### Executive Summary — Completion Point Determination and Performance
- IDA and IMF staffs conclude Malawi has met requirements for reaching the completion point under the enhanced HIPC Initiative.
- Conditions met:
  - implemented its Poverty Reduction Strategy Paper (PRSP) satisfactorily for at least one year;
  - maintained satisfactory macroeconomic policies as evidenced by performance under a PRGF-supported program over fiscal year 2005/06 (July-June);
  - met all completion point targets in economic governance, public expenditure management, safety nets, and microfinance;
  - met all but two social sector completion point targets.
- Two social-sector triggers not met:
  - share of health expenditure reached at least 13 percent of discretionary recurrent budget (average 2001/02–2004/05 = 12 percent; preliminary actual 2005/06 = 18 percent);
  - at least 6,000 students enrolled annually for teacher training (yearly enrolment was 3,000 in 2000, 5,490 in 2005 achieved via crash course MIITEP but quality concerns; staff view target overly ambitious).
- Recommendation: grant waivers for the two non-observed triggers given broader strategy progress.

### Completion Point Debt Assessment — Outturn, Causes, and Topping‑up Recommendation
- Decision point (December 2000) estimate:
  - HIPC assistance required to reach 150 percent NPV debt-to-exports threshold: US$643 million (1999 NPV terms).
  - Equal burden-sharing common reduction factor: 43.7 percent.
  - IDA and IMF commitments: US$331 million and US$30 million (NPV terms).
- Interim relief delivered during interim period (as of August 2006):
  - IMF US$14.2 million (NPV terms);
  - IDA US$99.9 million (NPV terms);
  - total interim assistance ≈ $151 million (NPV terms).
- Completion point revisions and actual outturn:
  - Revised required HIPC assistance: US$646 million (1999 NPV terms).
  - Completion point actual NPV of debt-to-exports ratio at end-2005:
    - after full delivery of decision-point HIPC commitments: 245 percent of exports (NPV of external debt US$1.3 billion);
    - after additional voluntary bilateral debt relief: 229 percent of exports (NPV US$1.2 billion).
  - Decision point projection for end-2005: 169 percent of exports.
  - Actual NPV ratio exceeds decision point projection by 60 percentage points and exceeds HIPC threshold of 150 percent by nearly 80 percentage points.
- Causes of deterioration (staff attribution mainly to exogenous factors):
  - Lower-than-projected export receipts (about one third of higher NPV ratio): tobacco price fell by 13.6 percent (expected +20.4 percent).
  - Lower discount rates (about one half of increase): decline in CIRRs since decision point.
  - Unanticipated new borrowing increased NPV ratio by 3.8 percent.
  - Unanticipated increases in international oil prices and import prices (import prices rose 6.7 percent per year vs 0.7 percent expected) worsened terms of trade by about 20 percent over 2000–05.
  - Depreciation of US dollar against Euro and SDR was a relatively minor factor.
- Topping‑up under enhanced HIPC rules:
  - Staffs consider Malawi’s case meets criteria for topping-up.
  - Recommended additional topping-up assistance: US$411 million to bring NPV of debt-to-exports ratio from 229 percent at end-2005 to the 150 percent HIPC threshold.
  - Share of IDA’s and IMF’s assistance in total topping-up: 74 percent.

### MDRI Implications and Net Debt Service Savings
- Completion point qualification for MDRI relief from IDA, the IMF and the AfDF.
- MDRI debt relief (net of HIPC assistance) debt service savings:
  - US$1.9 billion without topping-up;
  - US$1.4 billion with topping-up.
- Examples of nominal and flow impacts:
  - Without topping-up:
    - IDA debt stock reduction: US$1.8 billion; average annual debt service savings net of HIPC assistance: US$27 million (2006–10) and US$41 million over next 38 years; total debt service savings US$1.5 billion (SDR 1.1 billion).
    - IMF debt stock reduction: SDR37.9 million; average SDR 3 million (US$4 million) over next 8 years; total SDR 22 million (US$32 million).
    - AfDF cancelation: US$382.9 million; annual debt service savings net of HIPC assistance: average US$27 million over next 5 years and US$8 million over next 45 years; total MDRI savings US$347 million nominal.
  - With topping-up:
    - IDA cancel US$1.8 billion (US$1.1 billion reduction due to MDRI); total debt service savings US$1.2 billion.
    - IMF MDRI relief SDR37.9 million composed of SDR14.5 million (MDRI‑I Trust), SDR15.4 million (completion point assistance to Malawi’s HIPC umbrella), SDR8 million (topping-up).
    - AfDF cancellation US$383 million (US$95 million corresponding to HIPC assistance); total US$253 million debt service savings over projection period.

### Debt Sustainability Outlook — Baseline Projections and Scenarios
- Baseline assumptions:
  - Average export growth assumed 6 percent (2006–20), versus 4.8 percent at decision point.
  - Real GDP growth projected approximately 6 percent over the near term, dropping to 4.5 percent longer term.
  - Net official assistance assumed to increase gradually by about 2 percent of GDP to about 23 percent of GDP by 2015.
  - Share of grants in gross aid inflows expected to rise from 78 percent to about 84 percent.
  - New borrowing assumed to decline from 5.8 percent of GDP (first half of decade) to 3.8 percent of GDP over projection period; new borrowing on concessional terms.
  - Fiscal policy assumed to target reduction of domestic debt to around 2 percent of GDP and wage bill to 8.5 percent of GDP.
- Baseline projections excluding topping-up:
  - NPV of debt-to-exports ratio: falls from 245 percent (end-2005) to 43 percent by end-2006, then rises to about 89 percent at end of projection period.
  - NPV of debt-to-GDP ratio: 11 percent at end-2006 rising to about 24 percent at end of projection period.
  - NPV of debt-to-revenue ratio: declines to 44 percent in 2006 and trends up above 102 percent near end of projection period.
  - Debt service after HIPC relief and MDRI: average US$17 million during 2006–15 (~2 percent of exports).
- Baseline projections including topping-up:
  - NPV of debt-to-exports ratio: drops to 32 percent at end-2006; rises to 103 percent at end of projection period.
  - NPV of debt-to-GDP ratio: 8 percent at end-2006; rises above 28 percent by end of projection period.
  - NPV of debt-to-revenue ratio: 33 percent in 2006; averages about 108 percent over 2016–25.
  - Debt service after HIPC + topping-up + MDRI: average US$16 million during 2006–15 (~2 percent of exports).
- Sensitivity and stress scenarios (selected outcomes):
  - Scenario I (less concessional borrowing, grant element 45 percent): debt remains below HIPC threshold but NPV of debt-to-exports rises above 117 percent by end period; debt service above 7 percent of exports.
  - Scenario II (higher borrowing and lower exports): NPV of debt-to-exports breaches HIPC threshold by 2019, reaching 196 percent by end of projection period; debt service-to-export ratio 5 percent by 2025.
  - Scenario III (droughts every 5 years): debt-burden indicators closely mimic baseline thanks to donor grant support; NPV of debt-to-exports remains below HIPC threshold.
  - Scenario IV (aid scaling-up financed largely by loans; new borrowing 6.8 percent of GDP): despite higher growth, NPV of debt-to-exports breaches HIPC threshold before end of projection period — underscores need for grant financing.

### Macroeconomic Framework Underpinning DSA — Key Projections and Indicators
- Growth and inflation:
  - Projected real GDP growth near term ≈ 6 percent; long-term 4.5 percent; historical ten-year average = 2.8 percent.
  - Inflation expected to fall and remain in single digits.
- Aid, reserves, and external balance:
  - Net official assistance to rise to about 23 percent of GDP by 2015.
  - Gross official reserves assumed to increase steadily to 5 months of imports over longer term.
- Selected numeric projections (selected series and exact values preserved from source):
  - Real GDP growth (sequence): 6.1; 7.1; 2.8; 8.4; 5.6; 6.0; 6.0; 5.5; 5.0; 4.5; 4.5; 4.5; 4.5; 4.5; 4.5; 5.5; 4.5
  - Nominal GDP (billions of kwacha) (selected): 2003: 172; 2004: 207; 2005: 246; 2006: 304; 2007: 345; 2008: 393; 2009: 447; 2010: 506; 2015: 901; 2025: 2832; Average 2006-15: 563; Average 2016-25: 1766
  - Exports of goods and services, US$m (selected): 481; 511; 566; 614; 636; 657; 678; 738; 799; 862; 929; 1001; 1079; 1571; 2287; Average 2006-15: 799.4; Average 2016-25: 1669.5
  - Usable gross official reserves (US$m) (selected): 116; 119; 131; 114; 207; 299; 362; 399; 437; 482; 531; 586; 644; 1034; 1637; Average 2006-15: 406; Average 2016-25: 1117

### Public Finance, Governance, and Structural Reforms — Findings and Actions
- Public finance legal and institutional reforms:
  - Finance and Audit Act split into Public Finance Management Act (PFMA) and Public Audit Act (PAA) in 2003.
  - IFMIS revised (May 2005) and rolled out starting November 2005; electronic IFMIS in eight ministries covering over 40 percent of budget; plan to roll out to all ministries within two years; closure of some 1,550 bank accounts.
  - Quarterly Expenditure Reports (QERs) submitted within six weeks; PPEs posted on internet within twelve weeks and published in press quarterly.
- Public expenditure management improvements:
  - Budget credibility improved; arrears clearance policy approved 2005 and backlog being cleared.
  - Office of the Director of Public Procurement (ODPP) operational since 2004 under Public Procurement Act of 2003.
  - Financial reporting and auditing lags reduced: financial statements lag reduced from 14 months to 6 months; audited accounts lag reduced from 2–3 years to 9 months.
- Anti‑corruption and governance measures:
  - Corruption Perceptions Index (TICPI) 2005: 2.8 out of 10 (better than African LIC average 2.5).
  - Corrupt Practices Act amended 2004; Public Procurement Act passed 2003; ACB investigations and prosecutions of high-profile cases; US$20.9 million Millennium Challenge Corporation Threshold Country Plan approved September 2005.
- Social sector actions and outcomes:
  - Education: free primary education enrolment rose from 1.9 million to 3.2 million; pupils per qualified teacher declined from 123 (2000) to 83 (2005); sector’s share of discretionary recurrent budget averaged 29 percent (2001/02–2004/05) and based on approved 2005/06 budget dropped to 21 percent.
  - Teacher training: annual enrolment 3,000 in 2000, 5,490 in 2005 (crash course), reversion to 3,000 thereafter; IPTE “one-plus-one” introduced Sept. 2005 (deploys 6,000 teachers every two years); TTC expansions: five colleges expansion complete March 2008 increasing enrolment to 3,810; new 500 capacity college in Liwonde operational 2009 increasing total enrolment to 4,310.
  - Health: SWAp signed 2004; annual training over 300 nurse technicians, over 60 medical assistants and 20 radiography technicians; average drugs and medical supplies budget US$1.36 per capita (BHA standard US$1.25 per capita); CMS reforms underway with management contractor engaged.
  - HIV/AIDS: NAC operational and autonomous; condom availability >75 percent in outlets; testing kits increased from 1,500 (2001) to 4,000 (2005); Behavior Change Communication Strategy developed 2003; Syndromic Management of STIs routine in central/district/major CHAM hospitals.
- Safety nets and microfinance:
  - Universal starter-pack transformed into Targeted Input Program (TIP) 2000/01 and evolved into fertilizer price subsidy targeting 1.7–2.0 million households.
  - Microfinance clients increased 79 percent (257,276 in 2000 → 459,906 by December 2005); Reserve Bank of Malawi established microfinance monitoring system in 2003.
- Use of HIPC interim assistance:
  - Protected Pro-poor Expenditures (PPEs) ring-fenced; total PPEs FY2001/02–FY2004/05 = 405.08 million US$ (selected line items provided); Total HIPC Debt Relief by year: 2001/02: 30.7; 2002/03: 40.2; 2003/04: 50.9; 2004/05: 46.9; Total HIPC Debt Relief: 168.7 (US$ million).

### Policy Implications and Staff Recommendations
- Staff recommendations to Executive Directors:
  - Approve that Malawi has reached the completion point under the enhanced HIPC Initiative.
  - Approve topping-up of US$411 million under the enhanced HIPC Initiative.
  - Grant waivers for the two non-observed completion point triggers related to health sector share and teacher training, given broader progress.
- Policy imperatives post‑completion point:
  - Strengthen debt management to ensure new borrowing is on adequately concessional terms.
  - Make prudent use of resources freed by debt relief and strengthen public expenditure management.
  - Continue governance and structural reforms to sustain strong economic growth, export diversification, and poverty reduction.
  - Recognize and address constraints on scaling up aid: government absorption capacity and composition of aid (grants vs loans) critically affect debt sustainability.
  - Prioritize measures to insulate economy from periodic droughts and commodity price shocks, especially tobacco price volatility.

_italic: IMF/IDA staff assessment as presented in the supplied document excerpts (source: _cr06420)._

### Executive Summary ......................................................................................................

### Executive Summary

### Overview
- The staffs of the International Development Association (IDA) and the International Monetary Fund (IMF) conclude that Malawi has met the requirements for reaching the completion point under the enhanced Heavily Indebted Poor Countries (HIPC) Initiative.
- Malawi has:
  - implemented its Poverty Reduction Strategy Paper (PRSP) satisfactorily for at least one year;
  - maintained satisfactory macroeconomic policies as evidenced by performance under a PRGF-supported program over fiscal year 2005/06 (July-June);
  - met all completion point targets in economic governance, public expenditure management, safety nets, and microfinance;
  - met all but two social sector completion point targets.

### Completion point compliance — social sector triggers not met and waiver request
- Two completion point triggers were not met:
  - ensure share of health expenditure reached at least 13 percent of discretionary recurrent budget;
  - ensure at least 6,000 students enrolled annually for teacher training.
- Progress and context:
  - Average health expenditure share between 2001/02 and 2004/05 was 12 percent.
  - Preliminary actual figures show health sector’s share of discretionary recurrent spending for 2005/06 increased to 18 percent.
  - An attempt to increase teacher training enrolment through a crash course raised numbers but resulted in deterioration of teacher quality. A new program and donor-supported construction of Teacher Training Colleges (TTCs) have been introduced to increase properly trained teacher deployment, but the 6,000 annual enrolment target is unlikely to be met in the near future and staffs consider the target overly ambitious.
- Recommendation:
  - Waivers are recommended for the non-observance of the two triggers given broader strategy progress to raise education quality and improve health outcomes.

