## 1. Botswana is navigating a period of pronounced fiscal and economic headwinds.

## Source details

**Canonical URL:** [1. Botswana is navigating a period of pronounced fiscal and economic headwinds.](https://www.imf.org/-/media/files/publications/selected-issues-papers/2025/english/sipea2025161.pdf)

## Other formats

- [Markdown version](/-/media/files/publications/selected-issues-papers/2025/english/sipea2025161.pdf.md)
- [Structured JSON version](/-/media/files/publications/selected-issues-papers/2025/english/sipea2025161.pdf.json)

---

### Fiscal pressures and public financial management (PFM) weaknesses
- Diamond sector: traditional wealth-generating engine has come under increasing strain due to external shocks and structural vulnerabilities, resulting in diminished export receipts and lower government revenues.
- Persistent fiscal deficits have progressively eroded Botswana’s fiscal buffers and more recently contributed to a rapid increase in public debt.
- Technical problems with the Integrated Financial Management Information System (IFMIS) have constrained expenditure control, complicated budget execution, and reduced fiscal transparency.
- Public procurement system deficiencies:
  - Fragmented procurement responsibilities between the Accountant General’s Department and the procurement authority, leading to unclear oversight and poor coordination with budgeting and planning functions.
  - Inefficient procedures and limited procurement capacity contribute to delays, cost overruns, and weak value for money.
- Critical need: strengthen institutional arrangements, streamline processes, and build capacity to improve procurement performance and support more efficient public spending.

### Consequences of failing to address PFM shortcomings
- Continued weaknesses in procurement, budget preparation and execution, financial reporting, and institutional coordination will undermine spending efficiency, leading to waste, delays, and poor value for money.
- Heightened fiscal risks from gaps in fiscal controls and reporting, including the buildup of arrears and contingent liabilities.
- Weak investment management will limit the growth and diversification impact of public spending.
- Over time, these deficiencies would erode fiscal credibility, constrain the government’s ability to respond to shocks, jeopardize debt sustainability, and weaken development outcomes.

### Reform objectives and overarching strategy
- Report draws on IMF technical assistance (including TADAT, PIMA, and financial reporting assessments) and sets out sequenced reform recommendations to:
  - Strengthen tax administration.
  - Improve public investment management.
  - Modernize budget preparation.
  - Enhance transparency and control over public finances.
- Overarching objective: rebuild Botswana’s fiscal capacity so public policy can support economic transformation and long-term development.
- Anticipated outcomes of implementing reforms:
  - Broaden the revenue base, reduce leakages, and mobilize resources more equitably and predictably through strengthened tax administration.
  - Improve expenditure efficiency via enhanced budget preparation and execution, containing deficits while safeguarding priority social and infrastructure spending.
  - Increase growth and diversification impact of capital outlays through more rigorous public investment management.
  - Bolster accountability, investor confidence, and anchor expectations about debt sustainability through greater transparency and improved financial reporting.
  - Collectively strengthen fiscal discipline and enhance macroeconomic stability to finance development goals without compromising long-run sustainability.

### Tax Administration Diagnostic Assessment Tool (TADAT) — summary and findings
- TADAT assessment: 2021 Tax Administration Diagnostic Assessment Tool evaluation provided an objective analysis of tax administration effectiveness and established a baseline for reform.
- Strengths identified:
  - Taxpayer registration system contains extensive and detailed information about registered taxpayers, forming a solid base for compliance monitoring.
  - Legal and regulatory framework provides a strong foundation with clearly articulated laws and a well-defined mandate for BURS.
- Significant weaknesses identified:
  - Compliance risk management is underdeveloped; lack of a systematic, risk-based approach to enforcement.
  - Audit selection process remains largely manual, limiting efficiency.
  - Taxpayer services fragmented, supported by limited outreach and education initiatives despite improved call center responsiveness.
  - Lekgetho Live Tax Information System (TAX IS) introduced in 2020 faced flawed data migration, usability concerns, and varied staff acceptance.
  - Integration of customs and domestic tax functions led to inefficiencies, unclear accountability, and chronic understaffing in domestic tax divisions.
- February 2022 post-TADAT mission recommendations:
  - Develop a systematic compliance risk management framework and modernize audit selection practices.
  - Establish a dedicated Taxpayer Services Department and expand outreach initiatives to encourage voluntary compliance.
  - Undertake an external review of the TAX IS platform to resolve usability and data migration challenges.
  - Realign BURS organizational structure to provide clearer separation of functions between customs and domestic tax divisions.

### ICT, taxpayer services, and revenue mobilization recommendations
- TAX IS (introduced in 2020): expected to modernize tax administration but hampered by flawed data migration, inconsistent usability, and varied staff acceptance.
  - Recommendation: conduct an external review of the TAX IS system and implement necessary improvements.
- Taxpayer service and outreach: fragmented across multiple departments; improved call center responsiveness noted but broader engagement and customer service initiatives need expansion.
  - Recommendation: create a unified Taxpayer Services Department to develop a coherent strategy for outreach and voluntary compliance.
- Data analytics: greater use of data analytics recommended to strengthen risk assessment and operational efficiency.

### Roadmap for reform and strategic priorities
- BURS mid-term review of 2019-2024 strategic plan identified priorities: enhancing compliance enforcement, optimizing organizational efficiency, and leveraging digital transformation.
- IMF 2022 mission found reform progress slow due to leadership changes and inadequate execution mechanisms.
- Proposed Transformation Roadmap: focus on short-term actions to improve revenue collection and tax administration effectiveness.
- Strategic reform agenda centers on three actions:
  - Develop a clear compliance improvement plan with measurable outcomes.
  - Enhance use of risk-based tax administration to improve audit effectiveness and enforcement outcomes.
  - Accelerate reforms to modernize BURS’s operational framework and align revenue administration with international good practices.

