).
- Contingent liabilities:
  - A possible failure in the undercapitalized bank disengagement strategy may generate contingent liabilities to recapitalize the bank or to compensate at least small depositors to retain confidence in the banking system.

### Governance, transparency, and rule of law reforms
- External audits and procurement transparency (MEFP, ¶24-25):
  - Audit Court approved audit report of the High Commissioner for COVID-19; report to be published and submitted to ANP after the election.
  - Progress in audits of Ministries of Finance and Health and other entities.
  - Directorate-General of Public Tenders (DGCP) continued to publish beneficial ownership information of all crisis-related contracts and will expand disclosure to other public contracts approved by COTADO.
- Rule of law, anti-corruption, AML/CFT (MEFP, ¶26-28):
  - Center for Access to Justice progressing on database of fundamental legislation.
  - Secretary General of Government finalizing draft law on new asset declaration regime; needs updating to reassign depository functions.
  - Authorities finalizing the national AML/CFT policy and action plan addressing risks from the national risk assessment and the Mutual Evaluation Report in February 2022; further Fund TA likely required.
- State property management (MEFP, ¶29):
  - In March 2023, government approved decree to transpose relevant WAEMU Directive.
  - New SB proposed to inspect all government houses occupied by former public servants without payments to tackle irregularities and misuse.

### Program modalities, conditionality, and financing assurances
- QPCs, SBs, and prior actions:
  - Authorities requested a waiver of non-observance of three QPCs for March 2023 based on corrective actions (new census, biometric devices installation at government offices in Bissau, streamlining of tax collection incentive payments, strict controls of discretionary expenditure through COTADO).
  - Authorities requested an additional quarterly review and conversion of end-September 2023 indicative targets into QPCs; rephasing requested to make two disbursements of SDR 2.37 million on January 17, 2024 and April 17, 2024 (Table 8).
  - Understandings reached on newly proposed conditionality:
    - QPCs set for June 2024 consistent with fiscal framework.
    - Prior action: Ministerial order requiring Treasury to pay all debt service by due date (or on dates specified by Minister for CFAF-denominated service).
    - Four new SBs proposed for next 12 months to: (i) accelerate professionalization of DGCI (MEFP, ¶10), (ii) implement expenditure controls through COTADO (MEFP, ¶12), (iii) require external debt service payments by the due date (MEFP, ¶22), and (iv) improve governance of state property (MEFP, ¶29).
- Program financing:
  - Program is fully financed with firm commitments for next 12 months and good prospects for remainder of program.
  - Budget support grants included in 2023 budget: CFAF 4.4 billion.
  - Additional budget support raised: CFAF 2.0 billion, which will fully cover financing needs for next 12 months.
  - Additional grants likely throughout program catalyzed by ECF arrangement and strong donor engagement.
- Capacity to repay the Fund:
  - Under baseline, outstanding obligations to the Fund based on existing and prospective drawings would peak in 2025 at 167 percent of quota or 2.8 percent of GDP.
  - Peak debt service would be 2.2 percent of revenues (excluding grants) or 2.0 percent of exports in 2030.
  - Capacity to repay subject to significant downside risks; risks mitigated by government commitment to implement program and strong track record of servicing debt.

*Source: IMF staff report text provided.*

### 27.      Safeguards Assessment. The 2023 update assessment of the BCEAO found that the

### 1gnbea2023003 - 27.      Safeguards Assessment. The 2023 update assessment of the BCEAO found that the

### Safeguards Assessment
- The 2023 update assessment of the BCEAO found that the institution continues to have a robust control environment with strong governance arrangements.
- All recommendations from the 2018 safeguards assessment have been implemented.
- Financial reporting and external audit arrangements remain in line with international practices.

### Staff Appraisal — outlook and risks
- The economic outlook remains positive but is subject to significant downward risks.
- Growth is expected to recover slightly in 2023, but faces substantial uncertainty from:
  - worsening global economic outlook,
  - tighter global and regional financing conditions,
  - climate shocks.
- Inflation is expected to persist in 2023 and could accelerate with additonal shocks.
- Materialization of these risks could add pressures on the domestic environment constraining growth recovery.

### Program performance and near-term fiscal challenges
- Staff commends the authorities on satisfactory program performance, despite extremelly challenging environments.
- All but three QPCs were met for March 2023.
- The outlook for achieving the June 2023 targets is equally challenging because of:
  - the increase in wage bill mainly due to the reinstatement of workers suspended or supposed to be blocked by the 2022 census,
  - additional fiscal costs of 0.6 percent of GDP to make a one-off spending for meeting the EAGB’s unpaid invoices and carrying out the electoral census.
- Authorities immediately took a series of corrective actions to ensure meeting the targets for the rest of the year.
- The authorities implemented SBs well ahead of deadlines and requested an additional quarterly review for closer monitoring during a period of high uncertainty after the legislative election.

### Political developments and reform momentum
- The successful completion of the legislative election on June 4, 2023 has strengthend the national consensus on critical reforms.
- A change in the government will not affect the authorities’ commitment to the program, which is supported by all major parties at different ends of the political spectrum.
- After completing the opening session required by constitutional law, the new parliament is expected to approve priority legislative reforms, including:
  - the 2023 Budget Law,
  - the law on the new asset declaration regime,
  - the new Customs Code.

### Fiscal policy priorities and recommendations
- Wage bill controls remain crucial to stay on track with the fiscal consolidation path and secure debt sustainability.
- Domestic revenue mobilization is picking up the pace.
- Reactivation of the COTADO will strengthen controls of non-wage expenditure.
- To meet the wage bill targets, the authorities should promptly implement a new census of public workers in the key ministries with largest saving potential.

### EAGB (electricity utility) fiscal risks and mitigation
- Staff is encouraged by the substantial progress in mitigating imminent fiscal risks from EAGB.
- The fast installation of 35,000 pre-paid meters, which is expected to be completed by the end July, 2023, will increase the revenue to stay current on payments to the power supplier for the rest of the year.
- To ensure the EAGB’s financial viability, the authorities should:
  - continue renegotiation with the power supplier,
  - accelerate improvements to the distribution grid and the company’s governance,
  - connect to the regional power grid.

### Governance, rule of law, and AML/CFT
- Staff recommends the authorities to continue strengthening the governance reforms.
- Staff welcomes progress in:
  - the priority audits by the Audit Court,
  - transparency in beneficial ownership information,
  - reform implementation in state property management.
- To strengthen the rule of law reform, the authorities should secure funding for meeting the minimum level of operating costs in the judicial sector.
- The authorities should also speed up the prepartion of a national AML/CFT policy, which will lay a foundation for other reforms in this area.

### Program support, financing, and reviews
- Based on the satisfactory program performance and the authorities’ strong policy commitments, staff supports the completion of the second review of the ECF supported program.
- Staff also supports the authorities’ request for:
  - a waiver of nonobservance of performance criteria,
  - the rephasing of access under the ECF arrangement.
- Staff recommends completion of the financing assurance review.