### PRSP and macroeconomic framework
- The Malawi Poverty Reduction Strategy Paper (MPRSP) was prepared and adopted in April 2002; implementation performance improved over time, with the third Annual Progress Report covering July 2004–June 2005 showing broadly satisfactory implementation.
- The Malawi Growth and Development Strategy (MGDS) is being finalized as a second-generation strategy with greater emphasis on growth as a basis for poverty reduction.
- Macroeconomic stability maintained since mid-2004 under an IMF SMP and then under a PRGF-supported program; a new three-year PRGF was approved on August 5, 2005. The first review (through end-September 2005) was satisfactory; the second review (through end-December 2005) is discussed concurrently with the document.

### HIPC decision point commitments and interim assistance
- At the December 2000 decision point, HIPC assistance required to lower Malawi’s NPV of debt-to-exports ratio to the 150 percent HIPC threshold was estimated at US$643 million in 1999 NPV terms.
- Under equal burden sharing, creditors were to apply a common reduction factor of 43.7 percent after traditional mechanisms. IDA and IMF commitments were US$331 million and US$30 million in NPV terms, respectively.
- Interim relief delivered during the interim period: IMF US$14.2 million and IDA US$99.9 million in NPV terms as of August 2006. Total interim assistance to Malawi was about $151 million in NPV terms.

### Completion point debt assessment and upward revision of assistance
- Completion point analysis revised required HIPC assistance to US$646 million in 1999 NPV terms (from the earlier US$643 million), reflecting creditor information and a downward revision in exports.
- Actual external debt burden indicators at completion point worsened substantially relative to decision point projections:
  - At decision point, projected NPV of debt-to-exports ratio at end-2005 was 169 percent assuming full delivery of decision-point HIPC commitments.
  - Completion point actual outturn: 245 percent of exports.
  - After additional voluntary bilateral debt relief, ratio declines to 229 percent of exports.

### Causes of deterioration in debt indicators (attributed to exogenous factors)
- Lower-than-projected export receipts explain about one third of the higher NPV of debt-to-exports ratio; price of Malawi’s main export commodity, tobacco, fell by 13.6 percent due to declining demand in international markets.
- A lower discount rate explains about one half of the unanticipated increase in Malawi’s NPV of debt-to-exports ratio; international interest rates declined since the decision point while nominal debt service burden remained broadly unchanged because interest rates on external debt are mostly fixed.
- Depreciation of the US dollar against the Euro and SDR was a relatively minor factor.
- Unanticipated new borrowing increased Malawi’s NPV of debt-to-exports ratio by 3.8 percent.
- Unanticipated increases in international oil prices since the decision point also contributed to deterioration in debt servicing capacity.

### Topping-up under the enhanced HIPC Initiative
- Under enhanced HIPC rules, when exogenous factors significantly deteriorate debt ratios after the decision point, topping-up of HIPC assistance at completion point is allowed.
- Staffs consider Malawi’s case meets the criteria for topping-up.
- Recommended additional assistance (topping-up): US$411 million to bring Malawi’s NPV of debt-to-exports ratio from 229 percent at end-2005 to the 150 percent HIPC threshold after bilateral debt relief beyond HIPC assistance.

### MDRI implications and net debt service savings
- Reaching completion point qualifies Malawi for additional debt cancellation under the Multilateral Debt Relief Initiative (MDRI).
- MDRI debt relief (net of HIPC assistance) would yield debt service savings on debt owed to IDA, the IMF and the African Development Fund (AfDF) of:
  - US$1.9 billion without topping-up; and
  - US$1.4 billion if topping-up were approved.
- The amount of MDRI relief depends on Executive Directors’ approval of topping-up.

### Debt sustainability outlook after HIPC, topping-up, and MDRI
- After HIPC debt relief, topping-up, and MDRI debt relief, Malawi’s external debt burden indicators fall to levels significantly lower than the average of low-income countries.
- Long-term projection:
  - NPV of debt-to-exports ratio expected to increase gradually over time but remain below the HIPC threshold of 150 percent.
  - This projection is conditional on government maintaining prudent fiscal policies, implementing measures to insulate the economy from periodic droughts, and keeping new borrowing modest and on concessional terms.

### Staff recommendation
- The staffs of IDA and the IMF recommend that the Executive Directors:
  - approve that Malawi has reached the completion point under the enhanced HIPC Initiative;
  - approve that Malawi be considered for topping-up under the enhanced HIPC Initiative (additional assistance of US$411 million recommended);
  - grant waivers for the two non-observed completion point triggers relating to the share of health sector expenditure and teacher training, based on broader strategy progress.

*Source: IMF/IDA staff assessment as presented in the Executive Summary of the Malawi completion point document.*

### Box 1: Summary Assessment of Malawi’s Progress in Implementing the Completion Point Triggers (continued)

### _cr06420 - Box 1: Summary Assessment of Malawi’s Progress in Implementing the Completion Point Triggers (continued)

### Raising the Quality of Education (continued)
- Pre-packaging of donor-supplied primary textbooks for each school and direct supply from the supplier to the schools.
  - Implemented. Since 2002, donor-supplied primary textbooks are pre-packed and directly supplied to schools.
- Yearly enrolment of 6,000 students for teacher training and institution of in-service training for primary teachers (at least once each year).
  - Not implemented.
    - (a) Yearly enrolment was 3,000 in 2000. It has not been possible to increase yearly enrolment with the existing number of Teacher Training Colleges (TTCs), and the government has been unable to allocate resources for the construction of additional training institutions. Earlier attempts to increase enrolment through a crash course were not successful. Government has now put in place other measures to increase enrolment.
    - (b) In-service training for primary teachers was institutionalized in 2001 in the form of a continuous professional development program following the phasing out of the Malawi Schools Support Program (MSSP).

### Improving Health Outcomes
- Recruitment, training and deployment of at least 200 nurse technicians, 50 new medical assistants and 20 radiography technicians per annum.
  - Implemented. Over the implementation period, the sector has on an annual basis been training over 300 nurse technicians, over 60 medical assistants and 20 radiography technicians.
- Completion of ‘phase one’ reforms of the Central Medical Stores (CMS) and a budget for drugs and medical supplies in line with Better Health for Africa (BHA) standard (US$1.25 per capita).
  - Implemented.
    - (a) Sufficient progress on phase one reforms of the CMS, including reviewing the essential drugs list and actions towards transforming the CMS into an autonomous body.
    - (b) The average budget for drugs and medical supplies over the period is US$1.36 per capita which is above the BHA standard.
- Share of health expenditure of at least 13 percent of discretionary recurrent budget.
  - Not Implemented. The sector’s share of discretionary recurrent budget has on average been 12 percent for the period 2001/02 and 2004/05, below the required threshold of 13 percent.
    - However, implementation of the health SWAp has resulted in the share for 2005/06 rising to 18 percent, based on preliminary actual expenditure figures as of July 2006.

### Fighting HIV/AIDS
- Fully staffed, functional and autonomous National AIDS Control Secretariat.
  - Implemented. National AIDS Commission (NAC) and its secretariat was set up in July 2001 as an autonomous body run and managed by a board of trustees. The secretariat is also fully staffed.
- 75 percent of all condom outlet points with condoms in stock at any given time.
  - Implemented. There is over 75 percent of condom availability in the groceries, shops, and entertainment clubs, verified through NAC’s monitoring system.
- Continuous availability of testing kits at all blood transfusion sites by increasing blood testing kits (each allowing 100 tests to be done) from 1,500 to 2,500.
  - Implemented. The number of blood testing kits increased from 1,500 in 2001 to 4,000 in 2005.
- Implementation of an effective Behavior Change Communication Strategy.
  - Implemented. The Behavior Change Interventions (BCI) Strategy was developed in 2003 and is the guiding framework for all HIV/AIDS behavior change interventions in Malawi.
- Syndromic Management of sexually transmitted infections (STI) in all Central, District and major CHAM hospitals.
  - Implemented. All central hospitals, district hospitals, major CHAM hospitals and in some districts even health centers are using Syndromic Management of STIs.

### Improving Access to Land and Credit
- Submission of draft Land Law to parliament.
  - Implemented: A draft Land Law was submitted to parliament on the June 13, 2006.
- Approval by cabinet of the ‘Micro-finance Policy.’
  - Implemented. cabinet approved the policy in October 2002.
- Increase number of micro-finance clients by 20 percent.
  - Implemented. Statistics covering 20 microfinance institutions and initiatives show an increase of 79 percent in the number of clients between 2000 and December 2005.
- Establishment of a monitoring system covering all micro-finance institutions.
  - Implemented. The Reserve Bank of Malawi established a monitoring system covering all microfinance institutions in 2003 under the SADC microfinance observatory initiative.

### Creating an Effective Safety Net System
- Transform universal starter-pack distribution into a Targeted Input Program (TIP) for 2001/02.
  - Implemented. The universal starter-pack was transformed into a TIP in the year 2000/01 reducing the number of farmers targeted from 2.86 million to 1.5 million. The program has now been changed to operate as a fertilizer price subsidy program, targeting 2 million households.
- Rationalization and prioritization of existing and new programs, under the National Safety Net Strategy (NSNS).
  - Implemented. The government has made attempts to rationalize and prioritize the various donor-managed safety nets interventions, although co-ordination remains a challenge. Government is now in the process of developing a social protection policy to help improve coordination.
- Establishment of a monitoring and evaluation (M&E) system of the National Safety Net Strategy.
  - Implemented. An M&E system has been set up in the National Safety Nets Unit (NSU).

### Malawi Growth and Development Strategy (MGDS) — Enhancing Growth
- MGDS strategic themes (five):
  - (i) achieving sustainable economic growth and economic empowerment,
  - (ii) protection of the most vulnerable and enabling them to contribute to the economy,
  - (iii) creating a healthy educated and well nourished productive population,
  - (iv) infrastructure development as a pre-requisite for achieving the objectives of economic growth and social development,
  - (v) good governance including sound economic environment, high quality service delivery, effective institutions and rule of law, an efficient and effective public sector, and reduction in corruption.
- Medium-term focus:
  - Growth driven by agriculturally-based core sectors: tea, tobacco and sugar; further integration of these sectors and smallholders into agro-processing; irrigation; large scale farming; infrastructure expansion; rationalizing fees and tax policy toward cash crops; eliminating food insecurities.
  - Improve access to financing (micro-finance schemes) and secure land registration to enable private-sector led growth.
- Long-term/medium-term sector priorities:
  - Tourism: improve infrastructure and communication, enforce regulatory framework for quality, standard and land access.
  - Mining: improve technology and infrastructure, create market outlet, review tax policy.
  - Garment/cotton: increase local content, develop local textile industry geared toward exports, negotiate trade opportunities.
  - Manufacturing: improve quality and productivity through training, better infrastructure, investment incentives and build capacity to evaluate own standards.

### Malawi Poverty Reduction Strategy (MPRS) implementation and successor strategy
- MPRS adopted in April 2002 covering 2002/03 – 2004/05; four strategic pillars:
  - (i) sustainable pro-poor growth; (ii) human capital development; (iii) improving the quality of life of the most vulnerable; (iv) good governance and cross cutting issues.
- Monitoring and evaluation arrangements:
  - An MPRS monitoring committee and a broad-based Technical Working Committee (TWC) were established. Three annual progress reports (APRs) and one comprehensive review report covering three years were produced and published.
- APRs and Joint Staff Advisory Notes (JSANs):
  - First APR (July 2002 – June 2003) and JSA submitted October 2003: implementation limited; poor performance maintaining macroeconomic stability.
  - Second APR (July 2003 – June 2004) and JSAN submitted June 2005: MPRS implementation still limited.
  - Third APR (July 2004 – December 2005): staffs consider implementation broadly satisfactory; progress in agriculture, education, health, public expenditure management, public sector reform, and corruption prevention. IDA and IMF staffs conclude trigger on satisfactory implementation of the MPRS for at least one year has been fully met.
- Successor strategy (MGDS):
  - Prepared using lessons from PVA and comprehensive review of MPRS; covers 2006/07 – 2010/11; includes explicit results framework.
  - Discussed at cabinet on May 30, 2006; cabinet adopted the strategy in principle, subject to finalization of a human resource and capital needs assessment. Government intends to formally adopt the strategy soon.
- Stakeholder participation:
  - Participation in monitoring and in preparation of successor strategy and the budget process has improved over time, with greater involvement of civil society, private sector, and members of parliament.

### Macroeconomic Performance during 2001-05
- Stability since mid-2004 under an IMF SMP and PRGF-supported program; all quantitative targets under these programs met since mid-2004; domestic debt started to decline; inflation projected to decline to single digits once recovery from drought-induced food crisis is complete.
- Decision point December 2000 coincided with approval of new PRGF arrangement; policy implementation poor and arrangement expired June 2004 with only first review completed.
- Fiscal slippages in 2000/01 and 2001/02 due to bailouts of public enterprises, sharp increase in interest rates, overruns on the wage bill, overspending on other current expenditures.
- 2002 food crisis added some 4½ percent of GDP to fiscal expenditures and halved external reserves.
- By end-2003/04, domestic debt approached 25 percent of GDP and domestic interest payments absorbed one quarter of the budget.
- Performance improved after new government in mid-2004:
  - Domestic debt estimated to have declined to below 20 percent of GDP by end-2005/06.
  - Underlying balance tightened since 2003/04 by 1½ percent of GDP.
  - Net cost to the budget of food security operations was 1.7 percent of GDP.
  - Exchange rate management was weak in 2005, pegged exchange rate led to accumulation of private external payment arrears; exchange rate allowed to depreciate in early 2006 and backlog cleared end-July 2006.
- Outlook and program projections:
  - Strong crop expected to sustain rebound in real GDP growth to 7 percent in 2006/07 and support deceleration in inflation to single digits.
  - Government committed to further reduce domestic debt to about 16 percent of GDP.
- Staff conclusion: Malawi met the trigger on maintenance of macroeconomic stability and satisfactory implementation of the PRGF program.

