## _091509

## Source details

**Canonical URL:** [_091509](https://www.imf.org/-/media/websites/imf/imported-full-text-pdf/external/np/pp/eng/2009/_091509.pdf)

## Other formats

- [Markdown version](/-/media/websites/imf/imported-full-text-pdf/external/np/pp/eng/2009/_091509.pdf.md)
- [Structured JSON version](/-/media/websites/imf/imported-full-text-pdf/external/np/pp/eng/2009/_091509.pdf.json)

---

### Executive summary — Overview and progress
- The report updates implementation, impact, and costs of the Enhanced Heavily Indebted Poor Country (HIPC) Initiative and the Multilateral Debt Relief Initiative (MDRI).
- Debt relief under the Initiatives has substantially alleviated debt burdens in recipient countries.
- Since September 2008:
  - Two countries reached the decision-point and qualified for HIPC Initiative assistance.
  - Three countries reached the completion-point and qualified for irrevocable debt relief from the HIPC Initiative and the MDRI.
- Aggregate implementation status:
  - 35 (out of 40) HIPCs have qualified for HIPC Initiative assistance.
  - 26 have reached the completion-point.
  - Assistance committed to the 35 post-decision-point HIPCs represents on average about 40 7 percent of these countries’ 2008 GDP.
  - After full delivery of debt relief, debt burden expected to be reduced by about 80 percent compared to pre-decision-point levels.
- Specific milestones (past year):
  - Reached Completion-point: Burundi (January 2009); Central African Republic (June 2009); Haiti (June 2009).
  - Reached Decision-point: Togo (November 2008); Côte d’Ivoire (March 2009).

### Use of flexibility in the framework and additional facilitation
- IDA and the IMF used available flexibility to allow early debt relief tailored to country situations.
- Pre-decision-point arrears clearance operations:
  - Togo: IDA provided an exceptional allocation of US$146 million (grant terms) for arrears clearance to IDA; AfDB provided US$24 million, 99 percent on grant terms, from its Fragile States Facility to finance arrears clearance to AfDB.
  - Côte d’Ivoire: grant-financing mechanism applied to half of the arrears to IDA (US$271 million) and to other creditors (text continues in source).
- Establishment of reform track records aided decision-point progress (example: Côte d’Ivoire with EPCA purchases).
- Judgment used for completion-point triggers when partial implementation met underlying objectives (examples: Burundi and Haiti).
- Togo reached decision point based on an Interim-Poverty Reduction Strategy Paper (I-PRSP), avoiding delays from requiring a full PRSP in a low-capacity context.

### Overall impact and key statistics
- Debt relief committed under the Initiatives amounts to around US$124 billion in nominal terms; about US$52 billion under the MDRI (including projected assistance under the MDRI to interim HIPCs).
- Sequential end-2008 NPV debt stock reductions (in billions of U.S. dollars, end-2008 NPV terms):
  - Before traditional debt relief: 89.2
  - After traditional debt relief: 75.6
  - After HIPC Initiative debt relief: 36.8
  - After additional bilateral debt relief: 31.5
  - After MDRI: 7.1
- Costs of the HIPC Initiative (end-2008 NPV terms):
  - Total cost to creditors: US$74 billion.
  - More than half (US$39 billion) represents irrevocable debt relief to the 26 post-completion-point countries.
  - Cost for the 9 interim countries: US$19 billion (an increase of around 9 percent from last year), largely due to Côte d’Ivoire (estimated cost of US$3 billion).
  - Cost to the remaining five pre-decision-point HIPCs: US$17 billion, most accounted for by Sudan and Somalia.
  - Topping-up assistance (provided so far to six HIPCs) represents less than 3 percent of the total HIPC Initiative cost.
- MDRI costs (end-2008 NPV terms):
  - Total cost to the four participating creditors: US$29 billion.
  - About 85 percent has already been delivered to the 26 post-completion-point countries and two non-HIPCs (Cambodia and Tajikistan) by the IMF.
  - Two thirds of total estimated MDRI cost borne by IDA.
  - MDRI shares by creditor (Figure 3, end-2008 NPV terms):
    - IDA: 18.2 bln. (64%)
    - IMF*: 4.2 bln. (15%)  [Note: * Excludes non-HIPCs]
    - AfDF: 3.8 bln. (13%)
    - IaDB: 2.4 bln. (8%)

### Debt service, poverty-reducing expenditure, and fiscal outcomes
- For the 35 post-decision-point HIPCs, poverty-reducing expenditure between 2001 and 2008 increased by 2 percentage points of GDP, on average.
- Debt service obligations declined by the same order of magnitude over this period.
- Aggregate debt-service series (selected years, In millions of U.S. dollars):
  - 2001: 3,200
  - 2002: 3,279
  - 2003: 3,677
  - 2004: 4,052
  - 2005: 3,968
  - 2006: 3,843
  - 2007: 2,880
  - 2008: 3,141
  - 2009: 2,878
  - 2010: 2,528
  - 2011: 2,817
  - 2012: 3,699
  - 2013: 3,975
- Poverty-Reducing Expenditures (In millions of U.S. dollars):
  - 2001: 6,494
  - 2002: 7,590
  - 2003: 8,811
  - 2004: 10,818
  - 2005: 15,248
  - 2006: 18,227
  - 2007: 21,824
  - 2008: 26,697
  - 2009 (Prel.): 28,836
  - 2010 (Projections): 30,187
  - 2011: 32,510
  - 2012: 34,134
  - 2013: 36,285
- Average ratios (in percent) (selected):
  - Debt Service/Exports: 12.7 (2001), 11.4 (2002), 10.2 (2003), 11.0 (2004), 9.3 (2005), 7.8 (2006), 4.7 (2007), 4.1 (2008), 3.9 (2009), 4.2 (2013).
  - Debt Service/GDP: 3.2 (2001), 2.7 (2002), 2.5 (2003), 2.6 (2004), 2.3 (2005), 2.0 (2006), 1.3 (2007), 1.1 (2008), 1.0 (2009), 1.1 (2013).
  - Poverty-Reducing Expenditure/Government Revenue: 42.1 (2001) to 58.5 (2013).
  - Poverty-Reducing Expenditure/GDP: 6.3 (2001) to 10.4 (2013).
- Projected debt service savings from MDRI (selected years, In millions of U.S. dollars):
  - 2010: 1,207
  - 2011: 1,511
  - 2012: 1,581
  - 2013: 1,418
  - 2014: 1,394

### Debt sustainability, risks, and crisis impact analysis
- Staff analysis does not indicate a risk of a major debt crisis in HIPCs, but the global crisis has exacerbated debt sustainability concerns for a number of countries.
- Aggregate macro revisions (comparison of recent DSAs and August WEO with older DSAs, average):
  - nominal GDP revised downward by about 7 percent
  - exports revised downward by about 9 percent
  - government revenue revised downward by 12 percent
- Country-level vulnerability findings:
  - High-risk country highlighted: Afghanistan (interim HIPC) likely to experience a large increase in debt burden indicators.
  - Moderate-risk post-completion HIPCs identified as possibly facing increased vulnerabilities: Ethiopia, Malawi, Mauritania, Nicaragua, and Sierra Leone (for Ethiopia, Mauritania and Nicaragua breaches are temporary and/or limited).
  - Low-risk country flagged: Mali could face increased debt vulnerabilities but not appear to have serious debt-related problems.
- Implications by HIPC stage:
  - Pre-decision-point countries: HIPC debt relief can be tailored.
  - Interim countries: decision-point relief may be topped-up if deterioration results from shocks beyond control.
  - Post-completion-point countries: topping-up and other mechanisms are no longer available; greater concern about sustained vulnerabilities.
- Policy implications and recommendations:
  - Close monitoring of debt developments in high-risk post-completion countries.
  - Adoption of prudent fiscal and borrowing policies by higher-risk countries.
  - Donors and official creditors to provide highly concessional resources to maintain debt sustainability; concerns raised about availability given tighter fiscal positions in donors.
  - Continued efforts to improve debt management capacity (external and domestic).

### Creditor participation, delivery, and legal environment
- Creditor shares and delivery:
  - Multilateral creditors account for 45 percent of total HIPC Initiative cost: IDA 20 percent; IMF 9 percent; AfDB Group 7 percent.
  - Paris Club creditors: 36 percent of total cost.
  - Multilateral creditor share higher for post-completion-point countries (55 percent) than for interim (36 percent) or pre-decision-point (32 percent) countries.
  - Paris Club creditors estimated to deliver a larger share of relief to interim countries: 47 percent.
  - Non-Paris Club and commercial creditors’ share highest in pre-decision-point countries: 34 percent.
- Small multilateral creditors:
  - Another 20 multilateral creditors account for 14 percent of total HIPC assistance costs and have committed to deliver debt relief at completion point.
  - Eight multilateral creditors, representing less than 0.5 percent of estimated HIPC costs, have not indicated intention to provide relief (listed in source).
- Non-Paris Club official bilateral creditors:
  - Represent about 13 percent of the total cost; delivery remains low, around 35–40 percent.
  - Examples of actions: Algeria cancelled claims on Central African Republic and provided full share to Nicaragua; China delivered relief to Burundi and Central African Republic in 2007; Oman provided full relief to Senegal; Portugal provided full relief to São Tomé and Príncipe.
- Commercial creditors:
  - Account for 6 percent of total cost to 35 post-decision-point HIPCs.
  - Commercial creditors’ share increased due to Côte d’Ivoire exposure (over 30 percent of total HIPC debt relief to Côte d’Ivoire).
  - DRF-supported operations and buybacks: Liberia’s operation extinguished US$1.2 billion of commercial debt at a deep discount (97 percent of face value).
  - Litigation trends: outstanding litigation cases against HIPCs reduced from 33 to 14 over the past year; new lawsuits initiated against DRC, Sierra Leone, Sudan and Zambia.
  - African Legal Support Facility launched June 29, 2009 to support HIPCs facing litigation.
- Legal and legislative measures in donor countries to curtail litigation scope:
  - United Kingdom consulting on legislation to limit proportion of debts reclaimable under U.K. law.
  - U.S. Congress considering H.R. 2932 ("Stop VULTURE Funds" Bill) introduced in June 2009.
  - Belgium introduced similar-intent law in May 2008.