*Source: IMF staff estimates and projections.*

### Annex I. Risk Assessment Matrix

### Annex I. Risk Assessment Matrix

### External Risks
- Intensification of regional conflicts.
  - Relative Likelihood: High
  - Expected Impact If Realized / Time Horizon: High / ST
  - Description: Escalation of Russia’s war in Ukraine or other regional conflicts and resulting economic sanctions disrupt trade (e.g., energy, food, tourism, and/or critical supply chain components), remittances, refugee flows, FDI and financial flows, and payment systems. Deepening geo-economic fragmentation. Broader and deeper conflicts and weakened international cooperation lead to a more rapid reconfiguration of trade and FDI, supply disruptions, technological and payments systems fragmentation, rising input costs, financial instability, a fracturing of international monetary and financial systems, and lower potential growth.
  - Expected Impact Details:
    - The economy would be hit hard by disruptions in the supply chain and business in general.
    - Increase in inflation, food insecurity and poverty.
    - Additional pressure on public expenditure and tax exemptions, which jeopardize fiscal consolidation strategy and sustainability.
    - Balance of payments imbalances generated by the worsening conditions of the current or financial accounts.
  - Policies to Mitigate Risks:
    - Create fiscal space through wage bill control, spending review and revenue mobilization for new policies to mitigate supply shocks in the economy.
    - Prioritize and target public spending towards the most vulnerable people.
    - Review and reprioritize tax exemptions for programs with higher economic and social impact.
    - Mobilize additional grants and concessional loans from development partners to cover more persistent external needs.

- Abrupt global slowdown or recession.
  - Relative Likelihood: High
  - Expected Impact If Realized / Time Horizon: High / ST
  - Description: Global and idiosyncratic risk factors combine to cause a synchronized sharp growth downturn, with recessions in some countries, adverse spillovers through trade and financial channels, and markets fragmentation. Europe: Intensifying fallout from the war in Ukraine, worsening energy crisis and supply disruptions, and monetary tightening exacerbate economic downturns and housing market corrections. China: Greater-than-expected economic disruptions from COVID resurgence, rising geopolitical tensions, and/or a sharper-than-expected slowdown in the property sector disrupt economic activity. EMDEs: A new bout of global financial tightening, possibly combined with volatile commodity prices, leads to spiking risk premia, debt distress, widening of external imbalances, fiscal pressures, and sudden stops.
  - Expected Impact Details:
    - Volatility in cashew nut prices and demand.
    - Balance of payments imbalances generated by the worsening conditions of the current or financial accounts.
    - Higher debt financing costs.
    - Reduced fiscal space and need for additional fiscal consolidation efforts.
  - Policies to Mitigate Risks:
    - Review and reprioritize public spending towards programs with higher economic and social impact.
    - Create fiscal space to tackle financial vulnerabilities.
    - Mobilize additional grants and concessional loans from development partners to cover more persistent external needs.

- Monetary policy miscalibration.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: High / ST
  - Description: Amid high economic uncertainty and volatility, major central banks slow monetary policy tightening or pivot to loosen monetary policy stance prematurely, de-anchoring inflation expectations and triggering a wage-price spiral in tight labor markets.
  - Expected Impact Details:
    - Increase in inflation, food insecurity and poverty.
    - Social unrest.
    - Financial and monetary aggregates volatility.
  - Policies to Mitigate Risks:
    - Adjust fiscal policy to anchor expectations of economic agents.
    - Prioritize and target public spending towards the most vulnerable people.
    - Monitor macro-financial risks.

- Commodity price volatility.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: Medium
  - Description: A succession of supply disruptions (e.g., due to conflicts and export restrictions) and demand fluctuations (e.g., reflecting China reopening) causes recurrent commodity price volatility, external and fiscal pressures, and social and economic instability.
  - Expected Impact Details:
    - Deterioration of fiscal position.
    - Increase in inflation, food insecurity and poverty.
    - Social unrest.
    - Delayed fiscal adjustment and structural reforms.
  - Policies to Mitigate Risks:
    - Create fiscal space through wage bill control, spending review and tax mobilization.
    - Prioritize and target public spending towards the most vulnerable people.
    - Encourage diversification of the economy.

- Further adverse cashew nut price movements.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: Medium / ST, MT
  - Description: A weaker than projected price recovery of the dominant export product would hamper economic recovery.
  - Expected Impact Details:
    - Private sector incomes come under pressure, denting economic activity.
    - Government revenues further diminish, leaving less room for priority spending.
    - Balance of payments problems generated by the worsening of the current account.
  - Policies to Mitigate Risks:
    - Control public expenses to compensate for lower revenues.
    - Step up diversification efforts.

- Cyberthreats.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: Medium High / ST
  - Description: Cyberattacks on critical domestic and/or international physical or digital infrastructure (including digital currency and crypto ecosystems) trigger financial and economic instability.
  - Expected Impact Details:
    - Impact on public services that rely on digital infrastructure.
  - Policies to Mitigate Risks:
    - Create contingent plans for cyberattacks.
    - Assess the risk and impact of cyberattacks on public services.

- Note on probability classifications included in the RAM:
  - “low” is meant to indicate a probability below 10 percent, “medium” a probability between 10 and 30 percent, and “high” a probability between 30 and 50 percent.
  - The RAM reflects staff views on the source of risks and overall level of concern as of the time of discussions with the authorities. Non-mutually exclusive risks may interact and materialize jointly. The conjunctural shocks and scenario highlight risks that may materialize over a shorter horizon (between 12 to 18 months) given the current baseline. Structural risks are those that are likely to remain salient over a longer horizon.

### Domestic Risks
- Social discontent and political risks.
  - Relative Likelihood: High
  - Expected Impact If Realized / Time Horizon: High / ST, MT
  - Description: Supply shocks, high inflation, real wage drops, and spillovers from crises in other countries worsen inequality, trigger social unrest and political tensions, and give rise to financing pressures and damaging populist policies. This exacerbates imbalances and slows growth.
  - Expected Impact Details:
    - Delayed fiscal adjustment.
    - Political instability.
    - Limited financing inflows and investment projects delays.
    - Supply disruptions and weaker confidence.
  - Policies to Mitigate Risks:
    - Prioritize and target public spending towards the most vulnerable people.
    - Create fiscal space through wage bill control, spending review and tax mobilization.
    - Mobilize additional grants and concessional loans from development partners to cover more persistent external needs.

- Systemic financial instability.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: Medium / High / MT
  - Description: Sharp swings in real interest rates, risk premia, and assets repricing amid economic slowdowns and policy shifts trigger insolvencies in countries with weak banks, causing markets dislocations. Domestic banking instability may also arise from high NPLs, and bank’s undercapitalization.
  - Expected Impact Details:
    - Limited credit extension hampers investment and growth.
    - Potential contingent liabilities adding to fiscal pressures.
  - Policies to Mitigate Risks:
    - Enhance banking supervision and enforce prudential regulations.
    - Improve processes and procedures for collection of debts and collateral.
    - Create fiscal space to absorb financial shocks.

- Continued weaknesses in state-owned enterprises.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: Medium / High / ST
  - Description: The public electricity and water utility (EAGB), in particular, has been a long-standing problem.
  - Expected Impact Details:
    - Limited and expensive electricity and water supply.
    - Potential contingent liabilities adding to fiscal pressures.
  - Policies to Mitigate Risks:
    - Implement credible strategy to improve management of public enterprises.
    - Improve governance, transparency and accountability.