### Performance under IMF Programs, 2001-05
- PRGF-supported program, 2001/02-2003/04:
  - Approved December 2000 to restore stability and reduce inflation from over 30 percent in 2000 to 10 percent in 2001 and to single digits thereafter.
  - Inflation reduced but not as much as envisaged; achieved at expense of credit to private sector and by depleting official external reserves.
  - Domestic financing increased to over 7 percent of GDP in each of the first two years; in 2002/03 domestic financing rose to over 12 percent of GDP and domestic debt to about 25 percent of GDP by end-2003/04.
  - Poor program implementation delayed first review to late 2003; arrangement expired in late 2004.
- Staff Monitored Program, 2004/05:
  - Aimed to maintain real GDP growth around 4 percent and reduce core (non-food) inflation to about 11 percent.
  - Inflation target met; output growth weaker due to drought reducing agricultural production in 2005.
  - Fiscal cornerstone: curtail domestic borrowing to reduce stock of domestic debt by 2 percent of GDP via higher donor support and domestic fiscal effort to improve underlying balance by 2 percent of GDP.
  - Virtually all quantitative targets, including for domestic financing, were met.
  - Implemented major civil service wage reform in October 2004 under Bank’s FIMAG credit.
- PRGF-supported program, 2005/06:
  - Approved August 2005. 2005/06 program objectives for real GDP growth and inflation were met.
  - Fiscal cornerstone: repayment of domestic debt to reduce stock to below 20 percent of GDP; program also provided spending on maize and fertilizer on account of emerging food crisis.
  - Structural measures included strengthening public expenditure management and financial sector management, ceiling on civil service wage bill, and revision of civil service pension formula to offset sharp increase in benefits from 2004 wage reforms.
  - Malawi met all end-September 2005 performance criteria for first program review; IMF Board approved review in February 2006.
  - Performance marred by weak exchange system management and use of informal administrative restrictions, leading to unpaid import invoices backlog.
  - Revised program incorporated additional food security spending with significant donor support.
  - IMF staff determined Malawi met all end-December 2005 quantitative performance criteria for second program review.
  - Government allowed the Kwacha to depreciate since early 2006 and eliminated the stock of unpaid import invoices.
  - Prospects for end-June 2006 targets are favorable.

### Implementation of Structural Triggers
- (Section header present; no additional specific trigger assessments included in the supplied content.)

*Source: _cr06420 - Box 1: Summary Assessment of Malawi’s Progress in Implementing the Completion Point Triggers (continued)*

### 19. Malawi has taken significant steps that will go a long way to ensuring that public

### _cr06420 - 19. Malawi has taken significant steps that will go a long way to ensuring that public

### Strengthening the legal framework for public finances
- In 2003, the Finance and Audit Act was separated into two Acts: the Public Finance Management Act (PFMA) and the Public Audit Act (PAA).
- The PFMA shifts emphasis from a narrow focus on public money to a broader notion of the economic, fiscal and financial management of public finances.
- The two Acts were designed to update public finance and public audit laws to meet Malawi’s present and future requirements and to introduce provisions reflecting modern trends and international best practice.

### Transparency and reporting of public resources
- The Government of Malawi reports expenditures to the public on a quarterly basis.
- Quarterly Expenditure Reports (QERs) are submitted to the Cabinet Committee on the Economy and the Budget and Finance Committee of parliament within six weeks of the end of the quarter.
- The government posts budgeted and actual protected pro-poor expenditures (PPEs) on its internet website within twelve weeks of the end of the quarter.
- PPE reports are published in the press on a quarterly basis.
- PPEs represent expenditure items fully committed by the government to be financed even when there is a cash flow problem.

### IFMIS rollout and payment system centralization
- IFMIS was dramatically altered in May 2005 to adopt the IFMIS framework implemented in Tanzania, including revision of the chart of accounts, centralization of government banking and the government payment system.
- A World Bank review in late 2005 certified the robustness of the system.
- The government decided on a full roll out instead of piloting; rollout commenced in November 2005.
- The system runs on two platforms: an electronic system and a manual one.
- The electronic system is being used in eight ministries: Finance, Health, Agriculture, Education, Office of the President and cabinet, the Malawi Defense Force, the Malawi Police Service, and State House, which account for over 40 percent of the budget.
- In January 2006, the electronic system was extended to four other spending agencies.
- There is an action plan to roll-out the electronic system in all the ministries within a two year period.
- Centralization of the government payment system led to the closure of some 1,550 bank accounts that were susceptible to abuse.

### Improving Malawi’s public expenditure management (Box 4 — findings and reforms)
- Budget formulation improvements:
  - Donor support coverage widened as recommended by the HIPC Assessment and Action Plan (AAP), improving budget comprehensiveness.
  - The formulation process is more participatory; civil society and the private sector representations are taken into account.
  - More time is allowed for budget scrutiny; amendments are made to the draft budget to reflect stakeholder comments.
  - Government is working (with donor assistance) on simplification of budget documents.
- Budget execution improvements:
  - Budget credibility improved by broadly remaining within the appropriated budget for the first time in over ten years.
  - Reforms undertaken include:
    - A policy for clearing arrears and preventing their recurrence approved by cabinet in 2005; implementation has started and backlog arrears are being cleared.
    - The Office of the Director of Public Procurement (ODPP) became operational in 2004 under the Public Procurement Act passed in 2003; the Act conforms to international standards.
    - Introduction of IFMIS in November 2005.
    - Centralization of the government payment system and tightening of internal controls have led to improved alignment of expenditures to the approved budget and reduction in the build up of arrears; timely production of expenditure reports.
    - Work on a new Human Resource Management Information System (HRMIS) to ensure effective management of the wage bill through improved payroll records.
- Financial reporting and auditing time-lags reduced:
  - Lag between end of fiscal year and production of financial statements reduced from some 14 months at decision point to 6 months; Malawi is on course to meet the benchmark of four months.
  - Time lag between end of fiscal year and presentation of audited accounts and report to the legislature reduced from 2-3 years to 9 months.
  - With IFMIS rolling out, time to fully evaluate budget implementation is expected to be reduced further.

### Malawi’s fight against corruption (Box 5 — measures and results)
- Context and perception:
  - Transparency International’s Corruption Perceptions Index (TICPI) in 2005 was 2.8 out of 10.
  - This score is better than the average for other Low Income Countries in Africa (2.5).
  - Since 2004 the new government of President Mutharika adopted a zero tolerance policy on corruption.
- Specific legal and institutional measures:
  - In 2004, the government amended the Corrupt Practices Act of 1995 to widen the definition of corruption, criminalize abuse of office and possession of unexplained wealth by public officers, and provide protection of whistle blowers.
  - Public Procurement Act passed in 2003 created the Office of the Director of Public Procurement (ODPP); ODPP became operational in 2004.
  - In 2005, the government adopted a new public payment system as part of IFMIS, leading to the closure of some 1,550 bank accounts susceptible to abuse.
  - A governance and corruption baseline survey was conducted by the ACB to identify departments with rampant corruption; ACB is developing an action plan.
  - With assistance from Norway since 2002, the capacity of the National Audit Office has been strengthened.
  - In September 2005, a US$20.9 million Threshold Country Plan was approved by the Millennium Challenge Corporation to help Malawi fight corruption and improve fiscal management; the Plan aims to reduce by 75 percent the time it takes to process corruption cases, professionalize public procurement, build capacity in government auditing functions, and strengthen independent media coverage.
  - Malawi signed an agreement with the World Bank Institute for support in the fight against corruption.
- Results and high-profile actions:
  - Over the past two years, the Anti-Corruption Bureau (ACB) launched several investigations of high profile persons in government and the opposition, leading to arrests and convictions; some cases remain in the courts.
  - Notable pursued cases include the former Minister of Education, Mayor of City of Blantyre, and the Secretary to the Treasury. The Minister of Education and the Mayor of City of Blantyre were convicted for theft; the Secretary to the Treasury case is still in court.
  - Corruption charges have been filed against the former President; his recent arrest led to suspension and subsequent resignation of the Director of the ACB on grounds of alleged political motivation. The government stated charges against the former President have not been dropped and prosecution will resume as soon as a new Director of the ACB is appointed in the coming weeks.

### Raising the quality of education — key outcomes and actions
- Enrollment and pressures:
  - Free primary education introduced in 1994 saw enrollment increase from 1.9 million to 3.2 million, putting huge strain on the sector.
- Intermediate indicators improving:
  - Ratio of pupils per qualified teacher declined from 123 in 2000 to 83 in 2005.
  - Number of pupils per permanent classroom declined from 114 in 2000 to 99 in 2005.
- Sector budget shares:
  - The sector’s share of discretionary recurrent budget averaged 29 percent for the period 2001/02 to 2004/05 (above the HIPC threshold of 23 percent).
  - Based on the approved budget for 2005/06, the share dropped to 21 percent due to budgeting for drought relief and recovery programs (maize purchase and an expanded fertilizer subsidy program).
- Teaching and boarding finance:
  - Resources allocated to teaching and learning materials increased in real terms.
  - Subsidy to boarding secondary schools has not substantially decreased; fees charged per student are not high enough to cover boarding expenses, indicating partial central government subsidy persists.
  - On balance, the trigger related to reallocation from boarding to teaching materials was satisfactorily implemented.
- Textbook distribution:
  - Since 2002, donor-supplied primary textbooks are pre-packed and directly distributed from the supplier to schools; the ministry of education provides enrolment figures per school and per district.
- Teacher training and deployment:
  - Government did not sustain yearly enrollment of 6,000 students for teacher training. Yearly enrollment was 3,000 in 2000 and climbed to 5,490 in 2005 (nearly meeting the target). The 2005 figure was achieved because two cohorts were enrolled in one year under the crash course (MIITEP), which has now been discontinued due to quality concerns. Annual enrollment reverted to 3,000.
  - New approaches:
    - Initial Primary Teacher Education (IPTE) or one-plus-one program introduced in September 2005: one year in college and one year teaching practice. Under this system, teachers deployed every two years will be 6,000 (twice the number under the old two-year residential training program).
    - Expansion of TTC places with donor support: GTZ financing expansion of five TTCs; construction of a new 500 capacity college in Liwonde funded by IDA. Once expansion of five colleges is complete in March 2008, enrolment will increase from 3,000 to 3,810. The new 500 capacity college in Liwonde will become operational in 2009, after which total enrolment will increase to 4,310.
    - Given these efforts, staff believe the original target of 6000 was overly ambitious.
  - In-service training:
    - Institutionalized in 2001 as a continuous professional development program after phasing out the Malawi Schools Support Program (MSSP) funded by UK DfID.
    - Department of Teacher Education and Development (DTED) identifies needs; Malawi Institute of Education (MIE) implements training.
    - Most in-service training delivered at 315 Teacher Development Centers; some at MIE.

### Improving health outcomes — staffing, drugs, and institutional reforms
- Commitment and financing:
  - A SWAp agreement was signed in 2004 to provide the basis for scaling up resources allocated to the health sector; consultations began in 2002.
  - Government increased front line staff, drugs, and other basic medical supplies.
  - Reforms underway to improve efficiency of drug procurement and distribution.
- Human resources achievements:
  - Since the decision point, Malawi has trained and deployed over 300 nurse technicians, over 60 medical assistants and 20 radiography technicians. Thresholds for these cadres were 200, 50 and 20, respectively.
  - A human resources emergency program, supported by development partners, was set up.
  - With support from UK DfID, the government embarked on a program of topping-up salaries for health workers to retain them in the public sector.
- Drugs and Central Medical Stores (CMS):
  - Over the period 2001/02 and 2005/06, the average budget for drugs and medical supplies has been US1.36 per capita, above the BHA threshold of US$1.25 per capita.
  - Reforms undertaken:
    - Essential drugs list reviewed in 2001 when the government defined the Essential Health Package.
    - An information system to monitor compliance with agreed policies and financial allocations was developed with support from UK’s DfID.
    - Preparations began to transform the CMS into an autonomous body (a trust), but strategy changed: a management contractor was engaged to run the CMS for two years to review options, recommend the best option, and implement the adopted approach.
  - The CMS is currently operating with a very high level of autonomy under an independent management team while the new strategy is designed.

*Source: _cr06420 - 19. Malawi has taken significant steps that will go a long way to ensuring that public*

### 33. The health share of discretionary recurrent budget has been below the 13

### _cr06420 - 33. The health share of discretionary recurrent budget has been below the 13

### Health sector budget allocation and SWAp financing
- The health share of discretionary recurrent budget averaged 12 percent during the period 2001/02 and 2004/05, below the 13 percent threshold committed at the decision point. This trigger was therefore not met.
- Government strategy: prepare a six-year program of work outlining health sector priorities to be financed through a SWAp; increase health sector spending once SWAp arrangements were in place.
- 2005/06 approved allocation to health increased to 18 percent of the discretionary recurrent budget.
- Preliminary actual expenditures for FY2005/06, available as of July 2006, show health sector expenditures were 18 percent of the discretionary recurrent budget.
- Final actual expenditures will be available end of September 2006.

### Fighting HIV/AIDS — institutional strengthening and prevention measures
- Context:
  - Malawi’s HIV prevalence rate for the working age population (15-49 years) at the decision point was 16 percent.
  - Five triggers aimed to strengthen the institutional framework for fighting HIV/AIDS, scale up prevention, and mitigate impact.
  - Donor support: specialized HIV/AIDS SWAp and the Global Fund.
  - Monitoring report indicates HIV infection rates have stabilized in the past two years (as of report).
- National AIDS Commission (NAC):
  - NAC Trust Deed revised to make NAC operationally more autonomous; secretariat is fully staffed.
  - 2005 Trust Deed revision provided for a more broad-based board of trustees (government, private sector, faith community, NGOs, and civil society).
  - Secretariat is operationally independent of government and has its own procurement manual.
  - Government plans to establish NAC under an Act of Parliament to strengthen legal status.
- Prevention and testing:
  - NAC certifies over 75 percent condom availability in various retail outlets (groceries, shops, and night clubs); main suppliers: Population Services International (PSI) and Banja la Mtsogolo.
  - 70 percent availability of condoms in public hospitals and some private hospitals, supplied free of charge to clients.
  - Number of testing kits increased from about 1,500 at decision point to 4,000 in 2005.
    - Each kit allows 100 tests; with 4,000 kits, 400,000 tests can be conducted.
- Behavior Change Communication (BCC):
  - BCC Strategy developed in 2003 and implemented.
  - Condom usage among men increased from 28.7 percent in 2003 to 30.1 percent in 2004 (2005 HIV/AIDS monitoring and evaluation report).
- Syndromic management of STDs:
  - Routine practice in all central hospitals, district hospitals and major CHAM hospitals; extended to some health centers.
  - In 2004-05, 276,666 cases were managed in government, CHAM and BLM facilities.
  - NAC and stakeholders monitor training of staff on STD management quarterly.

### Improving access to land and credit
- Land reform and legislation:
  - New National Land Policy prepared in 2000 and approved by cabinet on January 17, 2002.
  - Special Law Commission empanelled in January 2003 to review land legislation and formulate new framework.
  - Draft Land Bill prepared and submitted to parliament on June 13, 2006.
  - Bill provides for conferment of individual title deeds to land previously under customary tenure, allowing registration, leasing, and use as collateral.
  - Bill confers greater responsibility for land administration from central government to districts and traditional authorities, consistent with decentralisation.
- Microfinance policy and access:
  - Microfinance policy approved by cabinet in October 2002; policy promotes best practices, peer-regulatory structure, and establishment of a monitoring system.
  - Target at decision point: increase number of microfinance clients by 20 percent.
  - Actual: clients increased from 257,276 in 2000 to 459,906 by December 2005, representing a 79 percent increase.
  - Reserve Bank of Malawi established a monitoring system covering all microfinance institutions in 2003 under the SADC microfinance observatory initiative, run in collaboration with the Malawi Microfinance Network (MAMN).

