## Scaling Up Quality Public Investment for Stronger Growth

## Source details

**Canonical URL:** [Scaling Up Quality Public Investment for Stronger Growth](https://www.imf.org/-/media/files/publications/selected-issues-papers/2025/english/sipea2025149.pdf)

## Other formats

- [Markdown version](/-/media/files/publications/selected-issues-papers/2025/english/sipea2025149.pdf.md)
- [Structured JSON version](/-/media/files/publications/selected-issues-papers/2025/english/sipea2025149.pdf.json)

---

### A. Introduction — context and motivation
- Economic momentum has been strong but faster income convergence is needed; incomes in Bulgaria still lag most peers.
- The IMF projects potential growth between 2 and 3 percent per year for the medium term (IMF, 2024).
- The European Commission projects long-term growth rates between 1 and 1.5 percent (EC, 2023).
- High-quality public investment can raise productivity, boost potential growth, and possibly crowd in private investment.

### B. Public investment needs and efficiency — key findings
- Infrastructure gaps and performance
  - Bulgaria’s quality and availability of infrastructure in many areas lag the EU average.
  - Transport network: inadequately maintained and insufficient to meet business needs.
  - Road and public transportation infrastructure needed to connect remote and less-developed regions.
  - Air ports and seaport infrastructure important for travel and tourism development.
  - Water infrastructure: relatively high population connection but one of the highest loss rates during transport in the EU (based on 2021 data).
- Capital stock and public investment trends
  - Capital stock is low compared to OECD countries, both relative to GDP and population.
  - Public investment has lagged peers during most of the past decade; EU-funded projects drove much investment but absorption slowed during 2022–24.
- Efficiency improvement potential
  - Bulgaria could achieve about 1.8 percent of GDP in savings by improving the efficiency of public investment (Hallaert et al, 2022).
  - PIMA assessment: public investment management performs relatively well regionally but could be improved via better forecasting, multiannual prioritization, strengthened project appraisal and selection, and procurement reforms.
  - Public procurement inefficiencies: World Bank analysis estimates potential savings of 5.3 percent of the total value of public procurement contracts during 2007–22; single-bidder and negotiated outcomes remain prevalent.

### C. Availability and absorption of EU funds — stocks and disbursement performance
- Total grant funds available for Bulgaria for the 2021–27 period: EUR 18.7 billion (about 18 percent of 2024 GDP).
  - Of this, EUR 6.2 billion are funds under the Recovery and Resilience Plan (RRP), which includes EUR 480 million under RePowerEU chapter.
  - Grants amounting to EUR 12.5 billion are available under the Multiannual Financial Framework (MFF) 2021–27 with utilization date of end-2030.
- Disbursement and absorption rates
  - About 16 percent of the total funds disbursed (as of mid-October 2025).
  - RRP: about 22 percent of available funds disbursed as of September 2025.
  - Baseline assumption: about Euro 4.6 billion underutilization of the available EU funds (consistent with the macroframework projections of the 2025 Article IV consultation).
- Factors behind slow absorption
  - Delays due to stalled reforms, frequent snap elections, and reversals of reforms (e.g., electricity market liberalization).
  - Structural deficiencies: prolonged implementation timelines for large infrastructure projects, procurement-related delays, projects starting with only pre-feasibility studies, fragmented project structures, frequent regulatory changes, complex procurement appeals procedures, and administrative capacity bottlenecks.
- Programming-period absorption patterns
  - Implementation under the 2021–27 MFF is slower compared to previous programming periods.