- Extreme climate events.
  - Relative Likelihood: Medium
  - Expected Impact If Realized / Time Horizon: High / ST, MT
  - Description: Extreme climate events cause more severe than expected damage to infrastructure (especially in smaller vulnerable economies) and loss of human lives and livelihoods, amplifying supply chain disruptions and inflationary pressures, causing water and food shortages, and reducing growth.
  - Expected Impact Details:
    - Harm cashew production worsening the livelihood of people in rural areas and exacerbating extreme poverty and inequalities.
    - Higher recovery spending, higher financing costs, and lower revenues.
    - Supply disruptions and weaker confidence.
  - Policies to Mitigate Risks:
    - Diversify the economy.
    - Address infrastructure gaps and income/developmental disparities among regions, while instituting appropriate social safety nets.
    - Promote investment in climate resilient infrastructure.

### Annex II. Action Plans for Governance-Related Reforms — Key Objectives and Timelines
- Overall focus: Build on achievements under the SMP and the 2020 Governance Diagnostic Assessment; complement SBs in governance by providing intermediate steps to enhance reform effectiveness.
- Reform areas: (i) revenue administration; (ii) PFM; (iii) AML/CFT and public procurement; and (iv) anti-corruption and rule of law.
- Revenue administration:
  - Address challenges: (i) extensive administrative discretion; (ii) political interference in hiring decisions; (iii) inadequate exchange of information among public entities; and (iv) outdated information technology systems.
  - Action plans include 24 priority actions to be implemented between March 2023 and June 2025.
  - Recent progress: launching of public tenders of IT specialists for the DGCI in May 2023.
- PFM:
  - Action plans for TSA implementation and public investment management.
  - TSA implementation to advance cash management reforms and establish transparency and controls of extrabudgetary fees and charges.
  - Strengthen central agencies’ roles in assessing project feasibility and affordability to prevent cost overruns and delays.
  - Support reforms with gradual improvement of fiscal and debt data according to international standards.
- AML/CFT and public procurement:
  - February 2022 MER by GIABA gave low effectiveness ratings in all 11 criteria; substantial progress required.
  - Action plan priorities:
    - Finalize the national AML/CFT policy and action plan addressing NRA and MER findings by end-December 2023.
    - Require all legal persons registering at CFE and DGICRN to submit a BO identification form similar to the one submitted as part of the tender process by end-June 2024.
    - Present an action plan to strengthen risk-based AML/CFT supervision for financial institutions and DNFBPs by end-December 2023.
  - DGCP to expand beneficial ownership disclosure for a broader range of public contracts and support publication of CGE audit reports highlighting public contracts breaching DGCP and Audit Court authorization.
- Anti-corruption and rule of law:
  - Focus areas:
    - Strengthening and operationalizing the asset declaration regime in line with international good practices, including the G-20 High Level Principles on asset disclosure by public officials.
    - Supporting rule of law and access to justice; ensuring public access to fundamental legislation and information on court fees and procedures free of charges.
    - Updating and implementing recommendations from the 2020 Governance Diagnostic Report where appropriate.

### Annex II. Selected Timeline Items from Fiscal and AML/CFT Action Tables (as presented)
- Fiscal Reforms: Summary Action Plan 2023–25 (selected entries and dates preserved exactly as shown):
  - In-depth pre-clearance examination and post-clearance audit of selected goods — DGA: Mar-23, Jun-23, Sep-23, Dec-23, Jun-24.
  - Application of new penalties — DGA: Mar-23.
  - Implement electronic mailboxes with large taxpayers and roll out to medium and small taxpayers — DGCI: Mar-23, Jun-23, Sep-23, Dec-23, Jun-24, Dec-24, Jun-25.
  - Hire IT specialists — DGCI: Mar-23.
  - Update census and study of public bank accounts and classify them into those to be closed, maintained or integrated into TSA — DGTCP: Mar-23, Jun-23, Sep-23.
  - Create cash management units and approve cash forecasts with longer horizon and improved methods — DGTCP: Mar-23, Jun-23, Sep-23.
  - Execute expenditure from the TSA, starting with the wage bills — DGCTP: Mar-23.
  - Establish a monthly reporting process for externally financed capital expenditure — MoE: Mar-23.
  - Create an excel-based medium-term PIP database — MoE: Mar-23.
  - Ensure clear prioritization of projects based on cost estimates — MoE: Mar-23.
  - Establish regulatory framework for project appraisal, allocation, and implementation — MoE: Mar-23.

- AML/CFT and Public Procurement: Action Plan 2023–25 includes similar dated entries (Mar-23 through Jun-25) for tasks such as in-depth pre-clearance examinations, implementing electronic tax services, audits of VAT differences, appointing senior staff through public tender, and TSA-related IT and reporting interfaces.

### Annex III. National Development Plan 2020–23 — Summary
- The National Development Plan (PND) 2020-23 is the current national strategy for poverty reduction and inclusive growth.
- Implementation began in September 2020 on approval by the ANP.
- Originally scheduled to expire at the end 2023, the PND is expected to be extended until the mid-2024 to provide sufficient time to prepare the new PND based on the priorities of the new government after the legislative election in June 2023.
- Central and Strategic Objectives of PND 2020–23:
  - Central Objective: Combat the COVID-19 as an opportunity to have a fresh-start of the economy.
  - Strategic Objective 1: Consolidate the democratic rule of law and reform and modernize the public institutions.
  - Strategic Objective 2: Reform the economy and promote the growth and jobs.
  - Strategic Objective 3: Develop the production sector and infrastructure of the country.
  - Strategic Objective 4: Promote the human capital and improve the population’s living conditions.
  - Strategic Objective 5: Reinvigorate the foreign policy and promote the regional integration and the Guinean diaspora.
  - Strategic Objective 6: Preserve biodiversity, combat climate change, and promote natural resources.

*Source: 1gnbea2023003 - Annex I. Risk Assessment Matrix*

### 2.      The PND 2020-23 was prepared by following the constitutional process and the

### 1gnbea2023003 - 2.      The PND 2020-23 was prepared by following the constitutional process and the

### Preparation and stakeholder consultation
- The PND 2020-23 was prepared following Articles 85 and 100 of the Constitution, requiring a PND to be prepared by the Government and approved by the ANP.
- The PND process had been discontinued after the last PNDs approved in the 1980s and 90s and was revived by the PND 2020-23 under the leadership of the current government.
- Preparation involved intensive consultation within government and with social and professional associations, private sector entities, and civil society organizations to align the PND with development needs and priority activities of each sector.
- After PND approval, line ministries and local governments prepared sectoral and regional development plans to detail activities and projects.

### Implementation challenges and project execution
- The PND includes 429 projects; planning and implementation have been severely affected by the COVID-19 pandemic and the cost-of-living crisis following the war in Ukraine.
- Execution statistics:
  - Between 2020 and 2021, only 94 out of 293 projects included in the government budgets had some amount of execution.
  - In 2022, only 76 out of 467 projects included in the government budget had some amount of execution.
- Although the execution rate of the Public Investment Program budget was close to 100 percent in total for these years, there was under-execution of several small, domestically financed projects, particularly in productive sectors (agriculture, tourism, etc.).
- Assessment:
  - Objectives and strategies in the PND 2020-23 remain valid for poverty reduction and inclusive growth.
  - It will be difficult to achieve all objectives during the rest of the PND period; many projects and activities are likely to be carried over to, and reprioritized in, the new PND.