### Financing of HIPC Initiative and MDRI
- World Bank (DRTF and IDA):
  - DRTF and IDA sufficiently resourced to cover debt relief costs under HIPC Initiative over IDA15 commitment period (FY09-11).
  - Donor pledges and contributions to mid-July 2009: donors pledged close to US$4 billion to the DRTF and contributed more than US$3.8 billion in cash and promissory notes.
  - DRTF disbursed more than US$2.8 billion to regional and sub-regional creditors to support their provision of debt relief to eligible HIPCs.
  - IDA15 resources include donor contributions: SDR 1.1 billion for HIPC relief and SDR 4.1 billion for debt forgiveness under the MDRI; donors also committed SDR 0.9 billion to finance full cost of arrears clearance to IDA and IBRD through the DRTF.
  - To date, DRTF received and reimbursed approximately US$2.9 billion to IDA out of allocations from IBRD net income and donor-specific contributions.
- IMF:
  - Available resources estimated sufficient to cover projected cost of debt relief to all remaining HIPCs, except protracted arrears cases of Somalia and Sudan.
  - No provision for debt relief to Somalia and Sudan under original HIPC/MDRI financing framework; additional resources needed when these countries are ready.
  - Additional resources also needed to finance debt relief to any new countries eligible for HIPC/MDRI.

### Remaining challenges, country prospects, and obstacles
- Three important challenges remain: taking remaining countries through HIPC process; ensuring full participation of all creditors (including smaller multilaterals, non-Paris Club bilaterals, private creditors); ensuring financing of HIPC Initiative and MDRI (including protracted arrears cases and possible future eligibles).
- Country-specific prospects (next 12–18 months):
  - Interim countries at advanced stage: Afghanistan, Liberia, Republic of Congo—PRGF-supported programs on track; PRSPs implemented for at least one year; progress on completion-point triggers.
  - Interim countries at less advanced stage: Togo and Côte d’Ivoire—earlier stages of implementing completion-point triggers but progress with PRGF-supported programs on track.
  - Pre-decision-point example: Comoros—PRGF-supported program request expected to be considered by Fund Executive Board by end-September (year in source); successful implementation could lead to decision point in first half of 2010.
  - Improved prospects: Guinea-Bissau (EPCA purchases could pave way for PRGF; PRSP annual progress report expected by end-2009); Democratic Republic of Congo (advanced in PRGF discussions pending nonconcessional borrowing resolution); Chad (SMP April-October 2009 agreed—may lead to PRGF if implemented).
- Main political and security obstacles (selection):
  - Guinea: military coup in December 2008 led to suspension of PRGF review discussions and HIPC completion-point finalization; suspension of several key financial assistance programs.
  - Somalia and Sudan: protracted arrears to multilateral institutions; as of end-December 2008:
    - Somalia’s arrears to IDA and the IMF: US$192 million and US$373 million.
    - Sudan’s arrears to IDA and the IMF: US$508 million and US$1,532 million.
  - Eritrea: may consider HIPC assistance once security situation improves.
  - Kyrgyz Republic: no intention to avail itself of HIPC assistance; indebtedness ratio below HIPC thresholds.

### Monitoring, technical assistance, and capacity building
- Debt Management Facility (DMF) and technical assistance:
  - As of end-July 2009, DeMPAs were carried out in 33 countries, including 21 HIPCs.
  - MTDS toolkit technical assistance provided to six countries since last report.
- Debt Sustainability Framework (DSF) promotion and outreach:
  - Three workshops organized for country authorities from low-income countries, including HIPCs.
  - Since 2006, outreach enhanced coordination among creditors and promoted DSF understanding among debtors.
  - IDA’s non-concessional borrowing policy (NCBP): emphasizes sound debt management, improved debt reporting, possible reduction in IDA financing volume, and adjustment to IDA lending terms where warranted.
  - To end-July 2009, eight countries assessed under IDA’s NCBP; three exceptions (Mali, Rwanda and Senegal), two cases of hardening of terms (Angola and Ghana), and two preliminary exceptions (Mauritania and DRC).

### Annex highlights — country coverage and costing assumptions
- Country coverage for costing analysis:
  - Post-decision-point countries (35) listed explicitly in source.
  - Pre-decision-point countries for costing: Comoros, Eritrea, Somalia, and Sudan.
  - Kyrgyz Republic excluded from cost estimates (indebtedness ratio below HIPC threshold).
- Data timing: data updated through end-July 2009.
- Discounting and exchange rate assumptions:
  - Discount rate used for end-2008 NPV conversions: 5.0 percent.
  - Exchange rates for MDRI calculations: specific rates for IDA/AfDF (1.477380 and 1.524480 US dollars per SDR depending on period), IMF (rate of date debt relief delivered or end-December 2008), IaDB (currency units in US dollars at end-2006).
- Key aggregate totals (selected):
  - Total Debt Relief Committed (status as of end-July 2009, Table 4 aggregate): 117,132 (In nominal terms).
  - HIPC Initiative assistance costs to non-Paris Club official bilateral creditors (aggregate): 4,172.9 (end-2008 NPV terms); assistance delivered: 1,466 (percent delivered 35.0 percent).
  - Multilateral creditors aggregate (Table 5 total): 21,398 (Total cost, end-2008 NPV terms); delivering/committed end-2008 NPV terms: 11,704.2 (54.8 percent of Total Cost).

*Source: IMF document excerpt — Executive Summary and selected chapters, sections, and annexes from _091509.*

### Executive Summary ......................................................................................................

### Executive Summary

### Overview
- This report updates the status of implementation, impact, and costs of the Enhanced Heavily Indebted Poor Country (HIPC) Initiative and the Multilateral Debt Relief Initiative (MDRI).
- Debt relief provided under the Initiatives has substantially alleviated debt burdens in recipient countries.
- Aided by continued flexibility on the part of IDA and the Fund, substantial progress has been achieved under the Initiatives since the last report, and a number of post-decision-point countries have already benefited from debt relief.

### Progress in Implementation
- Since September 2008, two countries reached the decision-point and qualified for HIPC Initiative assistance, and three countries reached the completion-point and qualified for irrevocable debt relief from the HIPC Initiative and the MDRI.
- In total, 35 (out of 40) HIPCs have qualified for HIPC Initiative assistance, of which 26 have reached the completion-point.
- A number of interim HIPCs are making progress, and are expected to reach the completion-point in the next 12–18 months.
- Assistance committed to the 35 post-decision-point HIPCs represents on average about 40 percent of these countries’ 2008 GDP, and after the full delivery of debt relief, will help to reduce their debt burden by about 80 percent.

Specific milestones (past year)
- Reached Completion-point:
  - Burundi (January 2009)
  - Central African Republic (June 2009)
  - Haiti (June 2009)
- Reached Decision-point:
  - Togo (November 2008)
  - Côte d’Ivoire (March 2009)
- A total of 35 countries (out of 40) are now past their decision point, of which 26 are past their completion point.

Use of flexibility in the framework
- While preserving the core principles of the HIPC initiative, IDA and the IMF have continued to make use of the flexibility available in the framework, allowing HIPCs to receive early debt relief by taking into account individual country situations.
- Pre-decision-point arrears clearance operations: Major multilateral creditors, including the African Development Bank (AfDB) and IDA, provided grants in support of arrears clearance operations for Togo and Côte d’Ivoire, which facilitated their reaching the decision point.
  - In Togo, IDA provided an exceptional allocation of US$146 million through a development policy operation, on grant terms, which was used to finance the arrears clearance to IDA. The AfDB provided US$24 million, 99 percent on grant terms from its Fragile States Facility, to finance arrears clearance to AfDB.
  - In Côte d’Ivoire, a similar grant-financing mechanism applied to half of the arrears to IDA (US$271 million) and two- (text continues in source).

- Establishment of a track record of reforms and economic stability: Côte d’Ivoire, after emerging from years of civil conflict with significantly weakened institutional and administrative capacity, was able to build a track record towards the decision point with the implementation of programs supported by two consecutive Emergency Post-Conflict Assistance (EPCA) purchases.
- Progress towards completion-point triggers: Judgment has continued to be used in this area. In the cases of Burundi and Haiti, while some triggers had been only partially implemented, the Boards decided that sufficient progress had been made towards the underlying objectives.
- Preparation and implementation of poverty reduction strategies: Togo reached the decision point on the basis of an Interim-Poverty Reduction Strategy Paper (I-PRSP). In a country with limited administrative capacity, debt relief could have been significantly delayed had a full PRSP been required.