### Public Investment Management Assessment (PIMA) — scope and 2023 update
- PIMA framework evaluates institutional design and effectiveness of public investment management across three key stages: (i) planning of investment levels, (ii) allocating investments to sectors and projects, (iii) delivering productive and durable public assets.
- 2023 PIMA update for Botswana was conducted in September 2022 and evaluates PIM institutional strengths and weaknesses and provides practical recommendations.

### Trends in public investment and capital stock metrics
- Public investment trends:
  - From 1990 to 2012, public investment averaged 35 percent of total investment.
  - Declined to 25 percent in the past decade.
  - Public investment peaked at 17 percent of GDP in 2009.
- Public capital stock:
  - Reached 106 percent of GDP in 2019.
  - Per capita public capital stock was 50 percent above the EME average and ten times that of SSA (IMF estimates).
- National plans:
  - Under National Development Plan 11 (NDP11), investments focused on roads, power, and water and sanitation; implementation was disrupted by COVID-19.
  - Draft Transitional National Development Plan (TNDP, covering 2023–2025) envisions renewed expansion in public investment, particularly in water and transport infrastructure.

### Key PIMA findings since 2017
- Progress since 2017: improvements in institutional structures, legal frameworks, and strategic orientation for managing public investments, but implementation remains weak.
- Institutional strengths and gaps:
  - MFED plays a central role in public investment planning and budgeting; sector ministries and agencies execute projects.
  - Lack of coordination across entities leads to fragmented project execution.
  - Disconnect between national planning (NDP) and budget allocation due to competing national priorities and slow economic recovery.
  - Slow execution pace for key public investment projects driven by inadequate project management, lack of skilled personnel, and poor ministry/agency coordination.
- Project selection and appraisal challenges:
  - Project selection criteria often unclear; decision-making lacks transparency.
  - Tendency to select projects based on political considerations rather than long-term developmental impact or alignment with national priorities.
  - Appraisal process is often ad hoc with limited use of cost-benefit analysis and investment evaluation tools.
  - National and sectoral planning processes not always aligned with budgeting; projects sometimes initiated without adequate feasibility studies or risk assessments.
- Project implementation and monitoring deficiencies:
  - Development Project Monitoring System (DPMS) exists but is used inconsistently; detailed, timely reporting on project outcomes is lacking.
  - Monitoring data are often underutilized for decision-making or project adjustments.
  - Under-resourced project management capacity at central and sectoral levels contributes to frequent delays and cost overruns.
  - Common outcomes: delays in construction, maintenance backlogs, incomplete projects.
- Asset management and sustainability shortfalls:
  - Insufficient focus on maintenance and sustainability once projects are completed.
  - Many infrastructure projects face significant maintenance challenges, reducing effectiveness over time.
  - Lack of a comprehensive asset management plan and clear strategy for managing public assets.
  - Inadequate resources allocated for maintenance leading to premature deterioration of infrastructure.

### Recommendations for reform (PIMA-related and cross-cutting)
- Improve coordination between national planning and budgeting to ensure alignment of sectoral plans with national development strategy.
- Strengthen project selection and appraisal by formalizing appraisal systems, increasing use of cost-benefit analysis, and ensuring feasibility and risk assessments prior to project initiation.
- Enhance project implementation and monitoring:
  - Improve utilization of DPMS and other monitoring tools for timely reporting and adaptive project management.
  - Build project management capacity and technical skills at central and sectoral levels.
- Develop and implement a comprehensive asset management strategy to ensure maintenance and sustainability of public investments.
- Address procurement and PFM weaknesses noted elsewhere to reduce delays, cost overruns, and improve value for money in public investment projects.

### Key recommendations from the 2023 PIMA update
- Improve project selection, enhance implementation and monitoring of public investments, and ensure long-term sustainability of infrastructure.
- Target reforms across legal and institutional frameworks, project appraisal and selection, monitoring and evaluation (M&E), capacity building, and asset management to maximize developmental impact.

### Strengthening legal and institutional frameworks (paras. 24)
- Refine the Public Finance Management Act (PFMA).
- Ensure sectoral ministries have clear guidelines for planning, selection, and implementation of public investment projects.
- Clearly define roles of various actors in the public investment process to improve coordination across ministries and agencies.
- Improve alignment of national planning and budgeting processes by integrating national and sectoral plans more effectively with the budget process.
- Enhance the capacity of the Ministry of Finance and Economic Development to oversee and coordinate the entire public investment cycle.

### Enhancing project selection and appraisal (para. 25)
- Focus on transparent, evidence-based project selection where a gap to the efficiency frontier stands out (Figure 4).
- Formalize project selection criteria.
- Introduce robust cost-benefit analyses to help prioritize projects based on alignment with national development goals.
- Ensure sector ministries have technical capacity to conduct rigorous appraisals to improve value-for-money outcomes and reduce politically or short-term driven selections.

### Improving monitoring and evaluation systems (para. 26)
- Increase use of the Development Project Monitoring System (DPMS) and ensure monitoring data inform decision-making.
- Enhance training of personnel responsible for monitoring and improve reporting processes for timely and accurate data collection.
- Strengthen ex-post evaluation to assess effectiveness of completed projects and extract lessons learned.
- Foster a culture of accountability and transparency in public investment management to ensure effective utilization of investments.