### D. Simulating the impact of scaled up quality public investment — model and scenarios
- Model description
  - Model used: Debt Investment Growth and Natural Resources (DIGNAR) model — a small open economy dynamic general equilibrium model where public capital enters production and public investment is subject to inefficiencies; solved with perfect foresight in Matlab using Dynare.
  - Calibrated to Bulgarian economy using key ratios and parameter values corresponding to 2024 data; parameter values based on literature.
- Two simulation scenarios
  - Full absorption scenario: full absorption of available EU funds under the RRP (including REPowerEU) and the 2021–27 MFF by 2029. Total available EU funds until 2030: EUR 18.7 billion; around 16 percent already disbursed as of mid-October 2025.
  - Efficiency-improvement scenario: gradual increase in the efficiency of public investment, reducing the efficiency gap from 54 percent to 25 percent in 2030 (based on Kapsoli et al, 2023); this efficiency gain is added to the full-absorption scenario.
- Public investment outcomes (percent of GDP)
  - Baseline projected average public capital expenditures in 2026–30: 3.4 percent of GDP.
  - Full absorption scenario average share in 2026–30: 4.3 percent of GDP.
  - Efficiency-adjusted investment:
    - Baseline efficiency-adjusted investment: 1.9 percent of GDP.
    - If all EU funds are absorbed: efficiency-adjusted investment of 2.3 percent of GDP.
    - If efficiency is improved to 75 percent (i.e., efficiency gap reduced to 25 percent) by 2030, efficiency-adjusted public investment will amount to 3.2 percent of GDP on average in 2026–30.

### E. Main simulation results and quantified dynamics
- Full absorption of EU funds (results)
  - GDP would be 1 percent higher in 2030 than in the baseline.
  - This is equivalent to an acceleration of the GDP growth by 0.2 ppt on average in the five-year horizon from 2026 till 2030.
  - Public capital accumulation stimulates growth in private investment in both the tradable and non-tradable sectors.
  - Private consumption is estimated to be 1 percent higher in 2030.
  - The fiscal position remains largely unchanged as higher public investment is financed by increased grants.
  - Over the next five years, the current account remains largely unchanged: public investment boosts imports, but exports also increase.
- Higher-efficiency investment scenario (results)
  - GDP exceeds the baseline by 2.3 percent in 2030.
  - Consumption is 2.3 percent higher in 2030.
  - Private investment surpasses its baseline value by 1.7 percent.
  - The gradual increase in the efficiency of public investment improves growth trajectories.
  - Public debt is marginally lower than in the baseline.
  - The current account remains broadly unchanged.
- Selected indicator deviations from baseline (2026–2030)
  - GDP deviation (percent from the baseline): peak deviations reach 1.0 percent (full absorption) and 2.3 percent (full absorption and higher efficiency) in 2030.
  - Private Investment deviation (percent from the baseline): private investment surpasses baseline by 1.7 percent under the higher-efficiency scenario in 2030.
  - Employment deviation (percent from the baseline): gradual increase through 2026–2030 with small positive deviations (values shown in figure up to 0.5 percent by 2030).
  - Private Consumption deviation (percent from the baseline): private consumption deviates up to 1.0 percent (full absorption) and up to 2.3 percent (full absorption and higher efficiency) by 2030.

### F. Policy implications and recommended reforms
- Overarching policy message
  - Scaling up quality public investment can accelerate income convergence with the EU and reduce disparities within the country.
  - Accelerating the pace of absorption of EU funds and increasing public investment efficiency is critical and should be a top policy priority.
  - Reforms that are pre-requisites for the EU funds disbursement need to be implemented steadfastly.
- Priority reform areas
  - Enhanced investment planning and multiannual prioritization to better inform the budget and improve project readiness.
  - Strengthening project appraisal and selection criteria to increase the quality and returns of public investment.
  - Procurement reforms to reduce noncompetitive practices, increase the number of bidders, and capture potential savings (estimated at 5.3 percent of procurement contract value during 2007–22).
  - Administrative capacity building to reduce delays in evaluating proposals and to simplify procedures and red tape.
- Implementation urgency
  - RRP milestones and targets must be completed by end-August 2026; delays risk underutilizing funds and jeopardizing green and digital transition and human capital strengthening.