### Remaining Challenges
- For the remaining pre-decision and several interim HIPCs to reach completion point, they will need to strengthen their policies and institutions, underpinned by continued support from the international community.
- Ensuring full debt relief from all creditors remains a challenge, including smaller multilateral creditors, non-Paris Club bilateral official creditors, and private creditors.
- Ensuring financing of the HIPC Initiative and the MDRI is a final challenge: although resources are adequate to deliver debt relief committed to most HIPCs, additional funds would be needed to provide debt relief to protracted arrears cases, and for countries that may become eligible for HIPC Initiative debt relief in the future.

### Debt Sustainability
- Notwithstanding debt relief, maintaining debt sustainability beyond the completion-point is a concern for many HIPCs, and the current global crisis has exacerbated such concerns.
- Staff’s analysis does not indicate a risk of a major debt crisis in HIPCs.
- HIPCs need to implement sound borrowing policies and strengthen their capacity to manage their public debt—two areas where the Bank and the Fund have already been assisting their low-income members.

### Structure of Report (sections covered)
- I. Introduction
- II. Progress in the Implementation of the HIPC Initiative and MDRI
- III. An Update on the Costs of the HIPC Initiative and the MDRI
- IV. Remaining Challenges
  - A. Taking Remaining Countries through the HIPC Initiative Process
  - B. Ensuring the Full Participation of All Creditors
  - C. Ensuring Financing of the HIPC Initiative and MDRI
- V. Debt Sustainability
- VI. Conclusions

*Source: Executive Summary (pages and sections as provided in the document).*

### 4.      Debt relief provided under the Initiatives has substantially alleviated debt

### 4.      Debt relief provided under the Initiatives has substantially alleviated debt burdens in recipient countries.

### Overall impact of the Initiatives
- The overall assistance committed to the 35 post-decision-point HIPCs under the Initiatives represents on average about 40 7 percent of these countries’ 2008 GDP.
- The debt burden for these countries is expected to be reduced by about 80 percent, compared to pre-decision-point levels, owing to this debt relief, together with relief under traditional mechanisms and additional (“beyond HIPC”) relief from Paris Club creditors.
- Debt relief committed under the Initiatives amounts to around US$124 billion in nominal terms, of which about US$52 billion are under the MDRI (including projected assistance under the MDRI to interim HIPCs).

### Debt stock and stages of relief (post-decision-point HIPCs)
- Figure 1 (end-2008 NPV terms) indicates sequential debt stock reductions:
  - Before traditional debt relief: 89.2 (in billions of U.S. dollars, end-2008 NPV terms)
  - After traditional debt relief: 75.6
  - After HIPC Initiative debt relief: 36.8
  - After additional bilateral debt relief: 31.5
  - After MDRI: 7.1
- Interim Countries vs Completion-Point Countries shown in Figure 1 (labels present in source).

### Additional assistance by IDA and the IMF to maintain debt sustainability
- Scaling up of debt management technical assistance through the Debt Management Facility (DMF):
  - As of end-July 2009, Debt Management Performance Assessments (DeMPAs) were carried out in 33 countries, including 21 HIPCs.
  - Technical assistance in implementing the Medium-Term Debt Strategy (MTDS) toolkit has been provided to six countries since the last report.
- Continued promotion of the Debt Sustainability Framework (DSF):
  - Three workshops organized for country authorities from low-income countries, including HIPCs.
  - Since 2006, outreach efforts have enhanced coordination among creditors and promoted DSF understanding among debtors.
  - IDA’s non-concessional borrowing policy (NCBP) emphasizes sound debt management, improved debt reporting, and, if warranted by debt sustainability concerns, reduction in IDA financing volume and adjustment to IDA lending terms.
  - To end-July 2009, eight countries were assessed under IDA’s NCBP; three exceptions (Mali, Rwanda and Senegal), two cases of hardening of terms (Angola and Ghana), and two preliminary exceptions (Mauritania and DRC).

### Fiscal outcomes: poverty-reducing expenditure and debt service
- For the 35 post-decision-point HIPCs, poverty reducing expenditure between 2001 and 2008 increased by 2 percentage points of GDP, on average.
- Debt service obligations declined by the same order of magnitude over this period.
- Note: Prior to 2008, figures represent debt-service paid; thereafter, debt-service figures are projected.

### Progress toward MDGs and heterogeneity of outcomes
- Post-completion-point HIPCs have made uneven progress towards meeting their MDGs:
  - With the exception of improvements in primary education and ensuring gender equality, more than half of post-completion-point HIPCs are unlikely to meet their MDGs.
  - Progress has been slowest in fragile states, which face difficult political and governance challenges for effective delivery of development finance and services.

### Costs of the HIPC Initiative (end-2008 NPV terms)
- Total cost of HIPC Initiative debt relief to creditors: US$74 billion.
  - More than half (US$39 billion) represents irrevocable debt relief to the 26 post-completion-point countries.
  - Cost for the 9 interim countries: US$19 billion (an increase of around 9 percent from last year), largely due to Côte d’Ivoire (estimated cost of US$3 billion).
  - Cost to the remaining five pre-decision-point HIPCs: US$17 billion, most accounted for by Sudan and Somalia.
  - Topping-up assistance (provided so far to six HIPCs) represents less than 3 percent of the total HIPC Initiative cost.
- Creditor shares of total HIPC cost:
  - Multilateral creditors: 45 percent of total cost.
    - IDA: 20 percent
    - IMF: 9 percent
    - AfDB Group: 7 percent
  - Paris Club creditors: 36 percent of total cost.
  - Multilateral creditor share is higher for post-completion-point countries (55 percent) than for interim (36 percent) or pre-decision-point (32 percent) countries.
  - Paris Club creditors estimated to deliver a larger share of relief to interim countries: 47 percent (compared to about one-third for post-completion-point and pre-decision-point countries).
  - Non-Paris Club and commercial creditors’ share highest in pre-decision-point countries: 34 percent.

### MDRI costs (end-2008 NPV terms)
- Total cost to the four participating creditors under MDRI: US$29 billion.
  - About 85 percent has already been delivered to the 26 post-completion-point countries and two non-HIPCs (Cambodia and Tajikistan) by the IMF.
  - Two thirds of total estimated MDRI cost borne by IDA.
  - MDRI shares by creditor (Figure 3, end-2008 NPV terms):
    - IDA: 18.2 bln. (64%)
    - IMF*: 4.2 bln. (15%)  [Note: * Excludes non-HIPCs]
    - AfDF: 3.8 bln. (13%)
    - IaDB: 2.4 bln. (8%)
- Table 3 MDRI breakdown (selected figures, end-2008 NPV terms):
  - Post-Completion-Point HIPCs total: 40.4 (Principal) + 4.6 (Foregone Interest) = 45.0 (Total); Principal and Foregone Interest: 24.4
    - IDA: 27.6 (Principal) + 2.7 (Foregone Interest) = 30.3 (Total); Principal and Foregone Interest: 15.3
    - IMF: 3/5/3.2...3.2 3.7 (format as in source)
    - AfDF: 6.3 0.8 7.2 3.1
    - IaDB: 3.3 1.0 4.4 2.4
  - Interim and Pre-Decision-Point HIPCs total: 7.5 0.7 8.2 4.1
    - IDA: 5.5 0.5 6.0 2.9
    - IMF: 0.6...0.6 0.6
    - AfDF: 1.5 0.2 1.6 0.7
    - IaDB: 0.0 0.0 0.0 0.0
  - All HIPCs total: 47.9 5.3 53.2 28.5
    - IDA: 33.1 3.2 36.3 18.2
    - IMF: 3.8...3.8 4.2
    - AfDF: 7.8 1.0 8.8 3.8
    - IaDB: 3.3 1.0 4.4 2.4
  - Non-HIPCs: 0.2 0.2 0.2 0.2
- Notes from Table 3:
  - Assistance in Nominal Terms and other clarifications are provided in the table (estimates preliminary and subject to assumptions; IMF estimated costs reflect stock of debt eligible for MDRI relief as of end-2004).

### Remaining challenges and prospects
- Three important challenges remain to fulfill the Initiatives’ objectives, including taking remaining countries through the HIPC process and addressing fragility-related constraints.
- Many pre-completion-point countries face common challenges: preserving peace and stability, improving governance, and delivering basic services; addressing debt vulnerabilities via HIPC and MDRI relief is important to overcome development challenges.
- Country-specific prospects over the next 12-18 months:
  - Interim countries at an advanced stage: Afghanistan, Liberia, and the Republic of Congo are well placed to reach completion points—their PRGF-supported programs are on track, they have developed and implemented poverty reduction strategies for at least one year, and have made significant progress on floating completion-point triggers.
  - Interim countries at a less advanced stage: Togo and Côte d’Ivoire are at earlier stages of implementing completion-point triggers but are making progress with PRGF-supported programs on track.
  - Pre-decision-point country example: Comoros’ request for a PRGF-supported program expected to be considered by the Executive Board of the Fund by end-September; successful implementation could lead to reaching decision point in the first half of 2010.
- Some countries have recently seen improved prospects:
  - Guinea-Bissau: implemented a program with IMF supported by EPCA purchases that could pave way for a PRGF arrangement; PRSP annual progress report expected by end-2009.
  - Democratic Republic of Congo: at an advanced stage in discussions with the IMF on a PRGF-supported program; final agreement possible once nonconcessional borrowing issues are resolved.
  - Chad: following decline in oil prices and emerging budgetary pressures, an IMF staff-monitored program (SMP) covering April-October 2009 was agreed; suitable implementation may be followed by a PRGF arrangement.
- Observation on interim-period durations (Figure 4): many remaining interim countries have been at that stage longer than others, underscoring challenges in sustaining progress under the Initiatives.