### Building capacity in public investment management (para. 27)
- Develop a comprehensive capacity-building strategy for civil servants involved in project planning, implementation, and monitoring.
- Provide specialized training in project management, public procurement, and asset management.
- Explore partnerships with international organizations, such as the World Bank, for technical assistance to strengthen public investment management systems.

### Asset management and sustainability (para. 28)
- Develop a comprehensive asset management strategy focused on maintenance and sustainability of infrastructure.
- Allocate sufficient resources for maintenance and repair.
- Conduct regular assessments of infrastructure conditions and develop long-term maintenance plans.

### Overall assessment of PIMA findings (para. 29)
- Progress noted in strengthening institutional frameworks and improving project planning.
- Significant gaps remain in project selection, implementation, and monitoring.
- Recommended multi-faceted approach: legal reforms, better project selection criteria, and building institutional capacity.
- Success depends on government commitment to transparency, accountability, and efficiency to maximize infrastructure investment impact.

### Improving the financial reporting framework — background and objectives (paras. 30–31)
- Objective: improve comprehensiveness, frequency and quality of fiscal reports; strengthen fiscal oversight; align PFM information systems including the chart of accounts with international good practices.
- Review covered Government Accounting and Budgeting System (GABS), digitalization advice, proposed CoA changes, and re-establishing financial reporting.
- GABS has faced persistent operational problems since its 2018 upgrade, culminating in a critical breakdown in August 2023 when the General Ledger stopped updating.
- System instability due to excessive customization, poor configuration, and recurring hardware and database failures.
- Consequences: suspension of in-year and annual financial reporting for the last two fiscal years, disrupted payment processing, delayed supplier settlements and bank reconciliations.
- Heavy reliance on vendors and consultants; governance weaknesses including absence of a service-level agreement between the Accountant General’s Office and the Department of Shared Digital Services.

### Key observations on financial reporting (paras. 32–34)
- Fragmented financial reporting: Ministry of Finance produces annual cash-based statements, while EBFs, SOEs, and local governments maintain independent accounting systems with limited integration.
- Inadequate Chart of Accounts (CoA): does not support economic classification, policy analysis, or inter-entity transactions; lacks standardization across ministries and departments.
- Limited use of accrual concepts: reports emphasize cash flows and insufficiently incorporate accrual-based data (accounts payable, receivable, depreciation). Initial accrual steps exist (some SOEs adopting IPSAS principles) but no whole-of-government strategy.

### Recommendations for reform of financial reporting (paras. 35–38)
- Urgent priority: restore reliable financial reporting for the Budgetary Central Government using available data from GABS, revenue agencies, and the Bank of Botswana.
- Medium- to long-term: sustainable improvements and any move toward accrual accounting depend on a well-functioning, stable IFMIS.
- Redesign CoA to align with GFS 2014 and IPSAS; codify financial relationships between parent ministries and dependent entities (SOEs, EBFs).
- Introduce unique identifiers for government-to-government transactions to improve tracking and eliminate discrepancies.
- Establish a new Financial Reporting Framework (FRF) to standardize reporting across all government entities: clarify roles and obligations, establish a uniform reporting calendar, and require systematic reconciliation between cash-based and accrual-based systems.
- Issue a comprehensive Financial Reporting Manual (FRM) as operational guidance and update the Public Finance Management Act to make compliance mandatory.
- Institutional strengthening and sustained capacity building: create a committee to oversee implementation and monitoring; reinforce internal audit and accounting units; enhance collaboration between the Accountant General’s Department and the Office of the Auditor General; provide training and upskilling in modern accounting practices.

### Implementation strategy and phased roadmap (paras. 39)
- Short-Term Priorities:
  - Restore financial reporting (IFMIS) and finalize the CoA redesign.
  - Develop reporting templates based on IPSAS cash and accrual standards.
  - Initiate a gap analysis of existing IT systems and accounting processes.
- Medium-Term Priorities:
  - Roll out the revised CoA across all budgetary and non-budgetary entities.
  - Adopt and pilot the Financial Reporting Manual (FRM) in key ministries.
  - Begin transition from cash-based to hybrid accrual reporting for selected areas (e.g., payroll, vendor payments).
- Long-Term Goals:
  - Full adoption of accrual-based IPSAS reporting at the general government level.
  - Integration of SOE and EBF financial data into consolidated reports.
  - Regular publication of whole-of-government financial statements.

### Broader fiscal governance considerations (paras. 40–41)
- Stronger reporting enhances fiscal transparency and investor confidence, enables better tracking of public debt and assets, and supports risk-based fiscal planning.
- Consistent classification and monitoring of transfers to SOEs and dependent entities is critical for managing contingent liabilities and safeguarding fiscal sustainability.
- Reform success requires sustained political support, inter-agency coordination, and investment in people and systems.
- Phased, realistic approach recommended to balance ambition with capacity and institutional readiness.

### Ministry of Finance organizational assessment — scope and context (paras. 42–43)
- Review assessed organizational strengths, gaps, and coordination issues across core PFM functions: macro-fiscal forecasting and policy, fiscal risk analysis, budget preparation, financial control and reporting, and reform coordination.
- Triggered by deteriorating fiscal buffers and increasing macro-fiscal risks.
- Findings: MoF lacks a unified structure for macro-fiscal policy management; PRDMU performs select forecasting and strategy functions but is not charged with below-the-line fiscal projections, comprehensive MTFF production, regular fiscal performance reporting, and macroeconomic policy analysis.
- Institutional structure for fiscal risk management is underdeveloped.
- Recommendation: establish a Macro-Fiscal Management Department integrating macro-fiscal policy, tax policy, debt sustainability analysis, and fiscal risk analysis; reconstitute the technical macro working group including relevant agencies; review and expand mandates of Tax Policy and Debt Management Departments.