### Annex I — Baseline model calibration (selected key ratios and parameter values)
- Key Ratios
  - Government investment to GDP (%) 3.3
  - Government consumption to GDP (%) 12.00
  - Government domestic debt (%) 5.9
  - Government external commercial debt (%) 17.5
  - Concessional debt (%) 0.001
  - Grants to GDP (%) 1.8
  - Government revenue to GDP (%) 33.6
  - Share of labor taxes in total public revenue (%) 31.3
  - Share of consumption taxes in total public revenue (%) 37.8
  - User fees of public infrastructure (in percent of recurrent costs) 68.2
  - GDP real growth (%) 2.8
  - Exports to GDP (%) 55.8
  - Imports to GDP (%) 53.5
  - Private investment to GDP (%) 14.6
  - Private foreign debt to GDP (%) 33.0
  - Domestic real interest rate (%) 0.02
  - Real risk-free rate (%) 0.001
  - Real interest rate on external commercial debt (%) 0.02
  - Share of tradables in consumption (%) 61.6
  - Share of non-resource tradables in consumption of tradable goods (%) 78.9
  - Labor income share in traded sector (%) 43.3
  - Labor income share in non-traded sector (%) 47.9
- Parameter Values
  - Steady-state efficiency of public investment (%) 46.2
  - Private capital depreciation rate (%) 10
  - Public capital depreciation rate (%) 7
  - Elasticity of substitution between labor in tradable and non-tradable sectors 0.5
  - Output elasticity to public capital 0.12
  - Elasticity of substitution between traded and non-traded goods 0.99
  - Elasticity of portfolio adjustment costs 1
  - Inverse of Frisch labor elasticity 5
  - Investment adjustment cost 25
  - Inverse of the intertemporal elasticity of consumption 1.78
  - Home bias for additional government spending 0.6
  - Elasticity of sovereign risk 0
  - Adjustment share by external commercial debt (%) 100

*Source: IMF staffestimates.*

### 2.3 percent in 2030. The findings underscore the

### Scaling Up Quality Public Investment for Stronger Growth

### A. Introduction — context and motivation
- Economic momentum has been strong but faster income convergence is needed; incomes in Bulgaria still lag most peers.
- The IMF projects potential growth between 2 and 3 percent per year for the medium term (IMF, 2024).
- The European Commission projects long-term growth rates between 1 and 1.5 percent (EC, 2023).
- High-quality public investment can raise productivity, boost potential growth, and possibly crowd in private investment.

### B. Public investment needs and efficiency — key findings
- Bulgaria’s quality and availability of infrastructure in many areas lag the EU average.
- Specific infrastructure issues:
  - Transport network: inadequately maintained and insufficient to meet business needs.
  - Road and public transportation infrastructure needed to connect remote and less-developed regions.
  - Air ports and seaport infrastructure important for travel and tourism development.
  - Water infrastructure: relatively high population connection but one of the highest loss rates during transport in the EU (based on 2021 data).
- Capital stock and public investment:
  - Capital stock is low compared to OECD countries, both relative to GDP and population.
  - Public investment has lagged peers during most of the past decade; EU-funded projects drove much investment but absorption slowed during 2022–24.
- Efficiency improvement potential:
  - Bulgaria could achieve about 1.8 percent of GDP in savings by improving the efficiency of public investment (Hallaert et al, 2022).
  - PIMA assessment: public investment management performs relatively well regionally but could be improved via better forecasting, multiannual prioritization, strengthened project appraisal and selection, and procurement reforms.
  - Public procurement inefficiencies: World Bank analysis estimates potential savings of 5.3 percent of the total value of public procurement contracts during 2007–22; single-bidder and negotiated outcomes remain prevalent.