### Lessons for public investment management and recommended actions (from MoE Annual Report of PIP)
- Develop an excel-based PIP database
  - The end-December 2023 SB requires the development of an excel-based PIP database as a key tool for the MoE to monitor and facilitate project implementation.
- Develop a monthly reporting system of externally financed expenditure
  - Current reporting of externally financed projects is quarterly; the MoE issued a ministerial order to require monthly reporting from Project Implementation Units, starting with top 30 projects.
  - A new online system expected to be operationalized in June 2023 will facilitate implementation of the ministerial order.
- Organize a steering committee for project monitoring
  - Proposal to create a steering committee composed of representatives of different line ministries, chaired by the MoE and composed of Project Implementation Units and parent ministries, to strengthen communication and support project reporting.
- Gradually develop project appraisal capacity in the MoE PIP Service Directorate
  - Medium-term objective: establish the MoE’s central role in project planning and selection.
  - First step: pilot project planning documents at small domestically financed projects (example: project to construct court houses in remote provinces) to provide experience in a “light touch” project appraisal.

### Program performance and macroeconomic context (Letter of Intent / MEFP highlights)
- Program performance (end-March 2023 QPCs)
  - The government met five out of eight quantitative performance criteria (QPC).
  - Missed targets and shortfalls:
    - Floor on tax revenue missed by CFAF 0.3 billion (due mainly to lower custom collection).
    - Ceiling on wages missed by CFAF 0.6 billion (mainly due to lower-than-expected savings from the 2022 census).
    - Floor on the domestic primary balance missed by CFAF 10.8 billion; CFAF 7.9 billion will be compensated in coming months, remainder mainly due to one-off spending for electoral census and overrun of wage and non-wage recurrent expenditures.
  - Structural benchmarks (SBs)
    - Eight SBs achieved in five months since program start, ahead of deadlines (example: installing 10,000 pre-paid electricity meters noted earlier; later reported 14,401 pre-paid electricity meters by 31 May 2023 and publication of the first state-owned enterprise report).

- Economic developments and outlook
  - 2022 outcomes:
    - Growth estimated at 4.2 percent.
    - Average inflation increased to 7.9 percent.
    - Overall fiscal deficit remained at 5.9 percent of GDP.
    - Public debt increased to 80.3 percent of GDP in 2022 (causes: higher fiscal deficit, new government guarantees mainly to EAGB, and recognition of legacy arrears).
  - Near-term 2023 expectations:
    - Growth expected to recover to 4.5 percent, supported by sustained cashew nut exports and higher private sector investments including in the energy sector.
    - Inflation expected to remain high in 2023 at about 7.0 percent due to continuing high food and fuel prices.
  - Medium-term projections:
    - Growth expected to increase to around 5 percent, supported by political stability, structural reforms, and higher investments.
    - Fiscal consolidation strategy aims to bring fiscal deficit and debt ratio within 3 percent of GDP by 2025 and 70 percent of GDP by 2026, in line with the WAEMU convergence criteria.

### Fiscal policy, revenue mobilization, and specific reform measures
- Revenue mobilization priorities and measures
  - Professionalization of the Directorate-General of Duties and Taxes (DGCI)
    - Key priority for revenue administration and implementing the new VAT law.
    - As specified in ministerial order of time-bound action plans between 2023 and 2025:
      - Appoint all managerial positions of the DGCI through open and competitive selection process in early 2024 (SB, end-December 2023).
      - Minister of Finance to prepare redeployment plan to reallocate DGCI managers not appointed through open competitive process to other positions outside the DGCI.
      - Issue a streamlined policy for incentive payments to tax officers: suspend all incentives of DGCI’s unqualified managers by the end July 2023 and introduce performance-based incentives in 2024.
  - Taxes on cashew export
    - To facilitate the 2023 campaign, the government agreed to lower reference prices.
    - To improve transparency and avoid revenue losses, publish a monthly cost structure report comparing market and reference prices and intermediary costs, and monitor tax rate to market price, starting from June 2023.
  - Tax exemptions for imported goods
    - Two new ministerial orders issued to streamline tax exemptions for imported goods to mobilize additional revenues to compensate underperformance in tax collection from imports.
  - Mobilization of 5G license fees
    - Government will bolster efforts to conclude the 5G licensing process to raise substantial nontax revenue.
    - Negotiation led by the Vice Prime Minister and the MoF; the National Regulatory Authority (ARN) expected to establish the license fee schedule by the end September 2023.
  - Legislative reforms
    - Preparation begun of revised law on the general exemption regime to be submitted to Parliament after the election (SB, end-December 2023).
    - Revised income tax and stamp duties bills to be submitted to Parliament in the medium-term (SB, end-June 2025).
    - Prepare an action plan to develop a register of resource rights holders and undertake diagnosis of the fiscal regime for natural resources to guide implementation of the WAEMU Directive (SB, end-June 2024).

### Wage bill controls and public employment integrity
- Measures and past actions
  - Significant corrective measures in 2022 to reduce nominal wage bill, including dismissal of irregular and ghost workers and streamlining of advisor positions by two-thirds (i.e., 51 people) at the Presidency, the Prime Minister’s Office, the Presidency of the Parliament, the Presidencies of the Supreme and Audit Courts, and Prosecutor’s Office.
  - Total freezing of new hiring and capping of salaries in multiannual staffing plan; further reductions through retirement-driven headcount decline.
- Planned measures to control wage bill and strengthen payroll integrity
  - Include corrective measures in the draft 2023 budget to be submitted to Parliament to:
    - Close the appeal process of the census.
    - Undertake a new census of public workers in the Ministries of Education, Health, Interior, and Finance.
    - Install biometric devices to check employee attendance at government offices in Bissau.
    - Streamline policy for tax collection incentives.
  - Prevent recurrence of irregular hiring through continuous quarterly payroll reconciliation and deployment of the IMF-supported blockchain project to ensure integrity of the reconciliation process.
  - Medium-term objective: integrate personnel and payroll records via development of an integrated human resource management system.

*Source: 1gnbea2023003 - Extracts from the IMF staff report, Letter of Intent, and Memorandum of Economic and Financial Policies (MEFP) contained in the provided PDF content.*

### 12.      We will speed-up implementation of commitment controls to prevent upward drift of

### 1gnbea2023003 - 12.      We will speed-up implementation of commitment controls to prevent upward drift of

### Commitment controls and non-wage recurrent expenditure
- We will reintroduce commitment controls discontinued in 2018 to ensure goods and service and other recurrent expenditures are controlled within monthly Treasury Plan ceilings. (SB, continuous until the end-December 2023).
- As an urgent measure, all commitments of discretionary spending will require approval by the Technical Committee of Arbitration of Budgetary Expenditure (COTADO) and its summary decisions will be sent to the President of Republic for ex-post review. (SB, continuous until the end-December 2023).
- The Ministry of Finance (MoF) approval will be required for public contracts for purchases of four key food items (rice, cooking oil, meat, and fish) and fuel, which are currently purchased without contracts. (SB, end-March 2024).
- The MoF approval requirement will be expanded to purchases of medicines and laboratory materials.
- Commitment: no overspending except in the case of force majeure as defined in the WAEMU Directive N°06/2009/CM/UEMOA on Finance Laws.