### Creating an effective safety net system
- Strategy and coordination:
  - National Safety Net Strategy produced with World Bank collaboration; objective to create an affordable, effective, coordinated, and targeted safety net system.
  - National Safety Nets Unit (NSU) established in 2002 to coordinate rationalization and prioritization through four technical sub-committees (Public Works Program, Targeted Inputs Program, Targeted Nutrition Program, Direct Welfare Transfers).
- Program changes and targeting:
  - Universal starter-pack transformed into Targeted Input Program (TIP) in 2000/01:
    - Beneficiaries reduced from 2.86 million to 1.5 million; scaled down to 1 million in 2001/02; by 2004/05 beneficiaries climbed to 2 million.
  - From 2005/06, TIP transformed into a fertilizer price subsidy program targeting 1.7 million poor smallholder maize and tobacco farmers; program requires farmer cash complement to vouchers.
  - Public Works Program (PWP) scaled up to enable poorest farmers to purchase fertilizer; NSNS trigger judged satisfactorily implemented despite regressivity concerns with the new voucher scheme.
- Rationalization and donor coordination:
  - Attempts to rationalize donor-managed safety nets limited; many competing programs remain due to poorly coordinated donor positions and diverse instruments.
  - NSU coordinating development of a Social Protection Policy to provide a definitive framework.
- Monitoring and evaluation:
  - M&E system established in NSU to monitor a large number of indicators (process, inputs, outputs, outcomes) for four priority programs and any other programs.
  - A catalogue of safety net programs and report formats designed; NSU conducts in-depth monitoring via field visits.

### Use of HIPC Initiative interim assistance
- Objective: HIPC debt relief resources to increase funding to poverty-reducing areas within normal budget prioritization.
- Government actions:
  - Identified a small sub-set of high-priority activities from interim PRSP to benefit from additional HIPC funding; list later expanded after full PRSP finalization.
  - Ring-fenced funding for these expenditures, termed Protected Pro-poor Expenditures (PPEs), to protect priority activities from revenue shortfalls.
  - Level of expenditures on PPEs during fiscal years 2001/02 to 2004/05 summarized in Table 2 (table not reproduced here).
  - Funding allocations to PPEs and out-turns published on the Ministry of Finance website and in the press on a quarterly basis.
- Post-completion commitment:
  - Government committed to continue ring-fencing funding for PPEs beyond HIPC completion point.
  - Plans to revise the list of PPE activities in consultation with stakeholders, civil society, and parliament.

### Debt relief and debt sustainability update — data reconciliation and creditor participation
- Data reconciliation (end-1999 stock):
  - Nominal stock and NPV of debt after traditional debt relief reduced slightly:
    - Nominal stock revised from US$ 2,604 million to US$2,600 million.
    - NPV of debt revised from US$ 1,469 million to US$1,466 million.
- Multilateral creditors:
  - NPV of debt of multilateral creditors as of end 1999 reduced by US$3.7 million to US$1,094 million.
  - Reclassification: European Union loans administered by IDA now treated as loans from Paris Club creditors.
  - Estimates of NPV of debt to IDA, IBRD, AfDf and AfDB reduced slightly; NPV of debt to PTA Bank raised by US$2 million.
  - Note: Debt owed to PTA Bank could not be reconciled with creditor statements; revised based on correspondence and legal context; PTA Bank has not provided HIPC assistance to Malawi.
- Bilateral and commercial creditors:
  - NPV of debt owed to Paris Club creditors increased from US$294 million to US$320 million due to reclassification.
  - NPV of debt owed to commercial creditors declined from US$43 million to US$17 million.
- Exports data revision:
  - Estimates of exports of goods and services used to evaluate HIPC assistance revised from an average US$551 million per year over 1997-99 to US$547 million.
- Impact on HIPC assistance totals:
  - Common reduction factor increased from 43.7 to 44.1 percent.
  - Total HIPC assistance in NPV terms revised upwards from US$643 million to US$646 million.
  - Malawi has received financing assurances of participation in the HIPC Initiative from creditors representing 97 percent of the NPV of HIPC assistance estimated at the decision point.
  - All but one multilateral creditor, all Paris Club and all but one commercial creditor have confirmed participation.
- Revised HIPC assistance by creditor type (NPV, as of end-1999):
  - Multilateral creditors: US$482 million (75 percent of total HIPC assistance).
  - The World Bank (IDA/IBRD): US$333 million in NPV terms.
    - IDA delivered US$100 million in NPV terms (US$118 million in nominal terms) in interim relief between January 2001 and August 2006 (55.3 percent reduction of debt service falling due over this period).
    - On reaching completion point, revised HIPC debt relief would equal an average of 55.9 percent of debt service due, provided till end 2020.
  - IMF: SDR23.3 million (US$30.3 million) in NPV terms at the decision point.
    - Represents an average reduction of 33 percent in debt service over 2001-9, excluding 2002.
    - IMF disbursed SDR 11.6 million (US$16.5 million) in interim assistance during the interim period.
    - At completion point IMF will disburse remaining HIPC assistance of SDR 11.7 million, together with accrued interest currently estimated at SDR 3.7 million, subject to satisfactory assurances from other creditors.
  - AfDB: US$71 million in NPV terms; AfDB provided US$26 million of interim relief in end-1999 NPV terms; remaining assistance through an 80 percent reduction of debt service on debt outstanding at end-1999, applied till July 2016.
  - Bilateral and commercial creditors:
    - Paris Club creditors: US$141 million in NPV terms under the enhanced HIPC Initiative; interim assistance provided via flow treatment under Cologne terms agreed January 25, 2001.
    - Paris Club creditors indicated additional assistance beyond HIPC relief estimated at US$84 million in end-2005 NPV terms, of which US$3.7 million in NPV terms provided during interim period.
    - Non-Paris Club creditors: expected assistance under enhanced HIPC Initiative amounting to US$15 million in NPV terms.
      - South Africa agreed to cancel 100% of all maturities as they fall due.
      - Kuwaiti Fund indicated in 2004 to deliver HIPC debt relief once Malawi reaches completion point.
      - Taiwan, Province of China has not yet manifested intention of delivering HIPC debt relief to Malawi.
    - Most commercial creditors located in Paris Club countries have provided full amount of HIPC debt relief on comparable terms.
    - Two commercial creditors located in the Netherlands and South Africa have not yet provided the full amount of HIPC debt relief as agreed at the decision point.

*Italic: IMF staff report content as provided in the source content unit.*

### 56. The current estimate of Malawi’s debt stock updates the previous version

### 56. The current estimate of Malawi’s debt stock updates the previous version

### Updated debt stock and creditor composition
- Based on loan-by-loan data and exchange and interest rates at end-2005 (Table 5), and 99 percent data reconciliation, Malawi’s nominal stock of external debt reached US$2.97 billion at end-2005 (Table 8).
- Multilateral creditors were owed 88 percent of the total nominal debt stock.
- The IDA and the AfDB Group account for 65 percent and 14 percent of total outstanding debt, respectively.

### NPV of external debt and debt-to-exports ratios at end-2005
- NPV of Malawi’s external debt at end-2005, after full delivery of HIPC assistance at the decision point: US$1.3 billion, equivalent to 245 percent of exports.
- With voluntary bilateral debt relief beyond HIPC assistance: NPV = US$1.2 billion; NPV of debt-to-exports ratio = 229 percent.
- Decision point projection for end-2005: NPV of debt-to-exports ratio = 169 percent.
- The actual NPV ratio at end-2005 therefore:
  - Exceeds decision point projections by 60 percentage points.
  - Exceeds the HIPC threshold of 150 percent by nearly 80 percentage points.

### Projection scenarios, baseline, and debt service implications
- At the decision point it was anticipated the NPV debt ratio would remain above the HIPC threshold until 2010, peaking at 180.7 percent in 2002.
- Current baseline scenario (which assumes sound policy implementation and MDRI) implies:
  - NPV of debt-to-exports ratio remains above the HIPC threshold through to 2020.
  - Debt service remains above 8 percent of exports till 2013.
- Baseline scenario assumptions include:
  - Average export growth of 6 percent (consistent with government strategy to diversify and promote exports), versus 4.8 percent projected at decision point for 2006-20.

### Sources of deterioration in NPV ratio (decision point to end-2005)
- Lower-than-projected export receipts explain one third of the higher NPV ratio:
  - Non-traditional export receipts more than doubled; merchandise export volume growth averaged 8.8 percent over 2001-05 versus 5.4 percent envisaged at decision point.
  - Merchandise export price growth averaged about ½ percent per year over 2001-05 versus more than 2 percent per year anticipated.
  - Tobacco (about half of merchandise exports):
    - Expected price change 2000–2005: +20.4 percent; actual: -13.6 percent.
    - Malawi’s market share in tobacco world market rose from 1.47 percent in 2000 to 2.41 percent in 2004.
- Changes in discount rates explain about half of the increase in the NPV ratio:
  - Discount rates used: 6-months backward average of long-term Commercial Interest Reference Rates (CIRRs) of the OECD.
  - Decline in CIRRs reflects market expectations of lower inflation or a lower real interest rate and is associated with a lower level of economic activity in industrialized countries, worsening export outlook for HIPC countries.
- Unanticipated depreciation of the US dollar against the Euro and SDR contributed, since more than three quarters of Malawi’s debt is denominated in Euros and SDR while tobacco export receipts are in US dollars.
- Unanticipated new borrowing:
  - Lower than projected concessionality of new loans raised the NPV ratio by 13.6 percentage points (actual grant element over 2000-05 averaged 57 percent versus 71 percent assumed).
  - Smaller-than-projected volume of new borrowing lowered the NPV ratio by 9.7 percentage points.
- Increase in import prices, especially oil:
  - Decision point expected import prices to increase by 0.7 percent each year over 2000-05; actual increase was 6.7 percent per year on average, largely due to international petroleum prices.
  - Resulted in a deterioration in Malawi’s terms of trade of about 20 percent over 2000-05.
  - High import prices weakened Malawi’s capacity to service external debt and increased external financing need and pressure on limited external reserves.

### Attribution of causes and assessment of exogeneity
- Staff view: the substantial unanticipated deterioration in Malawi’s NPV of debt-to-exports ratio between decision and completion points was primarily attributable to exogenous factors:
  - Lower export prices for main export commodity, changes in discount and exchange rates, and overly optimistic new borrowing assumptions were unambiguously exogenous and fully explain the unanticipated increase.
  - Unanticipated increase of import prices also contributed to a worsening debt sustainability outlook.

### Recommendation on topping-up of HIPC assistance
- Under the enhanced HIPC framework, topping-up at the completion point can be provided if deterioration in debt burden indicators is primarily attributable to exogenous factors.
- Staffs consider Malawi meets the requirements for topping-up at the completion point.
- Staff recommendation: additional assistance of US$411 million under the enhanced HIPC Initiative to bring Malawi’s NPV debt ratio from 229 percent at end-2005 (after bilateral debt relief beyond HIPC) down to the 150 percent HIPC threshold.
  - Note: The share of IDA’s and IMF’s assistance in total topping-up assistance is 74 percent.

### Debt relief under the Multilateral Debt Relief Initiative (MDRI)
- If Executive Directors approve the completion point, Malawi qualifies for MDRI relief from three creditors: IDA, the AfDF, and the IMF.
- MDRI relief amounts depend on Executive Directors’ decision on topping-up.
- MDRI debt relief (net of HIPC assistance) would lead to debt service savings on debt owed to IDA, the IMF and the African Development Bank of:
  - US$1.9 billion without topping-up.
  - US$1.4 billion with topping-up.

- Without topping-up:
  - IDA: debt stock reduction of US$1.8 billion (of which US$1.4 billion due to MDRI and the remainder to HIPC assistance).
    - Average annual debt service savings (net of HIPC assistance): US$27 million between 2006 and 2010; US$41 million over the next 38 years.
    - Total debt service savings: US$1.5 billion (or SDR 1.1 billion).
  - IMF: debt stock reduction of SDR37.9 million (SDR22.4 million from MDRI-I Trust; remainder from HIPC umbrella).
    - Debt service savings (net of HIPC assistance): average SDR 3 million (or US$4 million) over next 8 years; total SDR 22 million (or US$32 million).
    - Reserve Bank of Malawi will transfer the flow of savings on IMF debt service to the budget annually.
  - AfDF: debt stock cancellation of US$382.9 million (US$54.4 million corresponding to HIPC assistance).
    - Annual debt service savings (net of HIPC assistance): average US$27 million over next 5 years and US$8 million over next 45 years.
    - Total MDRI debt service savings: US$347 million nominal, delivered in full at completion point.

- With topping-up:
  - IDA: cancel US$1.8 billion of debt stock owed on October 1, 2006 (US$1.1 billion of reduction due to MDRI).
    - Average annual debt service savings (net of HIPC assistance): US$8 million over next 5 years and US$31 million over next 38 years.
    - Total debt service savings: US$1.2 billion.
  - IMF: MDRI relief SDR37.9 million composed of SDR14.5 million from MDRI-I Trust, SDR15.4 million from completion point assistance to Malawi’s HIPC umbrella sub-account, and SDR8 million from topping-up.
    - Debt service savings (net of HIPC assistance): average SDR1.6 million (or US$2.4 million) over next 8 years; total SDR13 million (or US$19 million).
  - AfDF: cancel US$383 million of debt stock (US$95 million corresponding to HIPC assistance).
    - Annual debt service savings (net of HIPC assistance): average US$2 million over next 5 years and US$4 million over projection period; total US$253 million over entire projection period.