### Budget preparation findings and recommendations (paras. 44–45)
- Budget coordination in MoF is fragmented; responsibility split across divisions; recurrent and development budgets prepared separately, weakening budget unity.
- Recommend establishing a dedicated budget coordination unit to streamline preparation, facilitate cross-department collaboration, and ensure adherence to the budget calendar.
- Clarify MoF and National Planning Commission roles on PIM and set responsibilities in the budget calendar.
- Budget challenge function undercut by limited capacity: only five desk officers manage challenge responsibilities for all MDAs.
- Recommendation: augment desk officer capacity, training, and analytical capabilities to restore MoF's gatekeeping function.

### Financial control, accounting and reporting findings and recommendations (paras. 46–47)
- Structural and operational weaknesses: outdated PFM legal framework, no consolidated financial statements since FY2021/22, incomplete or unreconciled in-year reports.
- GABS technologically obsolete and poorly maintained; core manuals (accounting policies, SCOA guides) missing; weak internal controls causing financial losses.
- Recommendations:
  - Strengthen the Accountant General’s Department (AGD) responsibilities for design and oversight of financial control, accounting and reporting framework.
  - Transfer procurement policy coordination to the procurement authority.
  - Strengthen the accounting systems management function to better manage and develop GABS and external application providers; expand AGD systems group.
  - Upgrade cash management and financial reporting capacities.
  - Procure a new IFMIS or reinstall GABS; implement an interim reporting solution urgently.
  - Increase Accounting Officers’ engagement with internal audit findings and decentralize financial control responsibilities.

### Cross-cutting functions and reform implementation (para. 48)
- PFM reform implementation has been piecemeal and lacks strategic coherence; responsibilities are not clearly assigned; reform monitoring is weak; coordination unit underpowered.
- Recommendations:
  - Place the reform coordination office under the Permanent Secretary and hold departmental heads accountable for outputs.
  - Integrate finance and accounting functions across MDAs.
  - Consolidate development partner coordination into a single unit to harmonize external engagement.

### Implementation roadmap and priority recommendations (paras. 49; table)
- Report proposes 16 priority recommendations across macro-fiscal, budget management, financial control, and cross-cutting themes with short-, medium-, and long-term timelines.
- Selected prioritized recommendations (preserving exact wording and timeframe/priority labels):
  - MACRO-FISCAL
    1. Establish a stand-alone Macro-Fiscal Management Department, drawing on the existing capabilities of the Transformation Office, and expand role to cover all major macro-fiscal roles. — Short-term — High
    2. Expand the mandate and build-up the capacity of Tax Policy and Debt Management Divisions. — Medium-term — Medium
    3. Staff, train and direct PEEPA to carry out fully the SOE governance and oversight functions — Medium-term — High
    4. Reconstitute the Technical Macro-Fiscal Working Group — Medium-term — Medium
  - BUDGET PREPARATION AND MANAGEMENT
    5. Combine the existing budget coordination functions to guide budget preparation including development of the budget calendar and guidelines, and lead the rollout of budget reforms — Medium-term — High
    6. Strengthen coordination of the recurrent and development budget, including the functions and responsibilities of the MoF and NPC — Short-term — High
    7. Review institutional arrangements for budget decision making with a view to incorporate the early participation of key role players — Medium-term — High
  - FINANCIAL CONTROL, ACCOUNTING AND REPORTING
    8. Strengthen the OAGs design and oversight of financial control, accounting and reporting framework — Short-term — High
    9. Transfer OAG procurement policy coordination responsibilities to PPRA — Short-term — Medium
    10. Strengthen the OAG’s systems function to manage and develop GABS and to manage external application providers — Short-term — High
    11. Expand mandate of the Cash Management Unit for monitoring cash flows and guiding budget releases — Short-term — High
    12. Strengthen arrangements and secure greater engagement of Accounting Officers with the internal audit findings — medium-term — Medium
  - CROSS-CUTTING
    13. Review the arrangements for progress reporting and monitoring of the PFM reform strategy, relocate the coordination function to the Office of the PS — Medium-term — Medium
    14. Review the current PFM reform strategy and elaborate aspirational but credible expectations, priorities, plans, etc. for the achievement of proposed reform outputs — Medium-term — Medium
    15. Implement arrangements to provide for a more integrated finance function in Ministries, Departments, & Agencies (MDAs) — Longer-term — Medium
    16. Review opportunities to consolidate development partner coordination within MoF — Medium-term — Medium

### Strategic conclusion (paras. 50–51)
- MoF must modernize its PFM framework to respond to deteriorating fiscal conditions and rising macroeconomic risks.
- Institutional reform, analytical capacity, and strategic leadership are vital to enhance fiscal governance and sustain long-term economic stability.
- IMF technical assistance recommends: modernizing tax administration, strengthening budget preparation and execution, improving public investment management, and enhancing financial reporting and transparency.
- Implementation depends on strong political commitment, effective sequencing of reforms, and investment in institutional capacity to restore fiscal sustainability, rebuild buffers, and support Botswana’s long-term development goals.