### Safeguarding social and priority spending; public investment management
- Priority social spending is projected to increase by 0.6 percentage points of GDP compared to the average of pre-Covid-19 period, reflected in the program floor on social and priority spending.
- Public Investment Project (PIP) database: creation of an Excel-based medium-term PIP database and centralization of quantitative information included in the Fichas de Projeto. (SB, end-December 2023).
- Externally financed capital expenditure monthly reporting: a ministerial order issued to create a monthly reporting process, first piloted at the largest 30 projects.

### Electricity sector restructuring and EAGB financial measures
- EAGB’s deteriorated financial situation endangered power supply; reliance on short-term financing and several months of unpaid invoices to the sole power supplier prompted government intervention.
- Government paid three months of EAGB’s unpaid bills to the sole energy supplier in April 2023 to avoid interruption of power supply.
- EAGB plans to remain current in payments to the sole power supplier for the rest of the year.
- After transfer of EAGB oversight from the Ministry of Energy to the MoF, revenue mobilization efforts achieved installation of 14,401 pre-paid meters in 52 days.
- Target: complete installation of total 35,000 pre-paid meters at residential clients with post-paid meters by July 2023 (SB, end-December 2023) to secure CFAF 2 billion of monthly revenue target for not running arrears with the power supplier.
- A report with strategies and action plans to reestablish EAGB’s financial situation will be prepared. (SB, end-September 2023).
- Renegotiation of power supply contracts with Karpower is a main pillar; the 2020 addendum plans to increase capacity from 30MW to 70MW until the end 2025 and is not realistic based on current and future electricity needs.
- The Audit Court will complete and publish an audit report of EAGB’s power purchase agreement and its addendums. (SB, December 2023).
- Management and operations reforms: select new management on a merit basis through open competitive process with World Bank support; restructure the accounting department to internalize accounting and record-keeping functions to avoid outsourcing. (SB, end-September 2023).

### Improving Treasury management and implementing the Treasury Single Account (TSA)
- TSA implementation actions:
  - Establish an interface between the systems of the Treasury, BCEAO, and commercial banks and classify government accounts to be closed, maintained, or integrated into the TSA. (SB, end-September 2023).
  - New census of government bank accounts completed (about 700 accounts) revealing significant positive and negative balances.
  - Monitor balances of government bank accounts on a monthly basis; settle and close unnecessary accounts, including those with negative balances.
  - Foundation to pay all budgetary expenditure, particularly wages, from the TSA. (SB, end-June 2024).
  - Revise cash forecasting methodologies and processes incorporating lessons from the newly created CMU’s experience. (SB, end-June 2025).
- Coordination with revenue-generating entities:
  - Strengthen coordination with the Ministry of Fisheries through quarterly census reporting of industrial fishing activities starting from March 2023 census.
  - Publish a list of rates, scales and tariffs of all fees and charges collected by ministries and government agencies as part of the 2024 budget. (SB, end-December 2023).
  - Require ministries and government agencies to publish the same list on their websites and report actual collection during 2024.
  - Require all fees and charges to be approved in the General State Budget and deposited into the TSA.

### Mitigating debt vulnerabilities and debt management
- Debt levels (2022): total public debt estimated at 80.3 percent of GDP; external debt estimated at 39.2 percent of GDP.
- Share of credits from the Fund, World Bank, and African Development Bank in total external public debt estimated at 42 percent in 2022.
- Share of all multilateral creditors in total external public debt was 80 percent in 2022.
- Policy stance: reduce reliance on non-concessional borrowing from BOAD during the program; zero ceiling on new non-concessional borrowing (except for the BOAD Development and Cohesion Fund).
- Projections by 2028: total public debt to decline to 65.7 percent of GDP; external debt to decline to 27.0 percent of GDP.
- Domestic arrears: plan to start clearing remaining stock of domestic arrears accumulated between 1974 and 1999 amounting to CFAF 12.2 billion in the coming years; further auditing and verification planned to determine the true amount of outstanding domestic arrears.
- Legacy external arrears: agreements/settlements reached with Libya, Taiwan Province of China, Angola, and Russia; negotiations with Brazil pending final approval; requests sent to Pakistan since November 2021 to attempt resolving remaining external arrears.
- Joined the Debt Service Suspension Initiative (DSSI) and will explore debt reprofiling and restructuring with development partners if downside risks materialize.
- Strengthening debt service discipline:
  - Ministerial order requiring the Treasury to pay all external debt service by the due date or if denominated in CFAF, on the dates specified by the Minister of Finance (Prior Action).
  - DGTCP to issue bank instructions for external debt service by the due date or on dates specified by the Minister of Finance and send copies to the Treasury Committee for monitoring. (SB, continuous).
  - Publish annual reports on debt (external and domestic) and expand coverage to include debt from the two largest SOEs that pose largest fiscal risks (EAGB and the civil aviation authority); publish quarterly debt bulletins including central government debt and guarantees.
- New external borrowing policy: contract external debt only on highly concessional terms and consult with the IMF on financial terms of new proposed loans.