*Source: IMF staff report (excerpts).*

### 69. The macroeconomic framework underpinning the debt sustainability outlook

### The macroeconomic framework underpinning the debt sustainability outlook

### Macroeconomic assumptions (Box 6)
- Growth:
  - Annual output growth projected to amount to approximately 6 percent over the near term, and to drop to 4.5 percent in line with the regional long term average and consistent with annual per capita growth of 2.5 percent.
  - Historical ten-year average of real GDP growth: 2.8 percent.
- Inflation and exchange rates:
  - Inflation is expected to fall and remain in single digits within the near term.
  - The real exchange rate is assumed to remain steady through the longer term.
- Net official assistance and aid composition:
  - Net official assistance to Malawi is assumed to increase gradually and modestly by about 2 percent of GDP to about 23 percent of GDP by 2015, mainly as a result of debt relief.
  - The share of grants in gross aid inflows is expected to increase from 78 percent in the first half of the decade to about 84 percent.
  - Higher aid flows are assumed to have a high import content which will mitigate the threat of an aid-driven appreciation of the real exchange rate.
- External official debt and new borrowing:
  - Outlook assumes the full delivery of HIPC assistance and debt relief under the MDRI.
  - New debt is assumed to be issued on concessional terms consistent with the experience since the decision point.
  - New borrowing is assumed to decline from 5.8 percent of GDP in the first half of this decade to 3.8 percent of GDP over the projection period.
- FDI and exports:
  - Priority on increasing and diversifying Malawi’s export base; possible areas: tobacco and tea, other agricultural products, tourism, hydro electricity and mineral resources.
  - If implemented, export share will increase supported by stronger FDI inflows and growth in private sector investment.
- Fiscal policy and public spending:
  - Fiscal policy expected to target continued reduction of domestic debt to around 2 percent of GDP.
  - Government assumed to maintain a stable domestic revenue effort relative to GDP.
  - A lower domestic interest bill and higher net aid inflows are assumed to support an increase in the development budget by 4 percent of GDP.
  - Poverty reducing current spending will be increased, including a rise in the wage bill to 8.5 percent of GDP to cover increased employment in social sectors.
  - The ability of government to absorb additional aid will be a key constraint on scaling up of aid.
- Current account:
  - Current account balance expected to deteriorate modestly; higher exports offset by higher aid-driven imports and the tilt in composition of gross aid toward loans.
- Reserves:
  - Gross official reserves assumed to increase steadily to 5 months of imports over the longer term.

### Medium-term growth and program context
- The macroeconomic framework is in line with the government’s economic program supported by the PRGF arrangement with the IMF.
- Long-term assumptions based on authorities’ sectoral strategies including the MGDS and latest WEO prices and recent macroeconomic trends.
- MGDS aims to enhance growth by maintaining macroeconomic stability and implementing structural reforms to create an enabling environment for private sector investment.
- Key growth assumptions and implications:
  - Projected real GDP growth of around 6 percent per year on average between 2006 and 2011.
  - Longer term cautious annual growth rate of 4.5 percent, consistent with regional average and annual per capita growth of 2.5 percent.
  - Assumed that an increase in output growth by one percentage point would accelerate the annual rate of decline in the poverty headcount ratio by about 0.2 percentage points.
- Aid and borrowing assumptions:
  - Outlook assumes only a modest increase in aid flows and does not incorporate substantial scaling up of aid.
  - Borrowing projections based on current information regarding future commitments; new borrowing assumed to be kept at modest levels and on concessional terms consistent with the average since the decision point.
  - Budget expected to benefit from increased routing of a portion of aid through central government as capacity to utilize aid increases.

### Baseline projections excluding topping-up of HIPC assistance
- Impact of HIPC and MDRI:
  - Malawi’s external debt expected to remain below the HIPC threshold throughout the projection period under the baseline.
  - HIPC assistance, bilateral creditors’ relief beyond HIPC, and MDRI projected to reduce Malawi’s NPV of debt outstanding as of end-2005 from US$1.3 billion to US$242 million at end-2006.
  - NPV of debt-to-exports ratio drops from 245 percent as of end-2005 to 43 percent by end-2006; subsequently rises to about 89 percent at the end of the projection period because of new borrowing.
  - NPV of debt-to-GDP ratio decreases to 11 percent at end-2006 and gradually approaches 24 percent at the end of the projection period.
  - NPV of debt-to-revenue ratio declines to 44 percent in 2006 and trends upwards above 102 percent near the end of the projection period.
- Debt service:
  - After HIPC relief and MDRI, annual debt service would average US$17 million on average during 2006-15, the equivalent of about 2 percent of exports of goods and services.

### Baseline projections including topping-up of HIPC assistance
- Impact with topping-up and MDRI:
  - NPV of debt-to-exports ratio would further drop to 32 percent at end-2006; then rise to 103 percent at the end of the projection period.
  - NPV of debt-to-GDP ratio would decrease to 8 percent at end-2006 and is expected to reach above 28 percent by the end of the projection period.
  - NPV of debt-to-revenue ratio would decline to 33 percent in 2006 and would average about 108 percent over 2016-25.
- Debt service:
  - After HIPC relief, additional bilateral relief, topping-up and MDRI, total annual debt service would decrease to US$16 million on average during 2006-15, the equivalent of about 2 percent of exports of goods and services.
  - Debt service would remain around 2 percent of exports through the remainder of the projection period.

### Sensitivity analysis — risks and scenarios
- General conclusion:
  - Even with debt relief under MDRI, Malawi’s debt sustainability remains vulnerable in the long run.
  - Possible risks: contracting new debt on inadequately concessional terms; high levels of new borrowing combined with poor policy implementation leading to poor growth and weak export growth; failure to insulate the economy from periodic shocks.
- Scenario I: Borrowing on less than fully concessional terms
  - Assumption: grant element of 45 percent on new borrowing (less concessional).
  - Output and export growth and gross aid flows same as baseline.
  - Effects:
    - Debt remains below HIPC threshold throughout projection period.
    - By the end of the projection period, lower concessionality raises NPV of debt above 117 percent of exports and debt service above 7 percent of exports.
- Scenario II: Higher borrowing and lower exports
  - Assumptions:
    - Government supplements baseline aid with higher borrowing similar to first half of the decade.
    - Structural reform implementation unsuccessful.
    - Long-term global prospects for tobacco prices poor; export diversification unsuccessful.
    - Output and export growth and reserve accumulation weaker than baseline; export sector’s share of total output falls.
  - Effects:
    - NPV of debt-to-exports ratio breaches the HIPC thresholds by 2019, reaching 196 percent at the end of the projection period.
    - Debt service-to-export ratio rises to 5 percent of exports by 2025.
- Scenario III: Failure to insulate the economy from periodic droughts
  - Assumption: droughts occur every 5 years starting in 2010; drought years reduce production and exports.
  - Despite increased donor support during droughts, domestic borrowing and external reserves are pressured; higher domestic borrowing, inflation and real interest rates; lower private investment, output and export growth.
  - Effects:
    - After HIPC and MDRI, NPV of debt-to-exports ratio remains below the HIPC threshold throughout the projection period.
    - Given substantial donor grant support during droughts, debt burden indicators under the drought scenario closely mimic the baseline.
- Scenario IV: Scaling-up of aid and new borrowing
  - Assumptions:
    - Aid (including flows outside government) increased by 5 percent of GDP to about 26.5 percent of GDP over 2011-25.
    - Composition of aid between grants and loans remains broadly unchanged from recent experience.
    - New borrowing rises to 6.8 percent of GDP (about 3 percent of GDP higher than in baseline).
    - Additional aid used effectively, increasing annual growth of both output and exports by 0.5 percent above the baseline.
  - Effects:
    - Despite higher output and export growth, additional borrowing induces the NPV of debt-to-exports ratio to breach the HIPC threshold before the end of the projection period.
    - Illustrates need to rely heavily on grant financing to make faster progress toward the MDGs while maintaining sustainable debt burden indicators.

### Policy implications and recommendations
- Strengthen debt management to ensure new borrowing is on adequately concessional terms to prevent re-emergence of unsustainable external debt burdens.
- Make prudent use of resources freed up through debt relief and strengthen public expenditure management.
- Continue implementation of governance and structural reforms after the completion point to sustain strong economic growth and avoid deterioration of debt burden indicators.
- Recognize constraints on scaling up aid: government’s ability to absorb additional aid is a key constraint; composition of aid (grants versus loans) critically affects debt sustainability.

### Conclusions on program performance (summary of staff view)
- IDA and IMF staffs consider Malawi’s performance with regard to conditions for reaching the completion point under the Enhanced HIPC Initiative has been broadly satisfactory.
- Malawi formulated a full PRSP—the MPRS—in 2002; implementation initially weak but improved in recent years; implementation over the last year assessed as satisfactory.
- Malawi has met the requirement for a minimum of six months satisfactory performance under a PRGF-supported program; maintained almost two years of satisfactory macroeconomic policy implementation (SMP from July 2004 to June 2005; PRGF arrangement approved in August 2005).
- Social measures: Malawi has successfully implemented a range of social measures specified at the decision point; staff assess all but two triggers implemented (related to the share of health expenditures and the number of teachers in training college).
  - Staff recommend waivers be granted for non-observance of these two triggers in view of progress in broader strategies for education and health.

*Source: _cr06420 - 69. The macroeconomic framework underpinning the debt sustainability outlook*

### 88. Achieving and sustaining strong economic growth will require, in addition to

### _cr06420 - 88. Achieving and sustaining strong economic growth will require, in addition to

### Growth requirements and policy priorities
- Achieving and sustaining strong economic growth will require, in addition to maintaining a sound macroeconomic framework, accelerated structural and governance reforms.
- The government must:
  - sustain the recent pace of implementation of reforms,
  - increase and implement more effectively its public investment program,
  - strengthen partnership with donors.

### Debt situation and HIPC/MDRI implications
- Malawi’s debt burden at end-2005 is higher than anticipated at the decision point.
- Full delivery of assistance under the HIPC Initiative would reduce Malawi’s debt burden but would not be sufficient to make this burden sustainable.
- This insufficiency reflects a detrimental shift in exogenous factors beyond the control of the country.
- IDA and IMF staffs recommend that Malawi be considered for additional and exceptional assistance under the HIPC Initiative.
- On reaching the completion point under the HIPC Initiative, Malawi has also become eligible for debt relief under the MDRI.
- After full delivery of the HIPC Initiative and additional debt relief from some Paris Club creditors and MDRI, the NPV of debt-to-exports ratio would be reduced to about 43.0 percent at end-2006.
- Debt relief under the MDRI increases the scope for new borrowing and highlights the importance of prudent external debt management to ensure that new borrowing is maintained within limits and on adequately concessional terms.

### Vulnerabilities and sensitivity analysis
- Malawi’s economy remains vulnerable to external shocks.
- Sensitivity analysis shows that external debt sustainability could be jeopardized by:
  - a return to high levels of borrowing,
  - a failure to implement strong macroeconomic and structural reform policies to enhance output growth and improve the performance of the export sector.
- Malawi’s debt sustainability could also be jeopardized by a failure to implement measures to insulate the economy from periodic droughts to which Malawi is susceptible and which have an impact on its main export commodity, tobacco.

### Key challenges and risks post-completion point
- Pressures for higher spending in the post-completion point period, financed by external borrowing, could:
  - jeopardize macroeconomic stability,
  - undermine debt sustainability,
  - endanger external competitiveness.
- Uncertainties about projected commodity output and prices persist; a sharp fall in these prices could jeopardize the sustainability of the external position.
- The government needs to maintain the pace of governance and structural reforms beyond the completion point to:
  - attract private and official resources,
  - sustain strong economic growth,
  - reduce poverty.

*Source: IMF staff report text (paragraphs 88–91) contained in the supplied content unit.*

### 92. In light of the above, the staffs of the IDA and IMF recommend that the

### _cr06420 - 92. In light of the above, the staffs of the IDA and IMF recommend that the

### Recommendation and Completion Point Determination
- The staffs of the IDA and IMF recommend that the Executive Directors determine that Malawi has reached the completion point under the Enhanced HIPC Initiative.
- Additional assistance under the Initiative is recommended to lower Malawi’s NPV of debt to exports ratio at end-2005 to 150 percent.

### Issues for Discussion (listed questions and focal points)
- Completion point: Do Directors agree that Malawi has met all but two of floating conditions for reaching the completion point under the enhanced HIPC Initiative, as established at the time of the decision point?
- Data correction: Do Directors agree with staffs’ recommendation that the proposed revision in the stock of debt in NPV terms and exports of goods and services warrants a revision in the amount of HIPC Initiative assistance?
- Topping-Up: Do Directors agree that the deterioration in Malawi’s debt sustainability is primarily attributable to a fundamental change in its economic circumstances due to exogenous factors?
  - If so, do Directors agree that exceptional additional HIPC Initiative assistance be granted to lower Malawi’s NPV of debt-to-exports ratio at end-2005 to 150 percent?
  - If so, do Directors agree that this additional assistance would be granted when the Boards decide that other creditors have provided sufficient assurances to participate in this exceptional effort?
- MDRI: Do IMF Directors agree that Malawi qualifies for an amount of debt relief by the Fund equal to SDR37.9 million, of which:
  - SDR14.5 million would be financed from the MDRI-I Trust,
  - SDR15.4 million from completion point assistance disbursed to Malawi’s HIPC umbrella sub-account, and
  - SDR8 million from topping-up assistance, if topping-up is approved?
  - Do Directors agree that the authorities have adequate monitoring mechanisms to ensure that debt relief is used according to its intended purposes?
- Creditor participation: Do Directors agree that sufficient assurances have been given by Malawi’s creditors to commit HIPC assistance to Malawi on an irrevocable basis?
- Debt sustainability: Do Directors agree with staffs’ assessment that Malawi’s debt sustainability is likely to be maintained over the medium and long-term?
  - Do Directors share staffs’ assessment regarding possible risks if the authorities do not actively pursue export diversification and prudent fiscal and debt management policies?
- Continued pursuit of debt relief: Do Directors agree that Malawi should continue to seek debt relief from its non-Paris Club creditors within the framework of the HIPC Initiative and that the staffs should continue to monitor the delivery of the debt relief from all creditors?