*Source: IMF staff report content summarized from the provided chapter.*

### 1. Botswana is navigating a period of pronounced fiscal and economic headwinds. The country’s

### 1. Botswana is navigating a period of pronounced fiscal and economic headwinds.

### Fiscal pressures and public financial management (PFM) weaknesses
- Diamond sector: traditional wealth-generating engine has come under increasing strain due to external shocks and structural vulnerabilities, resulting in diminished export receipts and lower government revenues.
- Persistent fiscal deficits have progressively eroded Botswana’s fiscal buffers and more recently contributed to a rapid increase in public debt.
- Technical problems with the Integrated Financial Management Information System (IFMIS) have constrained expenditure control, complicated budget execution, and reduced fiscal transparency.
- Public procurement system deficiencies:
  - Fragmented procurement responsibilities between the Accountant General’s Department and the procurement authority, leading to unclear oversight and poor coordination with budgeting and planning functions.
  - Inefficient procedures and limited procurement capacity contribute to delays, cost overruns, and weak value for money.
- Critical need: strengthen institutional arrangements, streamline processes, and build capacity to improve procurement performance and support more efficient public spending.

### Consequences of failing to address PFM shortcomings
- Continued weaknesses in procurement, budget preparation and execution, financial reporting, and institutional coordination will undermine spending efficiency, leading to waste, delays, and poor value for money.
- Heightened fiscal risks from gaps in fiscal controls and reporting, including the buildup of arrears and contingent liabilities.
- Weak investment management will limit the growth and diversification impact of public spending.
- Over time, these deficiencies would erode fiscal credibility, constrain the government’s ability to respond to shocks, jeopardize debt sustainability, and weaken development outcomes.

### Reform objectives and overarching strategy
- Report draws on IMF technical assistance (including TADAT, PIMA, and financial reporting assessments) and sets out sequenced reform recommendations to:
  - Strengthen tax administration.
  - Improve public investment management.
  - Modernize budget preparation.
  - Enhance transparency and control over public finances.
- Overarching objective: rebuild Botswana’s fiscal capacity so public policy can support economic transformation and long-term development.
- Anticipated outcomes of implementing reforms:
  - Broaden the revenue base, reduce leakages, and mobilize resources more equitably and predictably through strengthened tax administration.
  - Improve expenditure efficiency via enhanced budget preparation and execution, containing deficits while safeguarding priority social and infrastructure spending.
  - Increase growth and diversification impact of capital outlays through more rigorous public investment management.
  - Bolster accountability, investor confidence, and anchor expectations about debt sustainability through greater transparency and improved financial reporting.
  - Collectively strengthen fiscal discipline and enhance macroeconomic stability to finance development goals without compromising long-run sustainability.

### Tax Administration Diagnostic Assessment Tool (TADAT) — summary and findings
- TADAT assessment: 2021 Tax Administration Diagnostic Assessment Tool evaluation provided an objective analysis of tax administration effectiveness and established a baseline for reform.
- Strengths identified:
  - Taxpayer registration system contains extensive and detailed information about registered taxpayers, forming a solid base for compliance monitoring.
  - Legal and regulatory framework provides a strong foundation with clearly articulated laws and a well-defined mandate for BURS.
- Significant weaknesses identified:
  - Compliance risk management is underdeveloped; lack of a systematic, risk-based approach to enforcement.
  - Audit selection process remains largely manual, limiting efficiency.
  - Taxpayer services fragmented, supported by limited outreach and education initiatives despite improved call center responsiveness.
  - Lekgetho Live Tax Information System (TAX IS) introduced in 2020 faced flawed data migration, usability concerns, and varied staff acceptance.
  - Integration of customs and domestic tax functions led to inefficiencies, unclear accountability, and chronic understaffing in domestic tax divisions.
- February 2022 post-TADAT mission recommendations:
  - Develop a systematic compliance risk management framework and modernize audit selection practices.
  - Establish a dedicated Taxpayer Services Department and expand outreach initiatives to encourage voluntary compliance.
  - Undertake an external review of the TAX IS platform to resolve usability and data migration challenges.
  - Realign BURS organizational structure to provide clearer separation of functions between customs and domestic tax divisions.

### ICT, taxpayer services, and revenue mobilization recommendations
- TAX IS (introduced in 2020): expected to modernize tax administration but hampered by flawed data migration, inconsistent usability, and varied staff acceptance.
  - Recommendation: conduct an external review of the TAX IS system and implement necessary improvements.
- Taxpayer service and outreach: fragmented across multiple departments; improved call center responsiveness noted but broader engagement and customer service initiatives need expansion.
  - Recommendation: create a unified Taxpayer Services Department to develop a coherent strategy for outreach and voluntary compliance.
- Data analytics: greater use of data analytics recommended to strengthen risk assessment and operational efficiency.

### Roadmap for reform and strategic priorities
- BURS mid-term review of 2019-2024 strategic plan identified priorities: enhancing compliance enforcement, optimizing organizational efficiency, and leveraging digital transformation.
- IMF 2022 mission found reform progress slow due to leadership changes and inadequate execution mechanisms.
- Proposed Transformation Roadmap: focus on short-term actions to improve revenue collection and tax administration effectiveness.
- Strategic reform agenda centers on three actions:
  - Develop a clear compliance improvement plan with measurable outcomes.
  - Enhance use of risk-based tax administration to improve audit effectiveness and enforcement outcomes.
  - Accelerate reforms to modernize BURS’s operational framework and align revenue administration with international good practices.