### Governance, procurement, audits, AML/CFT, anti-corruption, and rule of law reforms
- Public procurement reforms:
  - Expand publication of beneficial ownership information to all public contracts on DGCP website per decree on beneficial ownership of bidders (April 2022).
  - Implementing guidelines issued and training sessions held for suppliers and procurement officers.
  - Enforce DGCP’s prior authorization of public procurement and contracts for discretionary expenditure, including direct purchases and emergency expenditure, through DGCP’s participation in COTADO.
- External audits and transparency:
  - Audit Court published audit of High Commissioner for COVID-19 spending (June 2022).
  - Independent third-party auditor completed audit of COVID-19 related spending (June 2020–December 2021) and published report.
  - Government committed to publishing revised financial reports of the High Commissioner incorporating auditor recommendations by June 2023.
  - Audit Court undertaking external audit of all COVID-19 related spending using independent audit as input per Organic Law on the Audit Court.
  - Ministry of Finance requested an audit of irregular hiring process in 2021-22, planned for completion in 2023.
  - MoF to finalize and submit consolidated financial statements for 2017-2022 to the Audit Court for audit in the medium-term.
- AML/CFT reforms:
  - GIABA February 2022 MER gave Guinea-Bissau low effectiveness ratings in all 11 criteria.
  - Prepare national AML/CFT policy and action plan addressing NRA and MER findings to be completed by June 2023.
  - Require all legal persons registering at the Centre for Formalization of Enterprises (CFE) and at the Directorate General of Civil Identification, Registry and Notary (DGICRN) to submit a beneficial ownership identification form similar to the tender process by end-June 2024.
  - Prepare an action plan to strengthen risk-based AML/CFT supervision for financial institutions and DNFBPs by June 2023.
- Anti-corruption framework:
  - Resubmit to Parliament the law reforming the asset declaration regime with broader coverage and strengthened enforcement. (SB, end-September 2023).
  - Law to be in line with G20 High Level Principles and assign depository responsibilities to an independent institution such as the Supreme Justice Court.
  - Issue guidelines for submission and publication of asset declarations, including formats, by end-2023.
  - Prepare a national anti-corruption strategy in 2024 based on updated corruption risk diagnosis; prioritize legal and other reforms and inform medium-term resource planning for relevant institutions.
- Rule of law and market regulations:
  - Center for Access to Justice (CAJ) established; roll out CAJ offices to two remaining provinces in 2024 and provide operational funding starting in April 2023.
  - Formalize employment of CAJ workers kept on probationary status by September 2023.
  - Develop CAJ website including database of fundamental legislation and legal literacy information. (SB, end-March 2024). Website to provide free access to legislation and CAJ services.
  - Strengthen institutional framework and sustainable financing model for CAJ in 2024 with IMF technical assistance.
  - Prepare medium-term action plan to develop property registration, improve cadaster coverage, and digitalize property registers to improve public access.
  - By December 2023, prepare strategic plan to ensure financial sustainability of the CFE to support digitalization of the companies’ register.
- State property management reforms:
  - Decree approved in March 2023 to transpose the WAEMU Directive on State Property Management.
  - Issue implementing regulations replacing outdated colonial-era provisions by September 2023.
  - Ministry of Public Works and National Secretariat of State Property (SNPE) to inspect all casas avaliadas sem pagamento to assess conditions, evaluate market values, and compare with register valuations. (SB, end-December 2023).
  - Inspector-General of Finance and SNPE to inspect major ministries by end-2023 to discover unused or misused government vehicles; recover and reallocate vehicles to other government entities.

*Source: Content unit 1gnbea2023003 (excerpts).*

### 30.      The government will continue to make efforts that preserve the stability of the

### 1gnbea2023003 - 30.      The government will continue to make efforts that preserve the stability of the

### Financial sector stability and bank disengagement
- The government is committed to a successful disengagement strategy for a large, undercapitalized bank.
- The council of ministers approved an offer of a strategic investor to buy the government stake and recapitalize the institution to comply with regulatory standards.
- The due diligence process has been successfully completed, and the investor has reiterated its interest in the purchase.
- The government is negotiating final terms of the agreement, which will subsequently be submitted to the Regional Banking Commission for evaluation.
- Contingency if operation does not materialize:
  - The government remains commited to a new SB to request an assessment of the bank’s financial position and a full independent audit of the loan portfolio including NPLs from a third-party auditing firm.
  - Prepare a report on a viable plan which ensures the bank is either recapitalized or resolved or liquidated by the end of the program based on the IMF recommendations.

### Statistics reforms
- Commitments and timelines:
  - Publish national accounts for 2019 by July 2023 and for 2020 by December 2023.
  - Establish a committee between the INE, MoF (Directorate-General of Forecasts and Economic Study), and BCEAO to validate national accounts data before publication.
  - Approved a decree enhancing the organizational structure and human and technological resources of the INE.
  - In 2024, begin increasing human resources of the INE as envisaged in the decree, particularly in its national accounts directorate, which currently has only two staff.
- Data dissemination:
  - Implement the Enhanced General Data Dissemination System (e-GDDS) to support timely publication of key macroeconomic and financial data aligned with common IMF surveillance indicators, enhance interagency coordination, and advance statistical development.

### Risks and contingencies
- Downside risks to the program include:
  - Growth and inflation setbacks from domestic political risks and weak state capacity.
  - Disappointing cashew nut exports.
  - Materialization of climate and health hazards.
  - Extreme tightening of financial conditions in the regional market.
  - Geopolitical tensions which could further impact food and oil prices and donor support.
- Additional risks:
  - Further tightening of global financial conditions and worsening of debt risks, constraining access to financing in regional markets.
  - Financial stress in SOEs and fragility in the situation of the undercapitalized bank generating contingent liabilities.
- Policy response if risks materialize:
  - Stand ready to adjust policies in close consultation with IMF staff to ensure achievement of program objectives.
  - Possible measures include further rationalization of non-priority expenditures, domestically financed investment, and requests for additional support from development partners.

### Program design, financing, and monitoring
- Program coordination and oversight:
  - MoF will coordinate program monitoring and consultation with other public institutions; MoF will provide oversight to ensure public spending complies with budget limits.
- IMF monitoring cadence:
  - IMF Executive Board will monitor the program.
  - Assessment quarterly until December 2023 and thereafter semi-annually using bi-annual performance criteria (end-June and end-December) and continuous performance criteria throughout program period.
- Review schedule:
  - Third review: based on end-June 2023 targets; expected on or after October 17, 2023.
  - Fourth review: based on end-September 2023 targets; expected on or after January 17, 2024.
  - Fifth review: based on end-December 2023 targets; expected on or after April 17, 2024.
  - Sixth review: based on end-June 2024 targets; expected on or after October 17, 2024.
- Government commitments:
  i. Refrain entering new external borrowing contracts at non-concessional rates, except disbursements from the Development and Cohesion Fund of the West African Development Bank as mentioned in TMU ¶8.  
  ii. Adhere to quantitative performance criteria (QPC) on floors and ceilings including floors on domestic tax revenues, the domestic primary budget balance and social and priority spending; ceiling on wages and salaries; zero ceilings on new non-concessional external debt contracted or guaranteed by the public sector (continuous criterion), new external payments arrears (continuous criterion), new domestic payments arrears, and non-regularized expenditures.  
  iii. Prepare an external borrowing plan to facilitate assessment of the QPCs on external debt.  
  iv. Agree not to: (1) introduce or intensify restrictions on payments and transfers for current international transactions; (2) introduce or modify multiple currency practices; (3) enter into bilateral payment agreements inconsistent with Article VIII of the IMF Articles of Agreement; and (4) introduce or intensify import restrictions for balance of payments purposes.  
  v. Adopt any new financial or structural measures necessary for success of policies, in consultation with the IMF.
- Financing outlook:
  - Firm commitments to financing for the next 12 months following the second review with good prospects for the remainder of the program period.
  - Expect additional budget support from other development partners including from the World Bank and the African Development Bank.
- Information sharing:
  - Government will provide IMF staff with information needed to assess progress as specified in the TMU and will consult with IMF staff on any measures as appropriate.