*Source: Excerpt from IMF document section titled "4.      Debt relief provided under the Initiatives has substantially alleviated debt burdens in recipient countries."*

### 16.      The main obstacles to the remaining countries’ progress under the HIPC

### 16.      The main obstacles to the remaining countries’ progress under the HIPC Initiative

### Main political and security obstacles
- Guinea: implemented most completion-point triggers but suffered a military coup in December 2008. The new regime does not currently enjoy broad international recognition, leading to:
  - suspension of discussions for the finalization of the second review of the PRGF-supported program and of the HIPC completion point;
  - suspension of several key financial assistance programs from other major development partners.
  - Note: The authorities issued the second PRSP in August 2007, a Joint Staff Assessment Note (JSAN) was prepared and presented to the Board in December 2007, and the first Annual Performance Review of the PRSP-II was issued in October 2008.
- Somalia and Sudan: afflicted by internal division and conflict, with protracted arrears to multilateral institutions. They will need to mobilize resources to clear their arrears prior to reaching their decision point. As of end-December 2008:
  - Somalia’s arrears to IDA and the IMF amount to US$192 million and US$373 million.
  - Sudan’s arrears to IDA and the IMF total US$508 million and US$1,532 million.
- Eritrea: authorities indicated in 2008 discussions they would consider seeking HIPC Initiative assistance once the security situation improves.
- Kyrgyz Republic: has not expressed willingness to avail itself of debt relief under the HIPC Initiative; based on the latest available data, debt indicators were estimated to be below the applicable HIPC Initiative thresholds.

### Ensuring full participation of all creditors — overview
- Objective: all creditors should deliver their share of debt relief to share equitably the burden among creditors.
- Large multilateral and Paris Club creditors have provided their full share; focus is on other creditors.

### Small multilateral creditors
- Nearly all multilateral creditors have committed to delivering HIPC Initiative debt relief at completion point.
- In addition to the largest four creditors (IDA, IMF, AfDB and IaDB), another 20 multilateral creditors, accounting for 14 percent of total HIPC assistance costs, have committed to deliver debt relief to all HIPCs at completion point.
- Six of these creditors also provide debt relief in the interim period through debt service reduction or rescheduling of arrears and maturities falling due; these are the European Union, the European Investment Bank, the Arab Bank for Economic Development in Africa, Central American Bank for Economic Integration (to Honduras only), Islamic Development Bank and OPEC Fund for International Development.
- Eight multilateral creditors, representing less than 0.5 percent of estimated HIPCs costs, have not yet indicated their intention to provide relief under the HIPC Initiative; these creditors are: Bank of Central African States (BEAC), Central African States Development Bank (BDEAC), the Economic Community of West African States (ECOWAS), Eastern and Southern African Trade and Development Bank (PTA Bank), Development Bank of Great Lake States (BDEGL), Fund of Aid and of Loans Guarantee of the Agreement Council (FEGECE), Fondo Centroamericano de Estabilización Monetaria (FOCEM), and the Islamic Fund for Solidarity and Economic Development (FSID).
- Monitoring efforts: A 2009 World Bank survey (seven responding smaller multilateral creditors: NDF, NIB, EU, EIB, IsDB, CABEI, IFAD) indicates such creditors have delivered half or more of their committed debt relief to completion-point countries.
- Staffs are working with remaining MDBs representing HIPC costs amounting to about 5 percent of the total committed to post-completion-point HIPCs to increase responses and institutionalize tracking.

### Non-Paris Club official bilateral creditors
- Progress since last year’s report has been limited.
- The share of HIPC Initiative debt relief delivered by these creditors, representing about 13 percent of the total cost, remains low, at around 35–40 percent (Appendix Table 15).
- Major developments:
  - Algeria cancelled claims on the Central African Republic and provided its full share of debt relief to Nicaragua.
  - China’s delivery of debt relief to Burundi and the Central African Republic occurred in 2007 (before their completion points).
  - Oman provided full debt relief to Senegal.
  - Portugal provided full debt relief to São Tomé and Príncipe.
- The group of non-Paris Club bilateral creditors includes Argentina, Brazil, the Republic of Korea, Kuwait, Mexico, Morocco, Portugal, South Africa, and Trinidad and Tobago (associated members of the Paris Club participating on a case-by-case basis).

### Commercial creditors
- Commercial creditors account for 6 percent of the total cost of debt relief to be provided to the 35 post-decision-point HIPCs.
- Commercial creditors’ share of cost estimates has been increasing primarily because they account for over 30 percent of total HIPC debt relief to Côte d’Ivoire.
- Improvements:
  - London Club creditors, accounting for nearly one-third of total HIPC assistance to Côte d’Ivoire, have provided expected debt relief through a rescheduling agreement signed in 1998.
  - In April 2009, commercial creditors provided full debt relief to Liberia under a debt buyback operation supported by the Debt Reduction Facility (DRF) of IDA and contributions from bilateral donors, which helped extinguish US$1.2 billion of commercial debt at a deep discount (97 percent of face value).
- Litigation:
  - Litigation by commercial creditors, previously an impediment, appears less problematic according to HIPC authorities.
  - Early engagement and DRF operations reduced outstanding litigation cases against HIPCs from 33 to 14 over the past year (the 2008 Status of Implementation Report had reported 54 court cases filed over the past decade, 33 still active at that time).
  - Reductions mostly reflect DRF operations in Nicaragua and Liberia and out-of-court settlements by Cameroon, the Republic of Congo, Sierra Leone and Zambia; a joint litigation by five creditors against Nicaragua was dropped.
  - New lawsuits were initiated last year against the DRC, Sierra Leone, Sudan and Zambia.
  - DRF operations under preparation (including for the DRC and Sierra Leone) may help reach settlements if litigating creditors participate in buyback operations.
  - Additional support for HIPCs facing litigation will be available from the African Legal Support Facility, formally launched by the African Development Bank on June 29, 2009.

### Legal and legislative measures
- Initiatives in donor countries to curtail litigation scope against HIPCs:
  - United Kingdom: consultation on legislation to limit the proportion of debts previously contracted by a HIPC that a creditor could reclaim under U.K. law.
  - United States: U.S. Congress considering similar proposals; H.R. 2932 ("Stop VULTURE Funds" Bill) introduced in June 2009.
  - Belgium: a law with similar intent was introduced in May 2008.

### Ensuring financing of the HIPC Initiative and MDRI
- World Bank (DRTF and IDA):
  - Debt Relief Trust Fund (DRTF) and IDA are sufficiently resourced to cover debt relief costs under the HIPC Initiative over the IDA15 commitment period (FY09-11).
  - Expectations: future IDA replenishments would include sufficient resources to finance IDA’s cost of debt relief under the Initiatives.
  - DRTF may utilize received donor contributions for arrears clearance operations of IDA, as well as possible contributions from IBRD net income to meet any remaining structural gap in the MDRI financing framework.
  - To mid July 2009, donors have pledged close to US$4 billion to the DRTF and have contributed more than US$3.8 billion in the form of cash and promissory notes.
  - The Trust Fund has disbursed more than US$2.8 billion to regional and sub-regional creditors to support their provision of debt relief to eligible HIPCs.
  - IDA resources for IDA15 (FY09-11) include donor contributions amounting to SDR 1.1 billion for HIPC relief and SDR 4.1 billion for debt forgiveness under the MDRI. Donors also committed SDR 0.9 billion to finance the full cost of arrears clearance by eligible countries to IDA and the IBRD through the DRTF.
  - To date, the Trust Fund has received and reimbursed approximately US$2.9 billion to IDA out of allocations from IBRD's net income and creditor-specific contributions made by donors to the Debt Relief Trust Fund.
- IMF:
  - Available resources are estimated sufficient to cover the projected cost of debt relief to all remaining HIPCs, except the protracted arrears cases of Somalia and Sudan.
  - Because there was no provision for debt relief to Somalia and Sudan under the original HIPC/MDRI financing framework, additional resources would be needed when these countries are ready to embark on the HIPC Initiative.
  - Additional resources would also be needed to finance debt relief to any new countries that may be found eligible for the HIPC Initiative and the MDRI.