### Public Investment Management Assessment (PIMA) — scope and 2023 update
- PIMA framework evaluates institutional design and effectiveness of public investment management across three key stages: (i) planning of investment levels, (ii) allocating investments to sectors and projects, (iii) delivering productive and durable public assets.
- 2023 PIMA update for Botswana was conducted in September 2022 and evaluates PIM institutional strengths and weaknesses and provides practical recommendations.

### Trends in public investment and capital stock metrics
- Public investment trends:
  - From 1990 to 2012, public investment averaged 35 percent of total investment.
  - Declined to 25 percent in the past decade.
  - Public investment peaked at 17 percent of GDP in 2009.
- Public capital stock:
  - Reached 106 percent of GDP in 2019.
  - Per capita public capital stock was 50 percent above the EME average and ten times that of SSA (IMF estimates).
- National plans:
  - Under National Development Plan 11 (NDP11), investments focused on roads, power, and water and sanitation; implementation was disrupted by COVID-19.
  - Draft Transitional National Development Plan (TNDP, covering 2023–2025) envisions renewed expansion in public investment, particularly in water and transport infrastructure.

### Key PIMA findings since 2017
- Progress since 2017: improvements in institutional structures, legal frameworks, and strategic orientation for managing public investments, but implementation remains weak.
- Institutional strengths and gaps:
  - MFED plays a central role in public investment planning and budgeting; sector ministries and agencies execute projects.
  - Lack of coordination across entities leads to fragmented project execution.
  - Disconnect between national planning (NDP) and budget allocation due to competing national priorities and slow economic recovery.
  - Slow execution pace for key public investment projects driven by inadequate project management, lack of skilled personnel, and poor ministry/agency coordination.
- Project selection and appraisal challenges:
  - Project selection criteria often unclear; decision-making lacks transparency.
  - Tendency to select projects based on political considerations rather than long-term developmental impact or alignment with national priorities.
  - Appraisal process is often ad hoc with limited use of cost-benefit analysis and investment evaluation tools.
  - National and sectoral planning processes not always aligned with budgeting; projects sometimes initiated without adequate feasibility studies or risk assessments.
- Project implementation and monitoring deficiencies:
  - Development Project Monitoring System (DPMS) exists but is used inconsistently; detailed, timely reporting on project outcomes is lacking.
  - Monitoring data are often underutilized for decision-making or project adjustments.
  - Under-resourced project management capacity at central and sectoral levels contributes to frequent delays and cost overruns.
  - Common outcomes: delays in construction, maintenance backlogs, incomplete projects.
- Asset management and sustainability shortfalls:
  - Insufficient focus on maintenance and sustainability once projects are completed.
  - Many infrastructure projects face significant maintenance challenges, reducing effectiveness over time.
  - Lack of a comprehensive asset management plan and clear strategy for managing public assets.
  - Inadequate resources allocated for maintenance leading to premature deterioration of infrastructure.

### Recommendations for reform (PIMA-related and cross-cutting)
- Improve coordination between national planning and budgeting to ensure alignment of sectoral plans with national development strategy.
- Strengthen project selection and appraisal by formalizing appraisal systems, increasing use of cost-benefit analysis, and ensuring feasibility and risk assessments prior to project initiation.
- Enhance project implementation and monitoring:
  - Improve utilization of DPMS and other monitoring tools for timely reporting and adaptive project management.
  - Build project management capacity and technical skills at central and sectoral levels.
- Develop and implement a comprehensive asset management strategy to ensure maintenance and sustainability of public investments.
- Address procurement and PFM weaknesses noted elsewhere to reduce delays, cost overruns, and improve value for money in public investment projects.

*Source: IMF staff report content summarized from the provided chapter.*

### 23. The 2023 PIMA update provides a comprehensive set of recommendations to address the

### 23. The 2023 PIMA update provides a comprehensive set of recommendations to address the

### Key recommendations from the 2023 PIMA update
- Improve project selection, enhance implementation and monitoring of public investments, and ensure long-term sustainability of infrastructure.
- Target reforms across legal and institutional frameworks, project appraisal and selection, monitoring and evaluation (M&E), capacity building, and asset management to maximize developmental impact.

### Strengthening legal and institutional frameworks (paras. 24)
- Refine the Public Finance Management Act (PFMA).
- Ensure sectoral ministries have clear guidelines for planning, selection, and implementation of public investment projects.
- Clearly define roles of various actors in the public investment process to improve coordination across ministries and agencies.
- Improve alignment of national planning and budgeting processes by integrating national and sectoral plans more effectively with the budget process.
- Enhance the capacity of the Ministry of Finance and Economic Development to oversee and coordinate the entire public investment cycle.

### Enhancing project selection and appraisal (para. 25)
- Focus on transparent, evidence-based project selection where a gap to the efficiency frontier stands out (Figure 4).
- Formalize project selection criteria.
- Introduce robust cost-benefit analyses to help prioritize projects based on alignment with national development goals.
- Ensure sector ministries have technical capacity to conduct rigorous appraisals to improve value-for-money outcomes and reduce politically or short-term driven selections.

### Improving monitoring and evaluation systems (para. 26)
- Increase use of the Development Project Monitoring System (DPMS) and ensure monitoring data inform decision-making.
- Enhance training of personnel responsible for monitoring and improve reporting processes for timely and accurate data collection.
- Strengthen ex-post evaluation to assess effectiveness of completed projects and extract lessons learned.
- Foster a culture of accountability and transparency in public investment management to ensure effective utilization of investments.