### Quantitative Performance Criteria and Indicative Targets (highlights from Table 1)
- Table context: Cumulative from beginning of calendar year to end of month indicated, CFAF billion, unless otherwise indicated.
- Selected QPCs and reported values/status:
  - Total domestic tax revenue (floor):  
    - Mar: 5.4 (Est.), Status: met  
    - Jun: 6.6 (Prel.), Status: met  
    - Sep: 21.4 (QPC), Status: 21.1 not met  
    - Dec: 53.8 (QPC)  
    - Mar (2024): 87.1 (QPC)  
    - Jun (2024): 113.7 (IT)  
    - Additional monthly values: 24.3, 61.2
  - Wages and salaries (ceiling):  
    - Mar: 5.7 (Est.), Status: met  
    - Jun: 4.9 (Prel.), Status: met  
    - Sep: 14.3 (QPC), Status: 14.9 not met  
    - Dec: 27.8 (QPC)  
    - Mar (2024): 41.8 (QPC)  
    - Jun (2024): 59.0 (IT)  
    - Additional monthly values: 15.1, 29.5
  - Ceiling on new non-concessional external debt contracted or guaranteed by the central government (US$ millions):  
    - Values across dates: 0.0, 0.0 (all reported entries), Status: met where indicated.
  - New external payment arrears (US$ millions, ceiling):  
    - Values: 0.0 across all reported entries, Status: met where indicated.
  - New domestic arrears (ceiling):  
    - Mar: 0.0 (Est.)  
    - Jun: 1.8 (Prel.), Status: not met  
    - Subsequent entries: 0.0 and met where indicated.
  - Social and priority spending (floor):  
    - Mar: 2.5 (Est.), Status: met  
    - Jun: 3.1 (Prel.), Status: met  
    - Sep: 12.5 (QPC), Status: 12.7 met  
    - Dec: 26.0 (QPC)  
    - Mar (2024): 38.8 (QPC)  
    - Jun (2024): 51.6 (IT)  
    - Additional monthly values: 13.5, 28.1
  - Domestic primary balance (commitment basis, floor):  
    - Mar: -4.3 (Est.), Status: met  
    - Jun: -3.5 (Prel.), Status: met  
    - Sep: -10.8 (QPC), Status: -21.6 not met  
    - Dec: -6.3 (QPC)  
    - Mar (2024): -5.7 (QPC)  
    - Jun (2024): -2.9 (IT)  
    - Additional monthly values: 1.2, 2.4
  - Non regularized expenditures (DNTs, ceiling): Values reported as 0.0 across entries and met where indicated.
- Memorandum item — New concessional borrowing:
  - Reported series: 7.0, 1.9, 11.7, 2.8, 18.7, 21.0, 23.4, 10.3, 18.9

### Prior actions and structural benchmarks (highlights from Table 2)
- Public Financial Management / Expenditure and wage bill control / Cash management:
  - Issue a ministerial order to require the Treasury to pay all external debt service by the due date or if denominated in CFAF, on the dates specified by the Minister of Finance — Status: Met — Date: Prior Action.
  - Conduct regular in-year (quarterly) reconciliations between personnel and payroll records — Status: Met — Date: March 2023/Continuous.
  - Approve by the Council of Minister a multiannual staffing plan for 2023-25 and publish results of full census of public servants — Date: June 2023.
  - Issue a ministerial order on revised composition of the Treasury Committee including active participation of the Ministry of Fisheries — Status: Met — Date: March 2023.
  - Establish an interface between systems of the Treasury, BCEAO, and commercial banks and classify public bank accounts — Date: September 2023.
  - Create a unit dedicated to cash management operations and revise the Treasury Committee's mission — Status: Met — Date: December 2023.
  - Require all commitments of discretionary spending to be approved by the COTADO and send summary decision to the President for ex-post review — Date: July 2023/continuous until end-December 2023.
  - Issue by DGTCP bank instructions for all external debt service by the due date or if denominated in CFAF on dates specified by the Minister of Finance and send copies to the Treasury Committee — Date: July 2023/continuous.
  - Conclude public contracts for purchases of four food items and fuel and obtain MoF approval — Date: March 2024.
  - Execute expenditure from the TSA, starting with the wage bill — Date: June 2024/continuous.
  - Revise processes and forecasting methodologies enhancing forecasting of cash flows — Date: June 2025.
- SOE oversight and fiscal risk mitigation:
  - Create and implement the Technical Unit for Monitoring SOEs (UTAM) under the MoF — Status: Met — Date: March 2023.
  - Prepare and publish quarterly and annual reports on SOEs’ performance, starting with most relevant SOEs — Status: Met — Date: June 2023/December 2024.
  - Installation targets for pre-paid meters for EAGB largest residential clients:
    - Complete installation of 10,000 pre-paid meters — Status: Met — Date: June 2023.
    - Complete installation of additional 25,000 pre-paid meters — Date: December 2023.
  - Prepare a report with strategy to reestablish financial viability of EAGB, including action plan and reinstate a functional accounting department — Date: September 2023.
  - Complete and publish an audit of EAGB's power purchase agreement and its ammendments — Date: December 2023.
- Public investment program / Revenue mobilization / Anti-Corruption and Rule of Law (selected):
  - Create an Excel-based medium-term PIP database — Date: December 2023.
  - Approve by Council of Ministers and submit to parliament: (i) revised law on the general exemption regime — Date: December 2023; (ii) revised income tax and stamp duties bills — Date: June 2025.
  - Prepare redeployment plan for DGCI directors and chiefs not appointed through open competitive process — Date: December 2023.
  - Report with action plan to enhance transparency and efficiency in fiscal regime for natural resources management — Date: June 2024.
  - Resubmit to parliament the Law reforming the Asset Declaration Regime after elections — Date: September 2023.
  - Issue guidance on beneficial ownership information for entities awarded public contracts — Status: Met — Date: March 2023.
  - Issue a ministerial order requiring all government entities to submit a tariff schedule of fees and charges in 2023 — Status: Met — Date: March 2023.
  - Publish on a government website a list of tariffs of all fees and charges as part of the 2024 budget — Date: December 2023.
  - Create a website of the CAJ with database of fundamental legislation — Date: March 2024.
  - Undertake inspection of all casas avaliadas sem pagamento jointly by Ministry of Public Works and National Secretariat of State Property — Date: December 2023.

### Attachment II — Technical Memorandum of Understanding (selected definitions and program parameters)
- Evaluation basis: All quantitative targets evaluated in terms of cumulative flows from the beginning of the period as specified in Table 1 of the MEFP.
- Program exchange rates:
  - For 2022 and 2023 foreign currency denominated values converted into local currency (CFAF) using program exchange rates of, respectively, CFAF 622.4 and 611.4/US$ and cross rates as of end-December 2022 and 2023.
- Definition highlights:
  - Total Domestic Tax Revenue: includes direct and indirect taxes as presented in the central government financial operations table.
  - Wage Bill: includes (i) personnel expenditure (“despesas de pessoal“), such as staff salaries and benefits, subsidies, and gratuities, and (ii) 50 percent of transfers to embassies.
  - Central Government definition: central administration of the Republic of Guinea-Bissau; excludes local administration, the central bank, and other public or government-owned entities with autonomous legal personality not included in the government flow-of-funds table (TOFE).
  - New Non-Concessional External Debt: all forms and maturities of new non-CFAF denominated debt contracted or guaranteed by the central government and CFAF denominated debt contracted with BOAD; applies on a continuous basis; excludes disbursements from the IMF and debts subject to rescheduling or for which verbal agreement has been reached.
- Adjustor to ceiling on new non-concessional external debt:
  - Ceiling will be adjusted upward by amounts of non-concessional financing from BOAD Development and Cohesion Fund for:
    a. National Financing Fund for SMEs – up to CFAF 10 billion cumulative during the program period;  
    b. Construction of the Bissau General Hospital – up to CFAF 10 billion cumulative during the program period;  
    c. Development of urban roads in the City of Bissau – up to CFAF 10 billion cumulative during the program period; provided that ceiling may be adjusted upward only up to CFAF 10 billion per year.
- Concessionality rule:
  - A debt is concessional if it includes a grant element of at least 35 percent, where grant element = (PV of debt subtracted from nominal value) / nominal value, using a unified discount rate of 5 percent.
  - Program reference rates: six-month USD SOFR = 2.73 percent and six-month EURIBOR = 2.00 percent; these remain fixed for the duration of the program for PV calculations.