### Debt sustainability — impact and risks
- Debt relief under the Initiatives has considerably reduced debt vulnerabilities in post-completion-point countries.
- Debt vulnerabilities in post-completion-point HIPCs—as measured by the distribution of Debt Sustainability Framework (DSF) risk ratings—are on average much lower than in pre-completion-point HIPCs; comparison with non-HIPCs is also favorable (Table 4).
- Nevertheless, a few post-completion-point countries remain vulnerable: five are still characterized as being at a high risk of debt distress (this compares to four countries last year – Burkina Faso, Gambia, São Tomé and Príncipe and Rwanda; while Rwanda’s rating was upgraded to moderate in the past year, the list now also includes Burundi and Haiti, two HIPCs that reached their completion point in 2009).
- Note: these risk ratings are based on the most recent DSAs endorsed by the Boards, generally undertaken during the last year; for many DSAs, the underlying macroeconomic framework may not fully reflect the adverse impacts of the ongoing global financial crisis.
- Global developments:
  - The global economic downturn is expected to have a strong negative effect on low-income countries through exports, FDI, remittances and (possibly) aid flows.
  - Adverse impact on economic activity and government revenues is expected to lead to increased budgetary and external financing gaps in many countries.
  - It is anticipated that debt burden indicators in all LICs will deteriorate; the magnitude depends on persistence of the downturn and degree of macroeconomic adjustment.
- Table 4: Distribution of risk of debt distress by country groupings (based on DSAs available as of end-July 2009)
  - All LICs (Number of Countries 70): Low 30.0 Moderate 34.3 High 22.9 In debt distress 12.9
  - Non-HIPCs and completion point HIPCs (Number of Countries 57): Low 36.8 Moderate 38.6 High 21.1 In debt distress 3.5
  - Non-HIPCs (Number of Countries 31): Low 35.5 Moderate 35.5 High 22.6 In debt distress 6.5
  - Completion point HIPCs (Number of Countries 26): Low 38.5 Moderate 42.3 High 19.2 In debt distress 0.0
  - Other HIPCs (pre-completion point HIPCs) (Number of Countries 13; excludes Somalia, as no DSA is available): Low 30.0 Moderate 15.4 High 30.8 In debt distress 23.8
  - Interim countries (Number of Countries 9): Low 0.0 Moderate 11.1 High 33.3 In debt distress 55.6
  - Pre-decision point countries (Number of Countries 4): Low 0.0 Moderate 25.0 High 25.0 In debt distress 50.0

*Source: Excerpt from IMF chapter "16. The main obstacles to the remaining countries’ progress under the HIPC Initiative" (text as provided).*

### 31.      Staffs have analyzed the impact of the crisis on debt vulnerabilities in HIPCs

### 31.      Staffs have analyzed the impact of the crisis on debt vulnerabilities in HIPCs

### Approach and data sources
- Two-pronged approach:
  - Where a member’s DSA was issued to the Boards recently (i.e., after end-May 2009), the analysis is based on the DSA.
  - In all other cases, the impact of the crisis on debt vulnerabilities is simulated by updating the most recent DSA using the macroeconomic projections contained in the August WEO submission (see Box 2).
- It is assumed that recent DSAs are based on macroeconomic frameworks that capture the impact of the crisis more fully than projections underlying older DSAs.

### Criteria for judging increased vulnerability
- Criteria depend on initial risk ratings:
  - Countries rated low or moderate risk of external debt distress are judged vulnerable if the analysis indicates the possibility of a rating downgrade. Such developments signal a deterioration in the long-term debt outlook rather than an impending debt crisis.
  - For high-risk countries, a country is deemed more vulnerable if at least two debt burden indicators experience a large and sustained breach of their DSF thresholds. Such developments in high-risk countries may point to more severe and pressing debt-related problems.

### Aggregate impact of the crisis on macroeconomic aggregates in HIPCs
- Comparison of recent DSAs and the August WEO submission with older DSAs indicates, on average:
  - nominal GDP revised downward by about 7 percent
  - exports revised downward by about 9 percent
  - government revenue revised downward by 12 percent

### Country-level findings on vulnerability
- The analysis does not suggest a risk of a major debt crisis in HIPCs, but points to an increase in debt vulnerabilities for a number of countries.
  - High-risk countries:
    - Afghanistan, an interim HIPC, is likely to experience a large increase in its debt burden indicators.
  - Moderate-risk countries:
    - Five post-completion-point HIPCs could face increased debt vulnerabilities: Ethiopia, Malawi, Mauritania, Nicaragua, and Sierra Leone.
    - For Ethiopia, Mauritania and Nicaragua the breach of DSA thresholds under the updated scenarios are temporary and/or limited.
  - Low-risk countries:
    - Mali, a post-completion-point country, could also face increased debt vulnerabilities. Nonetheless, while more vulnerable now, Mali’s debt-related problems do not appear to be serious.
- Note on comparisons:
  - The increase for countries where the analysis is based on simulations is in relation to the latest available DSAs, and for those where the analysis is based on a recently available DSA, the comparison is with the previous DSA.
  - While the more recent DSAs typically show increased debt vulnerabilities, no country has experienced a deterioration of its risk rating. In the recent DSAs, only the Central African Republic has experienced a change in its risk of debt distress (improvement from high risk to moderate) after it received HIPC and MDRI debt relief.

### Implications by HIPC stage
- High debt vulnerabilities in post-completion-point countries pose more serious problems than in pre-decision-point and interim countries:
  - For pre-decision-point countries, HIPC debt relief can be tailored to their specific circumstances.
  - For interim countries, HIPC debt relief committed at the decision-point may be topped-up if deterioration in debt indicators results from shocks beyond the country’s control.
  - For post-completion-point countries, these mechanisms are no longer available to address a deterioration in the debt outlook.

### Policy implications and recommendations
- Close monitoring:
  - Close monitoring of debt developments in high-risk post-completion countries will be needed to safeguard debt sustainability.
  - Countries at higher risk will need to adopt particularly prudent fiscal and borrowing policies to reduce debt-related vulnerabilities.
- Donor and creditor support:
  - Donors and official creditors will need to provide HIPCs with highly concessional resources in order to maintain debt sustainability and avoid excessive adjustment in the more vulnerable countries.
  - Tighter fiscal constraints in donor and creditor countries raise concerns over the availability of additional highly concessional resources.
  - The lack of adequate concessional resources combined with a longer recession could worsen further debt indicators and lead to the re-emergence of debt related problems in post-completion-point HIPCs who have exhausted all of the standard avenues of debt relief.
- Debt management capacity:
  - It is imperative that efforts to improve debt management capacity be sustained (for both external and domestic public debt).

### Bank and Fund actions to help affected countries
- IDA has made highly concessional financing available for vulnerable countries.
- At the Fund:
  - As part of the reform of its LIC financing facilities, the IMF’s Board increased significantly the volume of concessional resources available for lending to LICs.
  - The Board approved temporary forgiveness of interest on all concessional loans through end-2011, as well as on all outstanding ENDA/EPCA credit through end-January 2012.
  - The Board adopted a more concessional interest rate structure for the medium term.
- Advocacy and technical support:
  - The Bank and the Fund have continued to advocate to donors the importance of providing concessional financing for vulnerable countries and of honoring prior commitments on aid to LICs.
  - Staffs are providing LIC members policy and technical advice as regards the appropriate response to the crisis.
  - Staffs continue to provide technical assistance to improve debt management capacity and training in the use of the DSF.

### Conclusions (summary)
- Progress:
  - Very significant progress has been achieved in implementing the HIPC Initiative and the MDRI.
  - With 35 of 40 eligible countries reaching the decision point by end June-2009—of which 26 have reached the completion point—the HIPC Initiative has provided much needed debt relief to most HIPCs.
- Remaining challenges:
  - Some pre-decision point countries continue to be affected by severe political problems.
  - In a number of long-standing interim countries, recent progress is still at a nascent stage; to reach the completion point they will need to strengthen policies and institutions and require continued international support.
  - It is important for all creditors to provide their full share of HIPC debt relief, and for donors to ensure that the Bank and the Fund have adequate resources to provide their share of debt relief under the Initiatives to all eligible countries.
- Ongoing sustainability concerns:
  - Notwithstanding debt relief, maintaining debt sustainability beyond the completion-point remains an issue for many HIPCs.
  - The staff analysis reveals that the current global crisis has exacerbated debt sustainability concerns for a number of countries, but does not indicate a risk of a major debt crisis in HIPCs.
  - HIPCs need to implement sound borrowing policies and strengthen their capacity to manage their public debt.

### Box 2 — Simulation methodology (summary)
- Framework:
  - Assessment undertaken within a framework consistent with the DSF.
  - For every country, assessment rests upon evolution of the five DSF debt-burden indicators under baseline scenarios and stress tests, and use of country-specific policy dependent debt-burden thresholds.
- Starting point:
  - The most recent LIC DSA provides initial levels for capacity to repay, variables assessing external and fiscal financing needs, and measures of indebtedness (PV of PPG external debt and debt service).
- Two updated “baseline” scenarios:
  - WEO fiscal scenario: financing needs = government revenues + grants - expenditures.
  - WEO external scenario: financing needs = exports + current transfers + net FDI – imports.
  - A deterioration in financing needs compared to the initial LIC DSA is assumed to translate into additional external borrowing only if the country is running a deficit under the WEO scenario.
  - Additional financing needs are assumed to be met exclusively through external borrowing to gauge maximum impact on vulnerability assessment (DSF thresholds relate to external debt).
- Projection periods and adjustments:
  - Over 2008-2014, WEO country forecasts are used to update measures of capacity to repay and variables affecting financing needs; WEO growth rates update the level of relevant LIC DSA variables.
  - Over 2015-2019, financing needs in WEO scenarios return smoothly to their respective LIC DSA level (in percentage of GDP).
  - Starting in 2015, under both scenarios, measures of capacity to repay, net FDI, net transfers and grants grow at same rate envisaged under the initial LIC DSA.
  - Transitory shocks to growth are not reversed in later years, resulting in a permanent shock to the level of variables.
  - Spending variables (government expenditures and imports) adjust to achieve targeted financing needs.
- Stress tests and vulnerability rules:
  - Stress tests are not directly conducted in WEO scenarios; response of debt burden indicators to standard DSF stress tests is assumed similar to the initial LIC DSA.
  - Risk ratings are not determined in this exercise. Countries are deemed more vulnerable based on:
    - Moderate risk countries: more vulnerable if they experience a breach of threshold under the “baseline” WEO scenarios.
    - Low risk countries: more vulnerable if they experience a breach of threshold under the stress tests or the baseline WEO scenarios.
    - High risk countries: more vulnerable if at least two debt burden indicators are on average 15 percent higher than their thresholds.
  - A 15 percent increase in debt burden indicators above their thresholds is consistent with an increase in the probability of debt distress of about 10 percent.
- Financing assumptions:
  - Additional external financing assumed available at a grant element of 45 percent.
  - If external financing were obtained on less concessional terms, it would result in a greater deterioration of debt burden indicators.
  - If part of fiscal financing needs are met with domestic borrowing, it would result in lower external debt burden indicators.