### Building capacity in public investment management (para. 27)
- Develop a comprehensive capacity-building strategy for civil servants involved in project planning, implementation, and monitoring.
- Provide specialized training in project management, public procurement, and asset management.
- Explore partnerships with international organizations, such as the World Bank, for technical assistance to strengthen public investment management systems.

### Asset management and sustainability (para. 28)
- Develop a comprehensive asset management strategy focused on maintenance and sustainability of infrastructure.
- Allocate sufficient resources for maintenance and repair.
- Conduct regular assessments of infrastructure conditions and develop long-term maintenance plans.

### Overall assessment of PIMA findings (para. 29)
- Progress noted in strengthening institutional frameworks and improving project planning.
- Significant gaps remain in project selection, implementation, and monitoring.
- Recommended multi-faceted approach: legal reforms, better project selection criteria, and building institutional capacity.
- Success depends on government commitment to transparency, accountability, and efficiency to maximize infrastructure investment impact.

### Improving the financial reporting framework — background and objectives (paras. 30–31)
- Objective: improve comprehensiveness, frequency and quality of fiscal reports; strengthen fiscal oversight; align PFM information systems including the chart of accounts with international good practices.
- Review covered Government Accounting and Budgeting System (GABS), digitalization advice, proposed CoA changes, and re-establishing financial reporting.
- GABS has faced persistent operational problems since its 2018 upgrade, culminating in a critical breakdown in August 2023 when the General Ledger stopped updating.
- System instability due to excessive customization, poor configuration, and recurring hardware and database failures.
- Consequences: suspension of in-year and annual financial reporting for the last two fiscal years, disrupted payment processing, delayed supplier settlements and bank reconciliations.
- Heavy reliance on vendors and consultants; governance weaknesses including absence of a service-level agreement between the Accountant General’s Office and the Department of Shared Digital Services.

### Key observations on financial reporting (paras. 32–34)
- Fragmented financial reporting: Ministry of Finance produces annual cash-based statements, while EBFs, SOEs, and local governments maintain independent accounting systems with limited integration.
- Inadequate Chart of Accounts (CoA): does not support economic classification, policy analysis, or inter-entity transactions; lacks standardization across ministries and departments.
- Limited use of accrual concepts: reports emphasize cash flows and insufficiently incorporate accrual-based data (accounts payable, receivable, depreciation). Initial accrual steps exist (some SOEs adopting IPSAS principles) but no whole-of-government strategy.

### Recommendations for reform of financial reporting (paras. 35–38)
- Urgent priority: restore reliable financial reporting for the Budgetary Central Government using available data from GABS, revenue agencies, and the Bank of Botswana.
- Medium- to long-term: sustainable improvements and any move toward accrual accounting depend on a well-functioning, stable IFMIS.
- Redesign CoA to align with GFS 2014 and IPSAS; codify financial relationships between parent ministries and dependent entities (SOEs, EBFs).
- Introduce unique identifiers for government-to-government transactions to improve tracking and eliminate discrepancies.
- Establish a new Financial Reporting Framework (FRF) to standardize reporting across all government entities: clarify roles and obligations, establish a uniform reporting calendar, and require systematic reconciliation between cash-based and accrual-based systems.
- Issue a comprehensive Financial Reporting Manual (FRM) as operational guidance and update the Public Finance Management Act to make compliance mandatory.
- Institutional strengthening and sustained capacity building: create a committee to oversee implementation and monitoring; reinforce internal audit and accounting units; enhance collaboration between the Accountant General’s Department and the Office of the Auditor General; provide training and upskilling in modern accounting practices.

### Implementation strategy and phased roadmap (paras. 39)
- Short-Term Priorities:
  - Restore financial reporting (IFMIS) and finalize the CoA redesign.
  - Develop reporting templates based on IPSAS cash and accrual standards.
  - Initiate a gap analysis of existing IT systems and accounting processes.
- Medium-Term Priorities:
  - Roll out the revised CoA across all budgetary and non-budgetary entities.
  - Adopt and pilot the Financial Reporting Manual (FRM) in key ministries.
  - Begin transition from cash-based to hybrid accrual reporting for selected areas (e.g., payroll, vendor payments).
- Long-Term Goals:
  - Full adoption of accrual-based IPSAS reporting at the general government level.
  - Integration of SOE and EBF financial data into consolidated reports.
  - Regular publication of whole-of-government financial statements.

### Broader fiscal governance considerations (paras. 40–41)
- Stronger reporting enhances fiscal transparency and investor confidence, enables better tracking of public debt and assets, and supports risk-based fiscal planning.
- Consistent classification and monitoring of transfers to SOEs and dependent entities is critical for managing contingent liabilities and safeguarding fiscal sustainability.
- Reform success requires sustained political support, inter-agency coordination, and investment in people and systems.
- Phased, realistic approach recommended to balance ambition with capacity and institutional readiness.

### Ministry of Finance organizational assessment — scope and context (paras. 42–43)
- Review assessed organizational strengths, gaps, and coordination issues across core PFM functions: macro-fiscal forecasting and policy, fiscal risk analysis, budget preparation, financial control and reporting, and reform coordination.
- Triggered by deteriorating fiscal buffers and increasing macro-fiscal risks.
- Findings: MoF lacks a unified structure for macro-fiscal policy management; PRDMU performs select forecasting and strategy functions but is not charged with below-the-line fiscal projections, comprehensive MTFF production, regular fiscal performance reporting, and macroeconomic policy analysis.
- Institutional structure for fiscal risk management is underdeveloped.
- Recommendation: establish a Macro-Fiscal Management Department integrating macro-fiscal policy, tax policy, debt sustainability analysis, and fiscal risk analysis; reconstitute the technical macro working group including relevant agencies; review and expand mandates of Tax Policy and Debt Management Departments.