### Protected Pro-poor Expenditures: Resources Used, FY2001/02–FY2004/05 (selected line items, In millions of U.S. dollars)
- Agriculture
  - Agricultural Extensions: 2001/02: 2.21; 2002/03: 2.87; 2003/04: 8.01; 2004/05: 6.48; Total: 19.57
  - Small-scale Irrigation: 2001/02: -; 2002/03: 3.38; 2003/04: 1.87; 2004/05: -; Total: 5.25
  - Technology Generation and Technical Service: 2001/02: -; 2002/03: -; 2003/04: -; 2004/05: 3.34; Total: 3.34
- Water Development
  - Rural Water Supply: 2001/02: 0.90; 2002/03: 0.61; 2003/04: 0.27; 2004/05: 0.31; Total: 2.09
  - Borehole and Dam Construction: 2001/02: 3.51; 2002/03: 2.30; 2003/04: 0.95; 2004/05: -; Total: 6.76
  - Rehabilitation: 2004/05: 0.13; Total: 0.13
- Education
  - Teaching and learning materials: 2001/02: 9.05; 2002/03: 5.72; 2003/04: 15.97; 2004/05: 5.40; Total: 36.14
  - Teacher's salaries: 2001/02: -; 2002/03: 30.72; 2003/04: 49.77; 2004/05: 45.88; Total: 126.37
  - Teacher training: 2001/02: 1.97; 2002/03: 4.99; 2003/04: 3.40; 2004/05: 3.78; Total: 14.14
- Health (selected)
  - Primary Health Care: 2001/02: 8.69; 2002/03: 9.97; 2003/04: -; 2004/05: -; Total: 18.66
  - Curative Health Services: 2001/02: 8.84; 2002/03: 6.52; 2003/04: 8.80; 2004/05: 7.94; Total: 32.1
  - Drugs: 2002/03: 14.80; 2003/04: 12.48; 2004/05: 12.23; 2004/05: 13.16; Total: 52.67
  - Health Workers' Training: 2001/02: 1.67; 2002/03: 3.65; 2003/04: 1.44; 2004/05: 2.25; Total: 9.01
- Police and Community Policing
  - Crime Prevention and Investigation: Total: 2.48
  - Community Policing: 2001/02: 0.04; 2002/03: 2.56; 2003/04: 1.70; 2004/05: 1.34; Total: 5.64
  - Police Officer Training: 2002/03: -; 2003/04: 1.53; 2004/05: 1.05; 2004/05: 1.91; Total: 4.49
- Transport and Roads
  - Rural Feeder Roads: 2001/02: 10.68; 2002/03: 4.60; 2003/04: 0.76; 2004/05: -; Total: 16.04
- Total protected pro-poor expenditures:
  - 2001/02 (Actual): 97.17
  - 2002/03 (Actual): 129.43
  - 2003/04 (Actual): 116.64
  - 2004/05 (Actual): 61.84
  - Total (FY2001/02–FY2004/05): 405.08
- HIPC Debt Relief by year (In millions of U.S. dollars):
  - 2001/02: 30.7
  - 2002/03: 40.2
  - 2003/04: 50.9
  - 2004/05: 46.9
  - Total HIPC Debt Relief: 168.7
- Source: Malawian authorities

### Selected Macroeconomic and Public Finance Indicators (selected series and exact values)
- Real GDP growth (annual rates shown as a sequence): 6.1; 7.1; 2.8; 8.4; 5.6; 6.0; 6.0; 5.5; 5.0; 4.5; 4.5; 4.5; 4.5; 4.5; 4.5; 5.5; 4.5
- Nominal GDP (billions of kwacha) (selected years and averages):
  - 2003: 172
  - 2004: 207
  - 2005: 246
  - 2006: 304
  - 2007: 345
  - 2008: 393
  - 2009: 447
  - 2010: 506
  - 2015: 901
  - 2025: 2832
  - Average 2006-15: 563
  - Average 2016-25: 1766
- GDP current prices, U.S. dollars (selected):
  - 2003: 1765
  - 2004: 1903
  - 2005: 2076
  - 2006: 2158
  - 2015: 4005
  - 2025: 7732
  - Average 2006-15: 3006
  - Average 2016-25: 5854
- GDP per capita (U.S. dollars) (selected):
  - 2003: 148
  - 2004: 155
  - 2005: 166
  - 2006: 172
  - 2015: 264
  - 2025: 414
  - Average 2006-15: 215
  - Average 2016-25: 341
- Consumer price index, percent change (period average) (selected):
  - 2003: 9.6
  - 2004: 11.4
  - 2005: 15.5
  - 2006: 13.1
  - 2007–2025: sequence includes 7.2; 7.5; 7.4; 7.3; 7.3; 7.3; 7.3; 7.3; 7.3; 7.3; 7.3; 7.9; 7.3
- Public finance (percent of GDP) (selected)
  - Total revenues (including grants): 26.7; 34.7; 37.6; 44.1; 41.8; 39.0; 38.7; 38.0; 38.3; 38.2; 38.1; 38.1; 38.0; 37.6; 37.5; 39.2; 37.9
  - Revenue (excluding grants): 20.0; 22.6; 25.1; 24.9; 24.2; 24.2; 23.7; 23.7; 23.7; 23.7; 23.7; 23.7; 23.7; 23.7; 23.7; 23.9; 23.8
  - Grants: 6.7; 12.2; 12.5; 19.2; 17.6; 14.8; 15.0; 14.3; 14.6; 14.5; 14.4; 14.4; 14.3; 13.9; 13.8; 15.3; 14.1
  - Total expenditure: 38.3; 42.5; 43.1; 46.1; 43.1; 39.4; 38.7; 38.2; 38.6; 41.2; 41.3; 41.2; 41.2; 41.3; 41.1; 40.9; 40.6
  - Overall balance: -11.6; -7.8; -5.6; -2.0; -1.3; -0.5; 0.0; -0.2; -0.3; -3.0; -3.1; -3.2; -3.2; -3.7; -3.6; -1.7; -2.7
- External sector and reserves (selected)
  - Export of goods and services, US$m: 481; 511; 566; 614; 636; 657; 678; 738; 799; 862; 929; 1001; 1079; 1571; 2287; Average 2006-15: 799.4; Average 2016-25: 1669.5
  - Current account balance (excluding official transfers): -17; -21; -20; -20.5; -17.1; -15.1; -16.3; -18.6; -18.0; -18.0; -18.1; -18.2; -18.2; -18.5; -18.8; -17.8-18.0
  - Current account balance (including official transfers): -7.6; -9.3; -5.9; -7.7; -1.8; -1.1; -2.5; -4.8; -4.2; -4.2; -4.3; -4.4; -4.4; -4.7; -5.0; -3.9; -4.0
  - Net official aid inflows to Malawi: 20.0; 18.9; 23.8; 21.8; 24.7; 22.2; 22.1; 22.9; 22.8; 22.7; 22.6; 22.6; 22.5; 22.5; 22.3; 22.7; 22.7
  - Usable gross official reserves (in millions US dollars): 116; 119; 131; 114; 207; 299; 362; 399; 437; 482; 531; 586; 644; 1034; 1637; Average 2006-15: 406; Average 2016-25: 1117
  - In months of annual imports of goods and services: 1.4; 1.3; 1.4; 1.2; 2.2; 2.9; 3.3; 3.4; 3.5; 3.6; 3.7; 3.8; 3.9; 4.4; 4.9; Average 2006-15: 3.1; Average 2016-25: 4.5

### Debt Relief, Creditor Structure, and NPV Data (selected tables and figures)
- MDRI-related Fund debt relief recommended: total SDR37.9 million, composed of SDR14.5 million (MDRI-I Trust), SDR15.4 million (completion point assistance), and SDR8 million (topping-up if approved).
- Table 6 (Nominal and NPV of external debt at Decision Point, end-December 1999) (selected figures):
  - Total (Nominal): 2,604.2; Revised at Completion Point: 2,600.3
  - Multilateral (Nominal): 2,187.1; Revised: 2,174.5
  - IMF (Nominal): 87.6; NPV at Decision Point: 68.8; Revised at Completion Point NPV: 68.8
- Table 8 (Nominal and NPV at Completion Point, End-2005) (selected figures):
  - Total (Nominal): 2,969.4; NPV of Debt (after enhanced HIPC / after additional bilateral assistance): 1,919.5; 1,272.9; 1,189.2
  - Multilateral (Nominal): 2,626.0; NPV: 1,607.8; 1,168.6; 1,168.6
  - IDA (Nominal): 1,933.4; NPV: 1,171.9; 835.6; 835.6
  - Paris Club bilateral (Nominal): 300.0; NPV: 274.2; 83.7; 0.0
  - Commercial (Nominal): 2.5; NPV: 2.6; 0.6; 0.6
- Table 7 (Estimated HIPC Assistance at Decision Point (Amended), end-December 1999 NPV terms) (memorandum):
  - Assistance (decision point document): 643; 480; 144; 19; 43.7
  - Assistance (amended): 646; 482; 157; 8; 44.1
  - Memorandum: NPV of debt (amended): 1,466; Multilateral Creditors: 1,094; Bilateral Creditors: 355; Commercial Creditors: 17; NPV of debt-to-exports: 268 (using three-year average exports)
- Table 9 begins Net Present Value of External Debt, 2005–2025 (not fully provided in supplied content).

### Legal, Classification, and Assumption Notes (selected)
- Discount rates used: average commercial interest reference rates (CIRRs) over the six-month period ending in December 2005 for the completion point and in December 1999 for the decision point.
- For Euro area currencies, the Euro CIRR is used; for the Kuwaiti Dinar, the USD discount rate is used; for other currencies where CIRRs are not available, the SDR discount rate is used.
- Reclassifications and adjustments noted between decision point and completion point data, including reclassification of certain creditors between commercial and Paris Club bilateral categories and a Paris Club fixed new cut-off debt of January 1, 1997 for interim assistance.

*Source: Malawian authorities and IMF/IDA staff estimates as presented in the provided document excerpt.*

### 1. NPV of total debt (2+6) 2/

### _cr06420 - 1. NPV of total debt (2+6) 2/

### I.
- 1. NPV of total debt (2+6) 2/
  - 1903.5
  - 1912.5
  - 1922.8
  - 1933.4
  - 1944.4
  - 1963.0
  - 1983.3
  - 1999.1
  - 2008.7
  - 2023.7
  - 2041.2
  - 2061.4
  - 2096.7
  - 2140.1
  - 2183.1
  - 2232.1
  - 22
  - 84.5
  - 2341.3
  - 2402.6
  - 2469.5
  - 2544.4
  - 1966.9
  - 2275.6

- 2. NPV of outstanding debt (3+4)
  - 1903.5
  - 1853.2
  - 1806.7
  - 1768.4
  - 1726.1
  - 1684.1
  - 1636.7
  - 1584.4
  - 1525.7
  - 1468.1
  - 1408.2
  - 1345.7
  - 1289.5
  - 1232.3
  - 1168.5
  - 1104.
  - 4
  - 1037.6
  - 969.3
  - 899.2
  - 828.0
  - 756.3
  - 1669.6
  - 1063.1

- 3. Official bilateral and commercial
  - 257.2
  - 238.2
  - 220.2
  - 203.1
  - 187.3
  - 172.8
  - 158.0
  - 144.0
  - 129.9
  - 115.6
  - 101.2
  - 86.9
  - 77.5
  - 68.5
  - 59.2
  - 51.9
  - 45.3
  - 38.8
  - 32.9
  - 28.4
  - 25.4
  - 175.2
  - 51.5

- 3. Multilateral
  - 1646.3
  - 1615.0
  - 1586.5
  - 1565.3
  - 1538.8
  - 1511.3
  - 1478.6
  - 1440.4
  - 1395.9
  - 1352.5
  - 1307.0
  - 1258.8
  - 1212.0
  - 1163.8
  - 1109.3
  - 1052.5
  - 992.3
  - 930.5
  - 866.3
  - 7
  - 99.6
  - 731.0
  - 1494.3
  - 1011.6

- IDA
  - 1183.6
  - 1182.0
  - 1178.1
  - 1171.9
  - 1159.1
  - 1143.3
  - 1123.9
  - 1100.6
  - 1072.6
  - 1042.4
  - 1010.1
  - 974.0
  - 935.4
  - 895.8
  - 850.8
  - 804.2
  - 754.6
  - 703.6
  - 650.6
  - 595.5
  - 538.7
  - 1124.3
  - 77

- IMF
  - 67.444.426.920.215.212.09.16.12.91.50.00.00.00.00.00.00.00.00.00.00.0
  - 18.7
  - 0.0

- African Development Bank Group
  - 259.7
  - 258.5
  - 257.0
  - 254.9
  - 252.5
  - 249.7
  - 246.1
  - 243.3
  - 239.4
  - 234.9
  - 229.9
  - 224.6
  - 219.1
  - 213.0
  - 206.3
  - 199.0
  - 191.4
  - 183.6
  - 175.5
  - 16
  - 7.1
  - 158.6
  - 247.8
  - 193.8

- Others
  - 135.7
  - 130.1
  - 124.6
  - 118.2
  - 111.9
  - 106.3
  - 99.5
  - 90.4
  - 81.0
  - 73.8
  - 67.0
  - 60.1
  - 57.5
  - 55.0
  - 52.2
  - 49.3
  - 46.3
  - 43.3
  - 40.2
  - 37.0
  - 33.7
  - 103.5
  - 47.5

- 4. Official bilateral and commercial
  - 257.2
  - 238.2
  - 220.2
  - 203.1
  - 187.3
  - 172.8
  - 158.0
  - 144.0
  - 129.9
  - 115.6
  - 101.2
  - 86.9
  - 77.5
  - 68.5
  - 59.2
  - 51.9
  - 45.3
  - 38.8
  - 32.9
  - 28.4
  - 25.4
  - 175.2
  - 51.5

- Paris Club
  - 235.4
  - 220.3
  - 204.3
  - 188.6
  - 174.2
  - 161.0
  - 147.6
  - 135.0
  - 122.2
  - 109.3
  - 96.3
  - 82.9
  - 73.7
  - 64.8
  - 55.7
  - 48.6
  - 42.1
  - 35.7
  - 30.0
  - 25.7
  - 22.9
  - 163.1
  - 48.2

- Other official bilateral and commercial
  - 21.8
  - 17.9
  - 15.9
  - 14.5
  - 13.1
  - 11.8
  - 10.4
  - 9.0
  - 7.6
  - 6.2
  - 4.8
  - 4.0
  - 3.9
  - 3.7
  - 3.5
  - 3.4
  - 3.2
  - 3.0
  - 2.9
  - 2.7
  - 2.5
  - 12.1
  - 3.3

### II. After delivery of enhanced HIPC assistance
- 1. NPV of total debt (2+6) 2/
  - 1887.2
  - 1315.0
  - 1370.4
  - 1417.7
  - 1465.0
  - 1520.6
  - 1580.1
  - 1635.9
  - 1688.6
  - 1749.0
  - 1811.6
  - 1877.0
  - 1948.3
  - 2028.2
  - 2109.9
  - 2197.2
  - 22
  - 53.7
  - 2314.4
  - 2379.3
  - 2449.2
  - 2526.2
  - 1585.5
  - 2208.4

- NPV of total debt after full delivery 3/
  - 1272.9
  - 1315.0
  - 1370.4
  - 1417.7
  - 1465.0
  - 1520.6
  - 1580.1
  - 1635.9
  - 1688.6
  - 1749.0
  - 1811.6
  - 1877.0
  - 1948.3
  - 2028.2
  - 210
  - 9.9
  - 2197.2
  - 2253.7
  - 2314.4
  - 2379.3
  - 2449.2
  - 2526.2
  - 1529.7
  - 2208.4