*Source: _091509 - 31.      Staffs have analyzed the impact of the crisis on debt vulnerabilities in HIPCs*

### Annex I. Country Status Unde

### Annex I. Country Status Unde r the Enhanced HIPC Initiative

### Table 1. HIPC Pre-Decision-Point Countries
- Comoros
  - Recent political developments: Although some tensions between the Union and islands authorities remain, political conditions have markedly improved since the election of a pro-Union president on the island of Anjouan in June 2008. In May 2009 a constitutional amendment enhancing central government authority over budget and economic management was successfully approved through a fair and open national referendum.
  - Risk of debt distress and date of the assessment: In Debt Distress December 2008
  - PRSP status: The PRSP is expected to be completed during the third quarter of 2009.
  - IMF program and macroeconomic status: A six-month EPCA-supported program was approved by the Board in December 2008. Discussions on a new PRGF took place in June and July 2009, with Board consideration slated to take place in mid-September.
  - Decision-point date: Tentatively Q2 of 2010

- Eritrea
  - Recent political developments: Since independence in 1993, Eritrea has been ruled by the People’s Front for Democracy and Justice. Relations with Sudan have improved, but border tensions with Ethiopia remain. Relations with Djibouti came under renewed stress as a result of border clashes in 2008.
  - Risk of debt distress and date of the assessment: High April 2008
  - PRSP status: There is no recent PRSP, and no work ongoing towards its preparation.
  - IMF program and macroeconomic status: There are no ongoing discussions for a Fund program. The 2009 Article IV mission is scheduled for September 2009.
  - Decision-point date: Uncertain

- Kyrgyz Republic
  - Recent political developments: President Bakiyev was re-elected to a second term in the July 2009 elections.
  - Risk of debt distress and date of the assessment: Moderate May 2009
  - PRSP status: The Boards endorsed the PRSP – called Country Development Strategy and its accompanying JSAN in June 2007. In 2009, the authorities completed an update of the PRSP, that extends it to 2011 and takes into consideration the external challenges facing the economy.
  - IMF program and macroeconomic status: An 18-month arrangement under the Exogenous Shocks Facility (ESF) was approved in December 2008 to support the government’s program to manage the impact of the various exogenous shocks that have hit the economy. The first review was successfully completed in May 2009.
  - Decision-point date: No intention*  
  - Note: * The decision-point document was prepared in February 2007 but withdrawn at the request of the Government, based on its intention to not move to decision-point. Based on 2008 debt data, the Kyrgyz Republic remains well below the HIPC thresholds.

- Somalia
  - Recent political developments: The political and security situation remains highly unsettled. Preparations for national elections are now focused on 2011.
  - Risk of debt distress and date of the assessment: N/A
  - PRSP status: There is no PRSP in place in Somalia and one is not expected in the near term.
  - IMF program and macroeconomic status: Somalia has not had an IMF-supported program since 1987, the lack of economic data precludes an assessment of the macroeconomic situation and prospects for Fund re-engagement—either via surveillance or an arrangement—in the foreseeable future are minimal.
  - Decision-point date: Uncertain

- Sudan
  - Recent political developments: Concerns on Darfur and on the stability of the Comprehensive Peace Agreement are still persistent. Local, legislative, and presidential elections have been postponed to February 2010. A referendum in Southern Sudan to decide on unity or secession is expected in 2011.
  - Risk of debt distress and date of the assessment: In Debt Distress November 2008
  - PRSP status: The PRSP is expected to be completed sometime during 2009-2010.
  - IMF program and macroeconomic status: An 18-month Staff Monitored Program (SMP) was negotiated for the period July 2009 through December 2010. Sudan has been hard-hit by the global crisis, largely via a sharp deterioration in its terms of trade. The objectives of the SMP are to restore macroeconomic stability and build up international reserves.
  - Decision-point date: Uncertain

### Table 2A: Interim Countries — Summary by Country (selected entries)
- Afghanistan
  - PRSP status: The first progress report for the PRSP, the Afghanistan National Development Strategy (ANDS) is expected to be finalized in July / August 2009. Key institutional steps have been taken to move forward with the ANDS implementation.
  - Risk of debt distress and date of the assessment: High August 2008
  - IMF program: A PRGF-supported program approved in June 2006 is on track, and the fifth review was completed in April 2009. The program has been extended to March 2010, to allow the authorities more time to implement pending reforms and reach the HIPC completion-point.
  - Completion-point date (planned): Q4 of 2009

- Cote D’Ivoire
  - PRSP status: A PRSP was prepared in a participatory manner and approved in February, 2009 covering the period from 2009 to 2015.
  - Risk of debt distress and date of the assessment: High March 2009
  - IMF program: A PRGF supported program was approved in March 2009.
  - Completion-point date (planned): 2010

- Chad
  - PRSP status: A new PRSP covering the period from 2008-2011 was approved in April, 2008. The first annual progress report on the implementation of the PRSP is under preparation.
  - Risk of debt distress and date of the assessment: Moderate January, 2009
  - IMF program: The last PRGF-supported program, approved in February 2005 and later extended to May 2008, expired without the completion of any review. In June 2009 the staff and the authorities reached agreement on a staff-monitored program covering April-October 2009. If implemented well, the SMP could be followed by an PRGF-supported arrangement.
  - Completion-point date (planned): 2010

- Republic of Congo
  - PRSP status: The PRSP was finalized in April 2008 and submitted, along with a JSAN, to the Executive Boards of the IMF and IDA in August 2008. The authorities recently completed the first Annual Progress Report on the PRSP, and a JSAN will be presented to the Executive Boards of the IMF and IDA later this year.
  - Risk of debt distress and date of the assessment: High June 2009
  - IMF program: The Fund’s Executive Board approved a new 3-year PRGF arrangement for Congo in December 2008, and completed the first review of the arrangement in June 2009.
  - Completion-point date (planned): Q4 of 2009

- Democratic Republic of the Congo
  - PRSP status: The PRSP and corresponding JSAN were discussed in May and September 2007, respectively, by the IDA and IMF Boards. A PRSP progress report was completed in October 2008, and an updated PRSP for 2009-2010 is being finalized.
  - Risk of debt distress and date of the assessment: In Debt Distress August 2007
  - IMF program and macroeconomic status: Following mixed performance under the 2008 staff-monitored program (SMP), related in part to a terms of trade shock and security problems, the Fund’s Board approved a disbursement under the rapid access component of the Exogenous Shocks Facility in March 2009. Ongoing discussions on a new three-year PRGF arrangement could be finalized once pending issues related to large nonconcessional borrowing are resolved.
  - Completion-point date (planned): 2010

- Guinea
  - PRSP status: The PRSP-II was issued in August 2007 and presented to the IDA and the IMF Boards in December 2007. The first Annual Performance Review of the PRSP-II was issued in October 2008.
  - Risk of debt distress and date of the assessment: In Debt Distress December 2007
  - IMF program: Discussions on the second review of the PRGF, approved in December 2007, were initiated in Conakry in September 2008 but could not be finalized because of the coup d’état that followed the death of President Conté in December 2008.
  - Completion-point date (planned): Unclear

### Table 2A: Interim Countries — Summary by Country (concluded)
- Guinea Bissau
  - PRSP status: A PRSP was approved in 2007 and presented to the IMF and the IDA Boards in April and May 2007 respectively. The first annual progress report is scheduled to be validated in September 2009.
  - Risk of debt distress and date of the assessment: In Debt Distress May 2009
  - IMF program: Notwithstanding a tight fiscal situation, performance under an EPCA-supported program, approved in January 2008, has been broadly satisfactory. A third disbursement under the EPCA was approved by the IMF Executive Board in June 2009.
  - Completion-point date (planned): 2010

- Liberia
  - PRSP status: A PRSP was approved in March 2008. The outline of the first annual progress report (APR) was presented in June 2009. The APR is expected to be completed by August 2009.
  - Risk of debt distress and date of the assessment: In Debt Distress April 2009
  - IMF program: In March 2008, the IMF Executive Board approved three-year arrangements under the EFF and the PRGF. The second review under the PRGF was completed in May 2009 and the third review is scheduled for November-December 2009.
  - Completion-point date (planned): Q1 of 2010

- Togo
  - PRSP status: Togo’s I-PRSP was adopted in March 2008, and discussed by the Executive Boards of the IMF and IDA in April 2008. The full PRSP has been completed and work on the JSAN together with the Bank is on-going.
  - Risk of debt distress and date of the assessment: In Debt Distress November 2008
  - IMF program: In April 2008, the IMF’s Executive Board approved Togo’s first PRGF-supported program since the mid-1990s. The second review under the PRGF was successfully completed in April 2009. [The third review is scheduled for November-December 2009]
  - Completion-point date (planned): Q4 of 2010

### Table 2B: Interim Countries — Status of Completion-Point Triggers (selection)
- Afghanistan
  - PRSP: Good progress (The review mission will take place in September, 2009)
  - Macroeconomic stability: Good progress
  - Public financial management (PFM): Completed
  - Social sector: Regulations have to be passed with regard to the pension reform and the status of the military retires. Also HR departments in four ministries need to become fully functional and additional regulations still need to be passed.
  - Debt management: Completed
  - Governance / Transparency / Anticorruption: Completed
  - Structural reforms: Authorities agreed to develop regulations and guidelines for minerals extraction and establish a fully operational hydrocarbon/mining cadastre. Cadastre is under preparation and regulations for minerals extraction have yet to be passed.