### Budget preparation findings and recommendations (paras. 44–45)
- Budget coordination in MoF is fragmented; responsibility split across divisions; recurrent and development budgets prepared separately, weakening budget unity.
- Recommend establishing a dedicated budget coordination unit to streamline preparation, facilitate cross-department collaboration, and ensure adherence to the budget calendar.
- Clarify MoF and National Planning Commission roles on PIM and set responsibilities in the budget calendar.
- Budget challenge function undercut by limited capacity: only five desk officers manage challenge responsibilities for all MDAs.
- Recommendation: augment desk officer capacity, training, and analytical capabilities to restore MoF's gatekeeping function.

### Financial control, accounting and reporting findings and recommendations (paras. 46–47)
- Structural and operational weaknesses: outdated PFM legal framework, no consolidated financial statements since FY2021/22, incomplete or unreconciled in-year reports.
- GABS technologically obsolete and poorly maintained; core manuals (accounting policies, SCOA guides) missing; weak internal controls causing financial losses.
- Recommendations:
  - Strengthen the Accountant General’s Department (AGD) responsibilities for design and oversight of financial control, accounting and reporting framework.
  - Transfer procurement policy coordination to the procurement authority.
  - Strengthen the accounting systems management function to better manage and develop GABS and external application providers; expand AGD systems group.
  - Upgrade cash management and financial reporting capacities.
  - Procure a new IFMIS or reinstall GABS; implement an interim reporting solution urgently.
  - Increase Accounting Officers’ engagement with internal audit findings and decentralize financial control responsibilities.

### Cross-cutting functions and reform implementation (para. 48)
- PFM reform implementation has been piecemeal and lacks strategic coherence; responsibilities are not clearly assigned; reform monitoring is weak; coordination unit underpowered.
- Recommendations:
  - Place the reform coordination office under the Permanent Secretary and hold departmental heads accountable for outputs.
  - Integrate finance and accounting functions across MDAs.
  - Consolidate development partner coordination into a single unit to harmonize external engagement.

### Implementation roadmap and priority recommendations (paras. 49; table)
- Report proposes 16 priority recommendations across macro-fiscal, budget management, financial control, and cross-cutting themes with short-, medium-, and long-term timelines.
- Selected prioritized recommendations (preserving exact wording and timeframe/priority labels):
  - MACRO-FISCAL
    1. Establish a stand-alone Macro-Fiscal Management Department, drawing on the existing capabilities of the Transformation Office, and expand role to cover all major macro-fiscal roles. — Short-term — High
    2. Expand the mandate and build-up the capacity of Tax Policy and Debt Management Divisions. — Medium-term — Medium
    3. Staff, train and direct PEEPA to carry out fully the SOE governance and oversight functions — Medium-term — High
    4. Reconstitute the Technical Macro-Fiscal Working Group — Medium-term — Medium
  - BUDGET PREPARATION AND MANAGEMENT
    5. Combine the existing budget coordination functions to guide budget preparation including development of the budget calendar and guidelines, and lead the rollout of budget reforms — Medium-term — High
    6. Strengthen coordination of the recurrent and development budget, including the functions and responsibilities of the MoF and NPC — Short-term — High
    7. Review institutional arrangements for budget decision making with a view to incorporate the early participation of key role players — Medium-term — High
  - FINANCIAL CONTROL, ACCOUNTING AND REPORTING
    8. Strengthen the OAGs design and oversight of financial control, accounting and reporting framework — Short-term — High
    9. Transfer OAG procurement policy coordination responsibilities to PPRA — Short-term — Medium
    10. Strengthen the OAG’s systems function to manage and develop GABS and to manage external application providers — Short-term — High
    11. Expand mandate of the Cash Management Unit for monitoring cash flows and guiding budget releases — Short-term — High
    12. Strengthen arrangements and secure greater engagement of Accounting Officers with the internal audit findings — medium-term — Medium
  - CROSS-CUTTING
    13. Review the arrangements for progress reporting and monitoring of the PFM reform strategy, relocate the coordination function to the Office of the PS — Medium-term — Medium
    14. Review the current PFM reform strategy and elaborate aspirational but credible expectations, priorities, plans, etc. for the achievement of proposed reform outputs — Medium-term — Medium
    15. Implement arrangements to provide for a more integrated finance function in Ministries, Departments, & Agencies (MDAs) — Longer-term — Medium
    16. Review opportunities to consolidate development partner coordination within MoF — Medium-term — Medium

### Strategic conclusion (paras. 50–51)
- MoF must modernize its PFM framework to respond to deteriorating fiscal conditions and rising macroeconomic risks.
- Institutional reform, analytical capacity, and strategic leadership are vital to enhance fiscal governance and sustain long-term economic stability.
- IMF technical assistance recommends: modernizing tax administration, strengthening budget preparation and execution, improving public investment management, and enhancing financial reporting and transparency.
- Implementation depends on strong political commitment, effective sequencing of reforms, and investment in institutional capacity to restore fiscal sustainability, rebuild buffers, and support Botswana’s long-term development goals.

*Source: Excerpt of the IMF technical assistance and assessment sections as presented in the provided content unit.*

---


_Source: https://www.imf.org/-/media/files/publications/selected-issues-papers/2025/english/sipea2025161.pdf_