- 2. NPV of outstanding debt (3+4)
  - 1887.2
  - 1255.7
  - 1254.3
  - 1252.7
  - 1246.7
  - 1241.7
  - 1233.5
  - 1221.2
  - 1205.6
  - 1193.4
  - 1178.5
  - 1161.3
  - 1141.2
  - 1120.4
  - 1095.4
  - 1069.
  - 5
  - 1006.8
  - 942.4
  - 875.9
  - 807.8
  - 738.2
  - 1288.2
  - 995.9

- 3. Official bilateral and commercial
  - 279.4
  - 99.9
  - 92.9
  - 86.4
  - 80.5
  - 74.4
  - 68.6
  - 62.9
  - 57.1
  - 51.2
  - 45.3
  - 40.1
  - 35.7
  - 31.5
  - 27.2
  - 23.2
  - 19.8
  - 16.4
  - 13.3
  - 11.0
  - 9.2
  - 90.8
  - 22.
  - 7

- Paris Club
  - 243.1
  - 82.0
  - 75.8
  - 70.4
  - 65.4
  - 60.3
  - 55.4
  - 50.5
  - 45.6
  - 40.7
  - 35.7
  - 31.5
  - 28.0
  - 24.8
  - 21.6
  - 18.6
  - 15.8
  - 13.1
  - 10.6
  - 8.9
  - 7.8
  - 75.0
  - 18.1

- Other official bilateral and commercial
  - 36.3
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 15.8
  - 4.7

- 4. Multilateral
  - 1607.8
  - 1155.78
  - 1161.48
  - 1166.22
  - 1166.24
  - 1167.3
  - 1164.9
  - 1158.3
  - 1148.6
  - 1142.2
  - 1133.2
  - 1121.2
  - 1105.5
  - 1088.9
  - 1068.2
  - 1046.3
  - 987.0
  - 926.0
  - 86
  - 2.6
  - 796.8
  - 729.0
  - 1197.5
  - 973.2

- IDA
  - 1171.9
  - 844.7
  - 853.1
  - 860.7
  - 864.2
  - 866.4
  - 866.5
  - 865.2
  - 861.5
  - 856.9
  - 851.4
  - 844.3
  - 836.4
  - 828.2
  - 816.5
  - 804.2
  - 754.6
  - 703.6
  - 650.6
  - 595.5
  - 538.7
  - 887.5
  - 737.3

- IMF
  - 41.328.723.919.715.212.09.16.12.91.50.00.00.00.00.00.00.00.00.00.00.0
  - 14.6
  - 0.0

- African Development Bank Group
  - 259.7
  - 195.8
  - 199.0
  - 202.1
  - 205.1
  - 208.1
  - 211.1
  - 214.5
  - 217.3
  - 220.3
  - 223.3
  - 224.6
  - 219.1
  - 213.0
  - 206.3
  - 199.0
  - 191.4
  - 183.6
  - 175.5
  - 16
  - 7.1
  - 158.6
  - 214.2
  - 193.8

- Others
  - 134.9
  - 86.7
  - 85.4
  - 83.7
  - 81.8
  - 80.7
  - 78.1
  - 72.6
  - 66.8
  - 63.4
  - 58.5
  - 52.2
  - 50.1
  - 47.7
  - 45.4
  - 43.1
  - 41.0
  - 38.8
  - 36.5
  - 34.2
  - 31.8
  - 81.2
  - 42.1

### III. After unconditional delivery of enhanced HIPC assistance 3/
- 1. NPV of total debt (2+6) 2/
  - 1272.9
  - 1315.0
  - 1370.4
  - 1417.7
  - 1465.0
  - 1520.6
  - 1580.1
  - 1635.9
  - 1688.6
  - 1749.0
  - 1811.6
  - 1877.0
  - 1948.3
  - 2028.2
  - 2109.9
  - 2197.2
  - 22
  - 53.7
  - 2314.4
  - 2379.3
  - 2449.2
  - 2526.2
  - 1529.7
  - 2208.4

- 2. NPV of outstanding debt (3+4)
  - 1272.9
  - 1255.7
  - 1254.3
  - 1252.7
  - 1246.7
  - 1241.7
  - 1233.5
  - 1221.2
  - 1205.6
  - 1193.4
  - 1178.5
  - 1161.3
  - 1141.2
  - 1120.4
  - 1095.4
  - 1069.
  - 5
  - 1006.8
  - 942.4
  - 875.9
  - 807.8
  - 738.2
  - 1232.4
  - 995.9

- 3. Official bilateral and commercial
  - 104.3
  - 99.9
  - 92.9
  - 86.4
  - 80.5
  - 74.4
  - 68.6
  - 62.9
  - 57.1
  - 51.2
  - 45.3
  - 40.1
  - 35.7
  - 31.5
  - 27.2
  - 23.2
  - 19.8
  - 16.4
  - 13.3
  - 11.0
  - 9.2
  - 74.9
  - 22.
  - 7

- 4. Multilateral
  - 1168.6
  - 1155.8
  - 1161.5
  - 1166.2
  - 1166.2
  - 1167.3
  - 1164.9
  - 1158.3
  - 1148.6
  - 1142.2
  - 1133.2
  - 1121.2
  - 1105.5
  - 1088.9
  - 1068.2
  - 1046.3
  - 987.0
  - 926.0
  - 862.6
  - 7
  - 96.8
  - 729.0
  - 1157.5
  - 973.2

### IV. After bilateral debt relief beyond HIPC assistance 4/
- 1. NPV of total debt (2+6) 2/
  - 1887.2
  - 1233.0
  - 1294.5
  - 1347.3
  - 1399.6
  - 1460.3
  - 1524.7
  - 1585.3
  - 1642.9
  - 1708.3
  - 1775.8
  - 1845.5
  - 1920.3
  - 2003.4
  - 2088.3
  - 2178.6
  - 22
  - 37.9
  - 2301.4
  - 2368.7
  - 2440.3
  - 2518.4
  - 1532.6
  - 2190.3

- NPV of total debt after full delivery 3/
  - 1189.2
  - 1233.0
  - 1294.5
  - 1347.3
  - 1399.6
  - 1460.3
  - 1524.7
  - 1585.3
  - 1642.9
  - 1708.3
  - 1775.8
  - 1845.5
  - 1920.3
  - 2003.4
  - 208
  - 8.3
  - 2178.6
  - 2237.9
  - 2301.4
  - 2368.7
  - 2440.3
  - 2518.4
  - 1469.2
  - 2190.3

- Multilateral
  - 1168.6
  - 1155.8
  - 1161.5
  - 1166.2
  - 1166.2
  - 1167.3
  - 1164.9
  - 1158.3
  - 1148.6
  - 1142.2
  - 1133.2
  - 1121.2
  - 1105.5
  - 1088.9
  - 1068.2
  - 1046.3
  - 987.0
  - 926.0
  - 862.6
  - 796.
  - 8
  - 729.0
  - 1157.5
  - 973.2

- Bilateral
  - 20.6
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 14.3
  - 4.7

- 2. NPV of outstanding debt (3+4)
  - 1887.2
  - 1173.7
  - 1178.5
  - 1182.3
  - 1181.3
  - 1181.4
  - 1178.1
  - 1170.7
  - 1160.0
  - 1152.7
  - 1142.7
  - 1129.8
  - 1113.1
  - 1095.6
  - 1073.8
  - 1050.
  - 9
  - 991.0
  - 929.4
  - 865.3
  - 798.8
  - 730.4
  - 1235.3
  - 977.8

- 3. Official bilateral and commercial
  - 279.4
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 37.9
  - 4.7

- Paris Club
  - 243.1
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 22.1
  - 0.0

- Other official bilateral and commercial
  - 36.3
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 15.8
  - 4.7

- 4. Multilateral
  - 1607.8
  - 1155.8
  - 1161.5
  - 1166.2
  - 1166.2
  - 1167.3
  - 1164.9
  - 1158.3
  - 1148.6
  - 1142.2
  - 1133.2
  - 1121.2
  - 1105.5
  - 1088.9
  - 1068.2
  - 1046.3
  - 987.0
  - 926.0
  - 862.6
  - 7
  - 96.8
  - 729.0
  - 1197.5
  - 973.2

### V. After possible topping-up of HIPC assistance 4/
- 1. NPV of total debt (2+6) 2/
  - 1887.2
  - 817.1
  - 882.1
  - 948.0
  - 1018.2
  - 1097.0
  - 1181.6
  - 1263.2
  - 1343.2
  - 1430.6
  - 1523.3
  - 1622.5
  - 1736.8
  - 1859.9
  - 1989.3
  - 2126.2
  - 2196.
  - 0
  - 2269.9
  - 2348.1
  - 2430.9
  - 2520.6
  - 1217.4
  - 2110.0

- NPV of total debt after full delivery 3/
  - 1189.2
  - 817.1
  - 882.1
  - 948.0
  - 1018.2
  - 1097.0
  - 1181.6
  - 1263.2
  - 1343.2
  - 1430.6
  - 1523.3
  - 1622.5
  - 1736.8
  - 1859.9
  - 1989.3
  - 2126.2
  - 2196.0
  - 2269.9
  - 2348.1
  - 2430.9
  - 2520.6
  - 1154.0
  - 2110.0

- Multilateral
  - 1168.6
  - 747.1
  - 756.0
  - 773.5
  - 790.9
  - 809.7
  - 827.1
  - 841.2
  - 853.5
  - 868.8
  - 884.6
  - 901.7
  - 925.1
  - 948.1
  - 971.4
  - 995.8
  - 946.8
  - 895.9
  - 843.1
  - 788.2
  - 731.7
  - 847.4
  - 894.
  - 8

- Bilateral and commercial
  - 20.6
  - 10.7
  - 10.1
  - 9.5
  - 9.0
  - 8.4
  - 7.9
  - 7.3
  - 6.8
  - 6.2
  - 5.7
  - 5.1
  - 4.5
  - 3.9
  - 3.3
  - 2.7
  - 2.4
  - 2.0
  - 1.6
  - 1.2
  - 0.8
  - 9.3
  - 2.8

- 2. NPV of outstanding debt (3+4)
  - 1887.2
  - 757.8
  - 766.1
  - 783.0
  - 799.9
  - 818.1
  - 835.0
  - 848.5
  - 860.3
  - 875.1
  - 890.3
  - 906.8
  - 929.6
  - 952.0
  - 974.7
  - 998.5
  - 949.1
  - 897.9
  - 844.
  - 7
  - 789.4
  - 732.5
  - 920.1
  - 897.5

- 3. Official bilateral and commercial
  - 279.4
  - 10.7
  - 10.1
  - 9.5
  - 9.0
  - 8.4
  - 7.9
  - 7.3
  - 6.8
  - 6.2
  - 5.7
  - 5.1
  - 4.5
  - 3.9
  - 3.3
  - 2.7
  - 2.4
  - 2.0
  - 1.6
  - 1.2
  - 0.8
  - 32.8
  - 2.8

- Paris Club
  - 243.1
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 0.0
  - 22.1
  - 0.0

- Other official bilateral and commercial
  - 36.3
  - 10.7
  - 10.1
  - 9.5
  - 9.0
  - 8.4
  - 7.9
  - 7.3
  - 6.8
  - 6.2
  - 5.7
  - 5.1
  - 4.5
  - 3.9
  - 3.3
  - 2.7
  - 2.4
  - 2.0
  - 1.6
  - 1.2
  - 0.8
  - 10.7
  - 2.8

- 4. Multilateral
  - 1168.6
  - 747.1
  - 756.0
  - 773.5
  - 790.9
  - 809.7
  - 827.1
  - 841.2
  - 853.5
  - 868.8
  - 884.6
  - 901.7
  - 925.1
  - 948.1
  - 971.4
  - 995.8
  - 946.8
  - 895.9
  - 843.1
  - 788.2
  - 731.7
  - 847.4
  - 8
  - 94.8

- IDA
  - 835.6
  - 546.2
  - 562.2
  - 578.6
  - 594.9
  - 611.5
  - 628.5
  - 645.8
  - 663.3
  - 681.4
  - 700.2
  - 719.5
  - 739.5
  - 760.5
  - 781.9
  - 804.2
  - 754.6
  - 703.6
  - 650.6
  - 595.5
  - 538.7
  - 640.8
  - 704.9

- IMF
  - 43.317.07.97.67.57.66.85.22.91.50.00.00.00.00.00.00.00.00.00.00.0
  - 9.8
  - 0.0

- African Development Bank Group
  - 199.2
  - 126.1
  - 127.4
  - 128.5
  - 129.6
  - 130.6
  - 131.4
  - 132.7
  - 133.5
  - 134.3
  - 135.0
  - 135.2
  - 137.4
  - 139.7
  - 142.0
  - 144.4
  - 146.8
  - 149.4
  - 152.1
  - 15
  - 4.9
  - 157.9
  - 137.1
  - 146.0

- Others
  - 90.5
  - 57.9
  - 58.5
  - 58.8
  - 58.9
  - 60.0
  - 60.3
  - 57.5
  - 53.8
  - 51.6
  - 49.3
  - 47.0
  - 48.1
  - 47.9
  - 47.5
  - 47.3
  - 45.3
  - 42.9
  - 40.4
  - 37.8
  - 35.2
  - 59.7
  - 43.9

### VI. After MDRI assistance and bilateral debt relief beyond HIPC assistance 4/
- 1. NPV of total debt (2+6) 2/
  - 1887.2
  - 242.3
  - 298.2
  - 345.8
  - 397.3
  - 456.7
  - 520.3
  - 581.8
  - 642.8
  - 710.1
  - 780.2
  - 855.2
  - 943.2
  - 1040.0
  - 1142.5
  - 1251.2
  - 1366.2
  - 1487.0
  - 16
  - 13.5
  - 1746.0
  - 1886.6
  - 623.9
  - 1333.1

- NPV of total debt after full delivery 3/
  - 224.1
  - 242.3
  - 298.2
  - 345.8
  - 397.3
  - 456.7
  - 520.3
  - 581.8
  - 642.8
  - 710.1
  - 780.2
  - 855.2
  - 943.2
  - 1040.0
  - 1142.5
  - 1251.2
  - 1366
  - .2
  - 1487.0
  - 1613.5
  - 1746.0
  - 1886.6
  - 472.7
  - 1333.1

- Multilateral
  - 203.5
  - 165.0
  - 165.2
  - 164.8
  - 163.9
  - 163.7
  - 160.4
  - 154.8
  - 148.5
  - 144.1
  - 137.6
  - 130.9
  - 128.4
  - 125.6
  - 122.4
  - 118.9
  - 115.3
  - 111.7
  - 107.4
  - 102.5
  - 97.2
  - 161.0
  - 116.0