- Cote D’Ivoire
  - PRSP: Good progress
  - Macroeconomic stability: Good progress
  - PFM: Limited progress
  - Social sector: Limited progress given recent DP date (March, 2009)
  - Debt management: Good progress
  - Governance / Transparency / Anticorruption: Limited progress
  - Structural reforms: Limited progress

- Chad
  - PRSP: Partially completed
  - Macroeconomic stability: Weak progress
  - PFM: Slow progress — The public expenditure tracking system for primary education is not functional and the computerization of the expenditure circuit remains to be completed.
  - Social sector: Early progress has deteriorated.
  - Debt management: N/A
  - Governance / Transparency / Anticorruption: Early progress has deteriorated. The implementation of the governance strategy and action plan needs to be accelerated.
  - Structural reforms: N/A
  - Note: 51 Assessment of progress in more recent years continues to be constrained by the lack of data covering 2006, 2007, and 2008.

- Republic of Congo
  - PRSP: Partially completed
  - Macroeconomic stability: Good progress
  - PFM: Partially Completed
  - Social sector: Completed
  - Debt management: Completed
  - Governance / Transparency / Anticorruption: Good progress
  - Structural reforms: Good progress

- Democratic Republic of Congo
  - PRSP: Partially completed
  - Macroeconomic stability: Good progress. Pending issues: the Chinese EXIM bank loans impact on the country’s DSA.
  - PFM: Good progress
  - Social sector: Little progress with the allocation of budgetary savings from HIPC debt relief to priority sectors.
  - Debt management: Good progress
  - Governance / Transparency / Anticorruption: Good progress
  - Structural reforms: N/A

- Guinea
  - PRSP: Partially completed
  - Macroeconomic stability: Good progress — Satisfactory implementation of the PRGF-supported program.
  - PFM: N/A
  - Social sector: There are measurement issues regarding the triggers in the education and health sectors.
  - Debt management: N/A
  - Governance / Transparency / Anticorruption: Good progress
  - Structural reforms: N/A

- Guinea Bissau
  - PRSP: Partial progress
  - Macroeconomic stability: Limited Progress — The country is currently under an EPCA program and could move to a PRGF later in 2009 if performance under the EPCA program is satisfactory.
  - PFM: Progress
  - Social sector: Completed
  - Debt management: N/A
  - Governance / Transparency / Anticorruption: Limited Progress
  - Structural reforms: Public procurement system reform needs to be extended across all ministries. Remedial measures need to be implemented to address the objectives of an outdated trigger52
  - Note: 52 The trigger called for the findings of an external audit of the 1997-99 budgets to be submitted to the Parliament and to form the basis of a corrective action.

- Liberia
  - PRSP: Completed
  - Macroeconomic stability: Good progress
  - PFM: Ongoing but delayed. PFM law was submitted to parliament in December 2008 and is now at the stage of the final discussion for approval.
  - Social sector: Good progress
  - Debt management: Good progress
  - Governance / Transparency / Anticorruption: Good progress
  - Structural reforms: N/A

- Togo
  - PRSP: Good progress
  - Macroeconomic stability: Good progress
  - PFM: Good progress
  - Social sector: Limited progress given recent DP date (November 2008)
  - Debt management: Limited progress given recent DP date (November 2008)
  - Governance / Transparency / Anticorruption: Limited progress given recent DP date (November 2008)
  - Structural reforms: Good progress

### Table 3: Post-Completion-Point Countries — Progress towards Achieving the MDGs
- The document includes a table (Table 3) reporting country-level status (e.g., "On track", "Off track", "Possibly on track", "Progress", "No information") across MDG indicators including:
  - End poverty and hunger
  - Education for all
  - Gender equality
  - Save children’s lives
  - Make motherhood safe
  - Stop HIV/AIDS and other diseases
  - Protect environment
  - Build global partnership for development
- Examples of country entries (preserved as presented):
  - Benin: Off track; On track; Off track; Off track; On track; On track; On track; Off track
  - Bolivia: On track; Off track; On track; On track; On track; On track; On track; Off track
  - Burkina Faso: Off track across many indicators; On track for some governance-related indicators; Off track for environment
  - Ethiopia: Off track; On track; On track; Off track; On track; On track; Off track; On track
  - Malawi: On track; Possibly On track; Off track; On track; Off track; On track; On track; Off track
  - (Full matrix of country-by-MDG statuses appears in the source table.)
- Source and methodological note included in the table:
  - Source: World Bank and IMF staff; and Global Monitoring Report, 2009.
  - * The World Bank determines whether a country is on or off track to meet a given MDG by 2015 when at least two observations are available after 1990, with a sufficient number of years separating them. To do so, it compares the progress recorded thus far with that needed to reach the MDG, under the assumption that progress becomes increasingly difficult the closer countries get to the goal.

*Italic: Annex I. Country Status Under the Enhanced HIPC Initiative (source content).*

### Annex II. Country Coverage, Data Sources, and Assumptions for the HIPC Initiative and

### Annex II. Country Coverage, Data Sources, and Assumptions for the HIPC Initiative and MDRI Costing Exercise

### Country Coverage
- Post-decision-point countries included in the costing analysis (35): Afghanistan, Benin, Bolivia, Burkina Faso, Burundi, Cameroon, Central African Republic, Chad, Côte d’Ivoire, Democratic Republic of the Congo, Republic of Congo, Ethiopia, The Gambia, Ghana, Guinea, Guinea-Bissau, Guyana, Haiti, Honduras, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nicaragua, Niger, Rwanda, São Tomé and Príncipe, Senegal, Sierra Leone, Tanzania, Togo, Uganda, and Zambia.
- Pre-decision-point countries used for the pre-decision-point costing analysis (4 HIPCs): Comoros, Eritrea, Somalia, and Sudan.
- Note: Kyrgyz Republic is not included in cost estimates, as its indebtedness ratio at end-2007 is estimated at below the HIPC Initiative threshold.

### Data Sources and Timing
- Staff estimates are based on HIPC Initiative decision and completion-point documents for all 35 post-decision-point countries, and on preliminary documents or estimates presented in “Heavily Indebted Poor Countries (HIPC Initiative) – List of Ring-Fenced Countries that Meet the Income and Indebtedness Criteria at end-2004” for the 4 pre-decision-point HIPCs.
- Data was updated through end-July 2009.

### Assumptions for HIPC Initiative and MDRI Costing Exercise
- Total cost calculations include costs under the original and enhanced HIPC Initiative frameworks and the MDRI.
- Cost estimates for the HIPC Initiative are based on debt data after full use of traditional debt-relief mechanisms.
- Exchange rates used for MDRI calculations:
  - IDA and AfDF: initial MDRI Trust Fund replenishment rate of 1.477380 US dollars per SDR applied for the period FY07-08; cost estimates for FY09 onward based on the IDA15 foreign exchange reference rate of 1.524480 US dollars per SDR.
  - IMF: the exchange rate of the date that debt relief was delivered, and, where debt was not yet delivered, the rate as of end-December 2008.
  - IaDB: currency units in US dollars at end-2006.

### Update of Cost Estimates in Net Present Value (NPV) Terms
- HIPC Initiative assistance costs calculated in NPV terms at the time of decision-point are discounted to end-2008 using the average interest rate applicable to the debt relief.
- Discount rate used: 5.0 percent, corresponding to the implicit long-term interest rate of currencies that comprise the SDR basket over the period 2006-2008, calculated as a 6-month average of the Commercial Interest Reference Rate (CIRR) over this period, weighted by the participation of the currencies in the SDR basket.
- The same 5.0 percent rate was used to calculate MDRI debt relief in end-2008 NPV terms.