### C. Availability and absorption of EU funds — stocks and disbursement performance
- Total grant funds available for Bulgaria for the 2021–27 period: EUR 18.7 billion (about 18 percent of 2024 GDP).
  - Of this, EUR 6.2 billion are funds under the Recovery and Resilience Plan (RRP), which includes EUR 480 million under RePowerEU chapter.
  - Grants amounting to EUR 12.5 billion are available under the Multiannual Financial Framework (MFF) 2021–27 with utilization date of end-2030.
- Disbursement and absorption rates:
  - About 16 percent of the total funds disbursed (as of mid-October 2025).
  - RRP: about 22 percent of available funds disbursed as of September 2025.
  - Baseline assumption: about Euro 4.6 billion underutilization of the available EU funds (consistent with the macroframework projections of the 2025 Article IV consultation).
- Factors behind slow absorption:
  - Delays due to stalled reforms, frequent snap elections, and reversals of reforms (e.g., electricity market liberalization).
  - Structural deficiencies: prolonged implementation timelines for large infrastructure projects, procurement-related delays, projects starting with only pre-feasibility studies, fragmented project structures, frequent regulatory changes, complex procurement appeals procedures, and administrative capacity bottlenecks.
- Programming-period absorption patterns:
  - Implementation under the 2021–27 MFF is slower compared to previous programming periods.

### D. Simulating the impact of scaled up quality public investment — model and scenarios
- Model used: Debt Investment Growth and Natural Resources (DIGNAR) model — a small open economy dynamic general equilibrium model where public capital enters production and public investment is subject to inefficiencies; solved with perfect foresight in Matlab using Dynare.
- Calibration:
  - Calibrated to Bulgarian economy using key ratios and parameter values corresponding to 2024 data; parameter values based on literature.
- Two simulation scenarios:
  - Full absorption scenario: full absorption of available EU funds under the RRP (including REPowerEU) and the 2021–27 MFF by 2029. Total available EU funds until 2030: EUR 18.7 billion; around 16 percent already disbursed as of mid-October 2025.
  - Efficiency-improvement scenario: gradual increase in the efficiency of public investment, reducing the efficiency gap from 54 percent to 25 percent in 2030 (based on Kapsoli et al, 2023); this efficiency gain is added to the full-absorption scenario.
- Public investment outcomes (percent of GDP):
  - Baseline projected average public capital expenditures in 2026–30: 3.4 percent of GDP.
  - Full absorption scenario average share in 2026–30: 4.3 percent of GDP.
  - Efficiency-adjusted investment:
    - Baseline efficiency-adjusted investment: 1.9 percent of GDP.
    - If all EU funds are absorbed: efficiency-adjusted investment of 2.3 percent of GDP.
    - If efficiency is improved to 75 percent (i.e., efficiency gap reduced to 25 percent) by 2030, efficiency-adjusted public investment will amount to 3.2 percent of GDP on average in 2026–30.

### E. Policy implications and recommended reforms
- Steadfast reforms are essential to accelerate EU fund absorption and improve efficiency to boost growth.
- Priority reform areas emphasized in the analysis:
  - Enhanced investment planning and multiannual prioritization to better inform the budget and improve project readiness.
  - Strengthening project appraisal and selection criteria to increase the quality and returns of public investment.
  - Procurement reforms to reduce noncompetitive practices, increase the number of bidders, and capture potential savings (estimated at 5.3 percent of procurement contract value during 2007–22).
  - Administrative capacity building to reduce delays in evaluating proposals and to simplify procedures and red tape.
- Implementation urgency:
  - RRP milestones and targets must be completed by end-August 2026; delays risk underutilizing funds and jeopardizing green and digital transition and human capital strengthening.

*RECOMMENDED CITATION: Vahram Stepanyan and Iglika Vassileva (2025) “Scaling Up Quality Public Investment for Stronger Growth”, Washington DC: International Monetary Fund, Selected Issues Paper, SIP/2025/149.*

### 19.      Simulations show that GDP would be 1 percent higher in 2030 than in the baseline if

### 19.      Simulations show that GDP would be 1 percent higher in 2030 than in the baseline if 

### Main simulation results: full absorption of EU funds
- GDP would be 1 percent higher in 2030 than in the baseline.
- This is equivalent to an acceleration of the GDP growth by 0.2 ppt on average in the five-year horizon from 2026   till 2030.
- Public capital accumulation stimulates growth in private investment in both the tradable and non-tradable sectors.
- Private consumption is estimated to be 1 percent higher in 2030.
- The fiscal position remains largely unchanged as higher public investment is financed by increased grants.
- Over the next five years, the current account remains largely unchanged: public investment boosts imports, but exports also increase.