*Source: Extract from the Memorandum of Economic and Financial Policies and Technical Memorandum of Understanding contained in the provided IMF document.*

### 9.      Reporting requirement. The government will report any new external borrowing and its

### 9. Reporting requirement. The government will report any new external borrowing and its

### Reporting requirements for external borrowing and non-regularized expenditures
- The government will report any new external borrowing and its terms to Fund staff as soon as external debt is contracted or guaranteed by the government, but no later than within two weeks of such external debt being contracted or guaranteed.
- Any treasury outlay not properly accounted for by the National Budget Directorate and/or not included in the budget is defined as non-regularized expenditure (DNTs).
- The government will report any non-regularized expenditures on a continuous basis within one week of realization.

### New External Payment Arrears of the Central Government (QPC definition and application)
- Definition:
  - External payment arrears, based on the currency test, are debt service payments that have not been paid on due dates (taking into account the contractual grace periods, if any) and that have remained unpaid 30 days after the due dates.
  - Arrears not to be considered arrears for the quantitative target, or “non-program” arrears, are:
    - (i) arrears accumulated on the service of legacy HIPC external debt for which there is a pre-existing request for rescheduling or restructuring; and/or
    - (ii) the amounts subject to litigation.
- Application:
  - For the purposes of this QPC, central government is as defined in paragraph 5 above.
  - This QPC will apply on a continuous basis effective on the date of approval of the ECF arrangement.

### New Domestic Arrears of Central Government (QPC definition)
- Definition of domestic arrears:
  - CFAF-denominated accounts payable (resto-a-pagar) accumulated during the year, and still unpaid by three months after the end of the month for wages and salaries (including pensions).
  - CFAF-denominated accounts payable still unpaid three months after the due dates for goods, services and transfers.
  - CFAF-denominated debt service payments that have not been paid on due dates (taking into account the contractual grace periods, if any) and that have remained unpaid 30 days after the due dates.
  - Non-CFAF denominated accounts payable that remains unpaid three months after the due dates.
- For the purposes of this QPC, central government is as defined in paragraph 5 above.

### Social and Priority Spending (definition)
- Social and Priority spending is defined to include spending in the Ministries of Health, Education and the Ministry of Women, Family and Social Cohesion.

### Domestic Primary Balance (Commitment Basis) (definition)
- The domestic primary fiscal deficit on a commitment basis is calculated as the difference between government revenue and domestic primary expenditure on commitment basis.
- Government revenue includes all tax and nontax receipts and excludes external grants.
- Domestic primary expenditure consists of current expenditure plus domestically financed capital expenditure, excluding all interest payments and capital expenditure financed by project loans or grants.
- Government commitments include:
  - all expenditure for which commitments have been approved by the Ministry of Finance;
  - automatic expenditure (such as wages and salaries, pensions, utilities, and other expenditure for which payment is centralized); and
  - expenditure by means of offsetting operations.

### Key program performance and macroeconomic figures reported
- Growth and inflation:
  - Economic growth in 2022 is expected to have slowed to 4.2 percent from 6.4 percent in 2021.
  - Average inflation in 2022 is estimated to rise to 7.9 percent.
  - Growth is expected to reach 4.5 percent in 2023.
  - Inflation is forecasted to remain high at around 7.0 percent in 2023.
  - Staff/authorities near-term outlook figures: economy expected to grow by 5 percent annually; inflation projected to stabilize at 2 percent.
- External sector:
  - Current account deficit in 2022 stood at 8.9 percent of GDP.
  - Current account deficit projected to improve in 2023 to 7.1 percent of GDP.
- Public finances and debt:
  - Fiscal deficit in 2022 remained at about 5.9 percent of GDP.
  - Public debt increased to 80.3 percent.
  - Authorities aim for WAEMU convergence criteria of 3 percent for the fiscal deficit by 2025 and 70 percent for public debt by 2027.
- Financial sector indicators:
  - Credit growth rate in 2022: 23.7 percent.
  - Non-performing loans (NPLs) decreased to 10.4 percent.
- Other program-relevant figures and actions:
  - The government reports selling 5G licenses as a corrective measure to improve fiscal targets.
  - 30,000 pre-paid meters have been installed at EAGB to improve revenue collection.
  - Authorities plan to implement biometric attendance control linked to payroll software and to expand it to other ministries.
  - Authorities plan to reinforce the Treasury Single Account (TSA) and install Treasury/banking system interfaces using BCEAO’s settlement system.
  - Authorities aim to rely to the extent possible on concessional resources as part of their financing strategy.
  - Authorities committed to avoiding accumulation of arrears by enforcing the ministerial order that prioritizes debt service over other spending.

### Reporting calendar highlights (selected items and deadlines from Table 1)
- Central Government budget and execution: Monthly — 30 days after the end of the month — DGPEE/MF
- Change in the stock of domestic arrears: Monthly — 30 days after the end of the month — DGPEE/MF
- Social and priority spending: Quarterly — 30 days after the end of the quarter — DGPEE/MF
- External and domestic debt and guaranteed debt by creditor: Monthly — 30 days after the end of the month — DGPEE/MF
- Stock of external debt: Monthly — 30 days after the end of the month — DGPEE/MF
- Disbursements: Monthly — 30 days after the end of the month — DGPEE/MF
- Interest payments: Monthly — 30 days after the end of the month — DGPEE/MF
- Copies of any new loan agreements: As occuring — DGPEE/MF
- All bank instructions for external debt service: Weekly — 7 days after the payments — DGPEE/MF
- Detailed consolidated balance sheet of commercial banks: Monthly — 45 days after the end of the month — BCEAO
- Balance of Payments data: Quarterly — 45 days after the end of the quarter — BCEAO

### Policy and reform commitments relevant to reporting and arrears management
- Strengthen expenditure controls and reintroduce commitment controls via the Technical Committee of Arbitration of Budgetary Expenditure (COTADO).
- Professionalize revenue officers, streamline tax exemptions on imported goods, and maintain control of exemptions through a review committee.
- Implement biometric attendance controls and continue the IMF blockchain initiative to detect ghost employees and reduce payroll expenses.
- Improve debt management and ensure timely debt service payments, prioritizing debt service over other spending.
- Leverage concessional financing and maintain reliance on concessional resources where possible.
- Continue publishing financial reports and beneficial ownership information for crisis-related contracts; finalize national AML/CFT policy and action plan; implement a new asset declaration regime.
- Work with development partners (World Bank, BCEAO) to advance Treasury/banking interfaces, TSA, and externally-financed capital expenditure reporting.

*Source: 1gnbea2023003 - 9.      Reporting requirement. The government will report any new external borrowing and its*

---