### Key Findings — Aggregate Debt Service and Poverty-Reducing Expenditure (Table 1 highlights)
- Debt Service Paid/Due after Enhanced HIPC Initiative and MDRI (selected years, In millions of U.S. dollars):
  - 2001: 3,200
  - 2002: 3,279
  - 2003: 3,677
  - 2004: 4,052
  - 2005: 3,968
  - 2006: 3,843
  - 2007: 2,880
  - 2008: 3,141
  - 2009: 2,878
  - 2010: 2,528
  - 2011: 2,817
  - 2012: 3,699
  - 2013: 3,975
- Projected debt service savings from MDRI (selected years, In millions of U.S. dollars):
  - 2010: 1,207
  - 2011: 1,511
  - 2012: 1,581
  - 2013: 1,418
  - 2014: 1,394 (note: table projects through 2013; these figures appear in the projections column)
- Poverty-Reducing Expenditures (In millions of U.S. dollars):
  - 2001: 6,494
  - 2002: 7,590
  - 2003: 8,811
  - 2004: 10,818
  - 2005: 15,248
  - 2006: 18,227
  - 2007: 21,824
  - 2008: 26,697
  - 2009 (Prel.): 28,836
  - 2010 (Projections): 30,187
  - 2011: 32,510
  - 2012: 34,134
  - 2013: 36,285
- Average ratios (in percent):
  - Debt Service/Exports ranged from 12.7 (2001) down to 4.2 (2013), with values such as 11.4 (2002), 10.2 (2003), 11.0 (2004), 9.3 (2005), 7.8 (2006), 4.7 (2007), 4.1 (2008), 3.9 (2009).
  - Debt Service/GDP ranged from 3.2 (2001) down to 1.1 (2013), with 2.7 (2002), 2.5 (2003), 2.6 (2004), 2.3 (2005), 2.0 (2006), 1.3 (2007), 1.1 (2008), 1.0 (2009).
  - Poverty-Reducing Expenditure/Government Revenue increased from 42.1 (2001) to 58.5 (2013).
  - Poverty-Reducing Expenditure/GDP increased from 6.3 (2001) to 10.4 (2013).

### Creditor Commitments and Delivery — Aggregates and Major Multilaterals
- Total Debt Relief Committed (status as of end-July 2009, Table 4 aggregate): 117,132 (In nominal terms: columns show totals across HIPC and MDRI categories).
- Totals by creditor group (Table 5, HIPC Initiative cost estimates to multilateral creditors, in end-2008 NPV terms):
  - Total (all multilaterals listed): 21,398 (Total cost, end-2008 NPV terms)
  - Delivering or Committed to Deliver Debt Relief (aggregate delivered/committed end-2008 NPV terms): 11,704.2 (54.8 percent of Total Cost)
  - World Bank Group: Total Relief Cost 2,626; Committed/Delivered in end-2008 NPV Terms 10,641; Delivering/Committed 5,045 (47 percent of its cost)
  - African Development Bank (AfDB) Group: Total Relief Cost 2,122; Committed/Delivered 2,889; Delivering/Committed 1,422 (49 percent)
  - IMF: Total Relief Cost 2,626; Committed/Delivered 3,046; Delivering/Committed 3,056 (100 percent)
  - IaDB: Total Relief Cost 551; Committed/Delivered 1,727; Delivering/Committed 8 (43 percent)
  - Other multilaterals listed with varying shares and percent committed/delivered.
- World Bank Group (Table 6A/B highlights):
  - World Bank committed assistance under HIPC Initiative (total for 26 post-completion-point HIPCs): 13,268.7 (In millions of U.S. dollars, committed assistance).
  - World Bank delivered assistance in end-2008 NPV terms (aggregate): 10,640.6.
  - World Bank delivered assistance under MDRI (IDA only) in end-2008 NPV terms: 5,045.4.
  - Combined delivered under HIPC Initiative and MDRI in end-2008 NPV terms (TOTAL for post-completion HIPCs): 15,319.4; in nominal terms delivered: 25,959.9; delivered in end-2008 NPV terms under HIPC Initiative and MDRI: 20,364.7.
  - World Bank Group debt service before and after HIPC and MDRI relief is presented country-by-country for 2000-2013 (tables provide detailed annual series).
- IMF (Table 7A/B highlights):
  - IMF HIPC Initiative and MDRI delivery status presented in SDRs and converted to U.S. dollars for 1998-2009.
  - Total HIPC Initiative debt relief delivered and MDRI debt relief to HIPCs and non-HIPCs reported; aggregate totals in SDR and U.S. dollar conversions are provided (Table 7B total HIPC Initiative debt relief and MDRI debt relief: 3,353.5 reported in last rows — see table for conversion note).
- AfDB Group (Table 8A/B highlights):
  - AfDB Group totals for 21 post-completion-point HIPCs: Committed Assistance 2,033.5; Total Delivered Assistance 2,889.4; Committed Assistance in end-2008 NPV Terms 1,422.2; Delivered Assistance in end-2008 NPV Terms 3,084.2; Delivered Assistance in nominal terms 5,973.7; Combined under HIPC Initiative and MDRI in end-2008 NPV Terms 4,506.4.
  - AfDB Group debt service before and after HIPC and MDRI relief reported in detailed annual country series (Table 8B).

### Bilateral and Paris Club Creditor Delivery (selected aggregates)
- Status of bilateral donor pledges to the Debt Relief Trust Fund (Table 10): donor-level paid-in and pledged amounts listed; total bilateral contributions and EC-ACP contributions summarized in table (aggregate totals shown across columns in table).
- Paris Club creditors (Table 11 & Table 12 highlights):
  - Table 11 provides HIPC Initiative cost estimates to Paris Club official bilateral creditors by creditor country (In millions of U.S. dollars, end-2008 NPV terms) summed across 35 post-decision-point HIPCs; total across creditors reported as 20,914 (aggregate, last column total).
  - Table 12 reports Debt Relief Committed and Debt Relief Provided by the Paris Club (In millions of U.S. dollars, end-2008 NPV terms):
    - TOTAL for 26 Post-Completion-Point HIPCs: HIP C Initiative Assistance Committed 12,243.7; HIPC Initiative Assistance Provided 12,243.7; Debt Relief Beyond HIPC Initiative Provided 7,912.0; Total Debt Relief Provided 20,155.7 (165 percent of committed).
    - Country-level entries show full delivery for many (e.g., Benin 94.3 committed and 94.3 provided; Bolivia 606.7 committed and 606.7 provided; Mozambique 1,563.9 committed and 1,563.9 provided).
  - For 9 Interim HIPCs, Table 12 lists totals committed by Paris Club creditors (aggregate 8,670.5) but provides less information on delivered amounts.
- Paris Club bilateral initiatives and modalities (Table 13): creditor-by-creditor indication of provision of relief (flow vs stock, ODA vs Non-ODA, pre- and post-cutoff date rules) summarized; specific creditor practices (e.g., Australia, Canada, Denmark, France, Italy, Netherlands, United Kingdom, United States) listed in table notes.

### Non-Paris Club Official Bilateral Creditors — Commitments and Delivery
- Table 14 provides cost estimates to non-Paris Club official bilateral creditors by creditor country (In millions of U.S. dollars, end-2008 NPV terms) across 35 post-decision-point HIPCs — detailed creditor-by-country matrix; total non-Paris Club exposure across listed creditors reported as 4,888 (aggregate total in final column).
- Delivery status (Table 15 summary):
  - I. Full delivery of HIPC relief (10 creditors): aggregate delivered = 51.5 (In millions of U.S. dollars, NPV terms), percent delivered = 100.0 percent for each creditor listed (examples: Egypt 0.5; Hungary 21.3; Portugal 228.4; Republic of Korea 7.8; South Africa 6.9; Trinidad and Tobago 0.6).
  - II. Partial delivery (22 creditors): aggregate delivered = 2,718.6; percent of total assistance delivered varies (examples: Algeria delivered 15.0 percent of its estimated cost; Brazil delivered 76.6 percent; China delivered 61 percent of its estimated cost).
  - III. No delivery (18 creditors): aggregate = 1,402.8 (no delivery reported as of June 2009).
  - Grand Total across all non-Paris Club creditors: HIPC Initiative assistance costs 4,172.9 (total), HIPC Initiative assistance delivered 1,466 (percent delivered 35.0 percent).
  - Notes include creditor-specific caveats (e.g., India announced intention to write off non-export credit claims; Kuwait estimates based on detailed loan-by-loan data).

### Commercial Creditor Lawsuits (Table 16 summary)
- Survey of commercial creditor litigation against HIPCs as of June 2009 (responses from 25 countries):
  - Completion-Point HIPCs: reported ongoing or pending cases include claims such as Kintex-Bulgaria vs Ethiopia (ongoing; claim 8.7), ABSA Limited vs Zambia (ongoing; claim 95.0), Industrie Biscotti vs Sierra Leone (ongoing; claim 9.0), Iraq Fund for International Development vs Uganda (ongoing; claim 6.0/6.4).
  - Interim HIPCs: Democratic Republic of the Congo and Republic of Congo have multiple claims reported (e.g., FG Hemisphere, Frans Edward Prins Rootman, Groupe Antoine Tabet (GAT), Commisimpex) with amounts claimed and some judgments awarded (example: Frans Edward Prins Rootman judgment awarded 12.5; claim amounts listed).
  - Potentially Eligible HIPCs: Sudan reported claims with judgments awarded and ongoing cases (examples: Habib Bank Limited judgment awarded 101.9; Pomgrad Split judgment awarded 0.4).
- Table notes: reported claims exclude accumulated interest/penalties when possible; survey responses do not assess merits and may not be comprehensive.

*Source: Annex II. Country Coverage, Data Sources, and Assumptions for the HIPC Initiative and MDRI Costing Exercise (data and tables as of end-July 2009).*

---


_Source: https://www.imf.org/-/media/websites/imf/imported-full-text-pdf/external/np/pp/eng/2009/_091509.pdf_