### Higher-efficiency investment scenario
- GDP exceeds the baseline by 2.3   percent in 2030.
- Consumption is 2.3 percent higher in 2030.
- Private investment surpasses its baseline value by 1.7 percent.
- The gradual increase in the efficiency of public investment improves growth trajectories.
- Public debt is marginally lower than in the baseline.
- The current account remains broadly unchanged.

### Quantified dynamics shown in simulations (selected indicators, deviations from baseline)
- GDP deviation (percent from the baseline): annual path shown for 2026–2030 with full absorption and with full absorption plus higher efficiency; peak deviations reach 1.0 percent (full absorption) and 2.3   percent (full absorption and higher efficiency) in 2030.
- Private Investment deviation (percent from the baseline): annual path for 2026–2030; private investment surpasses baseline by 1.7 percent under the higher-efficiency scenario in 2030.
- Employment deviation (percent from the baseline): gradual increase through 2026–2030 with small positive deviations (values shown in figure up to 0.5 percent by 2030).
- Private Consumption deviation (percent from the baseline): private consumption deviates up to 1.0 percent (full absorption) and up to 2.3   percent (full absorption and higher efficiency) by 2030.

### Policy implications and recommendations (Concluding Remarks)
- Scaling up quality public investment can accelerate income convergence with the EU and reduce disparities within the country.
- Accelerating the pace of absorption of EU funds and increasing public investment efficiency is critical and should be a top policy priority.
- Reforms that are pre-requisites for the EU funds disbursement need to be implemented steadfastly.
- There is room to improve the effectiveness and efficiency of public investment, including by:
  - better planning and prioritizing multiannual capital expenditures,
  - strengthening project appraisal and selection,
  - improving procurement.
- Increasing the efficiency of public investment boosts growth dividends; staff estimates that full absorption of EU Funds could boost GDP by 1 percent in 2030 compared to the baseline, and paired with efficiency improvements the gain could reach 2.3   percent.

### Annex I — Baseline model calibration (selected key ratios and parameter values)
- Key Ratios
  - Government investment to GDP (%) 3.3
  - Government consumption to GDP (%) 12.00
  - Government domestic debt (%) 5.9
  - Government external commercial debt (%) 17.5
  - Concessional debt (%) 0.001
  - Grants to GDP (%) 1.8
  - Government revenue to GDP (%) 33.6
  - Share of labor taxes in total public revenue (%) 31.3
  - Share of consumption taxes in total public revenue (%) 37.8
  - User fees of public infrastructure (in percent of recurrent costs) 68.2
  - GDP real growth (%) 2.8
  - Exports to GDP (%) 55.8
  - Imports to GDP (%) 53.5
  - Private investment to GDP (%) 14.6
  - Private foreign debt to GDP (%) 33.0
  - Domestic real interest rate (%) 0.02
  - Real risk-free rate (%) 0.001
  - Real interest rate on external commercial debt (%) 0.02
  - Share of tradables in consumption (%) 61.6
  - Share of non-resource tradables in consumption of tradable goods (%) 78.9
  - Labor income share in traded sector (%) 43.3
  - Labor income share in non-traded sector (%) 47.9

- Parameter Values
  - Steady-state efficiency of public investment (%) 46.2
  - Private capital depreciation rate (%) 10
  - Public capital depreciation rate (%) 7
  - Elasticity of substitution between labor in tradable and non-tradable sectors 0.5
  - Output elasticity to public capital 0.12
  - Elasticity of substitution between traded and non-traded goods 0.99
  - Elasticity of portfolio adjustment costs 1
  - Inverse of Frisch labor elasticity 5
  - Investment adjustment cost 25
  - Inverse of the intertemporal elasticity of consumption 1.78
  - Home bias for additional government spending 0.6
  - Elasticity of sovereign risk 0
  - Adjustment share by external commercial debt (%) 100

*Source: IMF staffestimates.*

---


_Source: https://www.imf.org/-/media/files/publications/selected-issues-papers/2025/english/sipea2025149.pdf_