- Bilateral and commercial
  - 20.6
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 14.3
  - 4.7

- 2. NPV of outstanding debt (3+4)
  - 1887.2
  - 183.0
  - 182.2
  - 180.8
  - 179.0
  - 177.8
  - 173.6
  - 167.1
  - 159.9
  - 154.6
  - 147.2
  - 139.5
  - 136.0
  - 132.2
  - 128.0
  - 123.5
  - 119.3
  - 115.0
  - 110.
  - 1
  - 104.5
  - 98.6
  - 326.6
  - 120.7

- 3. Official bilateral and commercial
  - 279.4
  - 17.9
  - 17.0
  - 16.1
  - 15.1
  - 14.1
  - 13.2
  - 12.3
  - 11.4
  - 10.5
  - 9.6
  - 8.6
  - 7.6
  - 6.6
  - 5.6
  - 4.6
  - 4.0
  - 3.4
  - 2.7
  - 2.1
  - 1.4
  - 37.9
  - 4.7

- 4. Multilateral
  - 1168.6
  - 165.0
  - 165.2
  - 164.8
  - 163.9
  - 163.7
  - 160.4
  - 154.8
  - 148.5
  - 144.1
  - 137.6
  - 130.9
  - 128.4
  - 125.6
  - 122.4
  - 118.9
  - 115.3
  - 111.7
  - 107.4
  - 102.5
  - 97.2
  - 248.8
  - 11
  - 6.0

### VII. After MDRI and possible topping-up assistance 5/
- 1. NPV of total debt (2+6) 2/
  - 1887.2
  - 180.1
  - 239.5
  - 293.0
  - 354.0
  - 426.9
  - 508.4
  - 587.4
  - 666.0
  - 750.8
  - 841.4
  - 940.1
  - 1056.6
  - 1181.8
  - 1313.8
  - 1453.1
  - 1596.8
  - 1741.8
  - 1
  - 889.8
  - 2039.8
  - 2194.0
  - 612.2
  - 1540.8

- NPV of total debt after full delivery 3/
  - 169.6
  - 180.1
  - 239.5
  - 293.0
  - 354.0
  - 426.9
  - 508.4
  - 587.4
  - 666.0
  - 750.8
  - 841.4
  - 940.1
  - 1056.6
  - 1181.8
  - 1313.8
  - 1453.1
  - 159
  - 6.8
  - 1741.8
  - 1889.8
  - 2039.8
  - 2194.0
  - 456.1
  - 1540.8

- Multilateral
  - 149.0
  - 110.1
  - 111.5
  - 112.8
  - 114.0
  - 116.1
  - 117.7
  - 116.7
  - 113.8
  - 111.5
  - 109.0
  - 108.0
  - 111.2
  - 112.9
  - 114.5
  - 116.2
  - 116.4
  - 113.2
  - 109.5
  - 105.2
  - 100.5
  - 116.6
  - 110.8

- Bilateral and commercial
  - 20.6
  - 10.7
  - 10.1
  - 9.5
  - 9.0
  - 8.4
  - 7.9
  - 7.3
  - 6.8
  - 6.2
  - 5.7
  - 5.1
  - 4.5
  - 3.9
  - 3.3
  - 2.7
  - 2.4
  - 2.0
  - 1.6
  - 1.2
  - 0.8
  - 9.3
  - 2.8

- 2. NPV of outstanding debt (3+4)
  - 1887.2
  - 120.8
  - 121.6
  - 122.4
  - 123.0
  - 124.5
  - 125.5
  - 124.1
  - 120.5
  - 105.1
  - 114.7
  - 113.1
  - 115.7
  - 116.9
  - 117.8
  - 119.0
  - 118.7
  - 115.2
  - 111.
  - 1
  - 106.4
  - 101.3
  - 280.9
  - 113.5

- 3. Official bilateral and commercial
  - 279.4
  - 10.7
  - 10.1
  - 9.5
  - 9.0
  - 8.4
  - 7.9
  - 7.3
  - 6.8
  - 6.2
  - 5.7
  - 5.1
  - 4.5
  - 3.9
  - 3.3
  - 2.7
  - 2.4
  - 2.0
  - 1.6
  - 1.2
  - 0.8
  - 32.8
  - 2.8

*Italic: Source: _cr06420 - 1. NPV of total debt (2+6) 2/ (PDF content provided)*

### 4. Multilateral

### 4. Multilateral

### Overview: Multilateral components of external debt and service projections
- Multilateral stock (selected series as presented): 1168.6; 110.1; 111.5; 112.8; 114.0; 116.1; 117.7; 116.7; 113.8; 98.9; 109.0; 108.0; 111.2; 112.9; 114.5; 116.2; 116.4; 113.2; 109.5; 105.2; 100.5; 208.1; 11; 0.8
- IDA series (selected): 835.6; 35.8; 36.7; 38.0; 39.2; 40.5; 41.9; 43.5; 44.6; 45.8; 47.2; 48.8; 50.6; 52.2; 53.8; 55.4; 57.2; 56.1; 54.5; 52.4; 50.0; 44.9; 42.3
- IMF series (selected): 43.3; 2.9; 2.9; 3.0; 3.1; 3.2; 3.3; 3.5; 2.9; 1.5; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0; 0.0
- African Development Bank Group (selected): 199.2; 13.6; 13.3; 13.0; 12.7; 12.4; 12.1; 12.3; 12.4; 12.5; 12.2; 12.6; 12.9; 13.2; 13.5; 13.9; 14.2; 14.6; 15.0; 15.4; 14.5; 14.0
- "Others" (selected): 90.5; 57.9; 58.5; 58.8; 58.9; 60.0; 60.3; 57.5; 53.8; 51.6; 49.3; 47.0; 48.1; 47.9; 47.5; 47.3; 45.3; 42.9; 40.4; 37.8; 35.2; 29.9; 27.2

### Table 10 — External debt service after full implementation of debt‑relief mechanisms, 2006–2025 (highlights)
- I. After traditional debt‑relief mechanisms: Total debt service (including new debt) 2006–2025 (selected years):
  - 2006: 127.9
  - 2007: 123.0
  - 2008: 113.8
  - 2009: 117.2
  - 2010: 116.1
  - 2015: 137.7
  - 2020: 142.1
  - 2025: 155.7
- I. Multilateral debt service (selected years):
  - 2006: 101.3
  - 2007: 97.1
  - 2008: 88.6
  - 2009: 93.0
  - 2010: 92.8
  - 2015: 103.7
  - 2020: 103.7
  - 2025: 102.3
- I. IDA (multilateral component) debt service (selected years):
  - 2006: 53.0
  - 2007: 55.3
  - 2008: 57.4
  - 2009: 63.6
  - 2010: 66.1
  - 2015: 77.5
  - 2020: 83.4
  - 2025: 82.5
- I. IMF debt service (selected years):
  - 2006: 25.9
  - 2007: 19.4
  - 2008: 7.8
  - 2009: 6.0
  - 2010: 3.8
  - 2015: 0.0
  - 2025: 0.0
- II. After enhanced HIPC assistance: Total debt service (including new debt) (selected years):
  - 2006: 70.6
  - 2007: 54.8
  - 2008: 55.8
  - 2009: 60.8
  - 2010: 60.4
  - 2015: 84.4
  - 2020: 96.0
  - 2025: 152.0
- V. After MDRI assistance and bilateral debt relief beyond HIPC (selected years):
  - Total debt service (including new debt):
    - 2006: 44.2
    - 2007: 5.7
    - 2008: 6.5
    - 2009: 7.6
    - 2010: 8.6
    - 2015: 24.0
    - 2020: 35.0
    - 2025: 56.2
  - Multilateral component (selected years):
    - 2006: 39.5
    - 2007: 1.9
    - 2008: 2.1
    - 2009: 2.3
    - 2010: 2.6
    - 2015: 3.7
    - 2020: 4.6
    - 2025: 5.8
- Memorandum item — Debt service of new debt (selected years):
  - 2006: 1.1
  - 2007: 1.9
  - 2008: 2.7
  - 2009: 3.5
  - 2010: 4.3
  - 2015: 18.8
  - 2020: 34.1
  - 2025: 49.7

### Table 11 — External debt indicators, 2005–2025 (selected indicators and projections)
- After traditional debt‑relief mechanisms:
  - NPV of debt‑to‑GDP ratio (selected years): 2005: 91.7; 2006: 87.1; 2010: 67.7; 2015: 50.4; 2020: 39.7; 2025: 32.6
  - NPV of debt‑to‑exports ratio (selected years): 2005: 366.8; 2006: 339.4; 2010: 284.1; 2015: 203.5; 2020: 152.9; 2025: 119.7
  - NPV of debt‑to‑revenue ratio (selected years): 2005: 365.6; 2006: 350.2; 2010: 285.9; 2015: 212.9; 2020: 160.6; 2025: 137.5
  - Debt service‑to‑exports ratio (selected years, fragmented in source): 20.8; 19.3; 17.3; 17.3; 15.7; 15.1; 15.1; 14.9; 13.6; 12.8; 12.0; 10.3; 9.5; 9.3; 8.8; 8.4; 8.0; 7.6; 7.2; 6.8
  - Debt service‑to‑revenue ratio (selected years, fragmented in source): 23.4; 22.1; 18.9; 18.4; 16.9; 16.4; 16.5; 16.5; 15.2; 14.4; 13.6; 11.8; 11.0; 10.9; 10.3; 10.0; 9.6; 9.2; 8.8; 8.4
- After delivery of enhanced HIPC assistance (selected):
  - NPV of debt‑to‑GDP ratio: 2006: 59.9; 2010: 52.5; 2015: 44.8; 2020: 39.1; 2025: 32.3
  - NPV of debt‑to‑exports ratio: 2006: 233.3; 2010: 220.1; 2015: 180.6; 2020: 150.5; 2025: 124.2
  - Debt service‑to‑exports ratio (fragment): 11.5; 8.6; 8.6; 8.5; 9.0; 8.2; 8.0; 7.6; 7.3; 7.0; 6.6; 8.6; 6.9
- After unconditional delivery of MDRI and bilateral debt relief beyond HIPC (selected):
  - NPV of debt‑to‑GDP ratio (projected path): 10.8; 11.0; 13.0; 13.9; 14.8; 15.8; 16.7; 17.5; 18.1; 18.7; 19.3; 19.8; 20.4
  - NPV of debt‑to‑exports ratio (projected path, selected): 43.2; 43.0; 49.3; 54.4; 60.5; 66.1; 70.5; 72.8; 74.5; 76.3; 77.8
  - Debt service‑to‑exports ratio (fragment): 7.2; 0.9; 1.0; 1.1; 1.2; 1.4; 1.9; 2.3; 2.2; 2.2; 2.1; 2.1
- Memorandum items (selected levels in millions of U.S. dollars):
  - NPV of debt after enhanced HIPC assistance (selected years): 2005: 1887.2; 2006: 1315.0; 2010: 1520.6; 2015: 1811.6; 2020: 2197.2; 2025: 2526.2
  - GDP (selected years): 2005: 2075.6; 2006: 2194.5; 2010: 2898.9; 2015: 4047.1; 2020: 5623.2; 2025: 7813.0
  - Exports of goods and services (annual, selected): 2005: 565.7; 2006: 614.451; 2010: 737.9; 2015: 1079.3; 2020: 1571.1; 2025: 2287.1
  - Government revenue (selected years): 2005: 520.6; 2006: 546.2; 2010: 686.7; 2015: 958.7; 2020: 1332.0; 2025: 1850.7

### Table 12 — Enhanced HIPC Initiative assistance levels and possible topping‑up (completion point estimates)
- Assistance at Decision Point (end‑1999): NPV of debt 1466.5; 3‑year exports moving average 546.8; NPV of assistance 646.3; NPV of debt after assistance 820.2; NPV of debt‑to‑exports ratio (in percent) 150%; Common Reduction Factor 44.1%
- Completion Point Estimates:
  - NPV after enhanced HIPC assistance (end‑2005 assumption): 1272.9; 3‑year exports moving average 519.0; NPV of assistance 245.3
  - NPV after bilateral debt relief beyond HIPC: 1189.2; 3‑year exports moving average 519.0; NPV of debt‑to‑exports ratio 229.1
- Calculation of possible topping up assistance (selected):
  - Total NPV after bilateral debt relief beyond HIPC: 1189.2; 3‑year exports moving average 519.0; additional topping up calculation figures: 410.7; 778.4; 150.0; 34.5%
  - Multilateral component: 1168.6; 403.6; 765.0
  - Bilateral and commercial: 20.6; 7.1; 13.5

### Table 13 — Sensitivity analysis, 2005–2025 (baseline and scenarios, selected results)
- Baseline scenario (selected):
  - NPV of debt‑to‑exports ratio path (2005–2025, selected): 363.7; 43.0; 49.3; 54.4; 60.5; 66.1; 70.5; 72.8; 74.5; 76.3; 77.8; 79.1; 80.9; 82.8; 84.3; 85.7; 86.8; 87.6; 88.2; 88.5; 88.8
  - Debt service (baseline, selected): 44.2; 5.7; 6.5; 7.6; 8.6; 11.0; 16.1; 21.1; 22.5; 24.1; 24.0; 22.8; 23.0; 27.0; 31.1; 35.0; 39.6; 44.9; 50.5; 56.2
  - Memo: NPV of debt (millions USD, selected): 1,887.2; 242.3; 298.2; 345.8; 397.3; 456.7; 520.3; 581.8; 642.8; 710.1; 780.2
- Scenario I: Less concessional new borrowing (selected):
  - NPV of debt‑to‑exports ratio (selected): 363.7; 43.0; 57.5; 64.6; 72.0; 77.3; 79.4; 79.8; 80.7; 82.4; 84.5; 87.0; 90.7; 94.3; 97.6; 100.6; 103.5; 106.4; 109.5; 113.0; 116.6
  - Debt service (selected): 44.2; 9.7; 12.4; 14.8; 16.7; 24.5; 34.7; 44.6; 50.4; 55.2; 57.3; 53.7; 54.1; 60.8; 70.8; 84.3; 102.2; 121.5; 141.8; 163.7
  - Memo: NPV of debt (millions USD, selected): 1,887.2; 242.3; 348.4; 410.6; 472.9; 534.3; 586.2; 638.2; 696.4; 767.1; 847.6
- Scenario II: Higher borrowing and weak export performance (selected):
  - NPV of debt‑to‑exports ratio (selected): 363.7; 43.0; 49.3; 54.4; 60.5; 69.3; 78.8; 88.1; 98.2; 110.0; 123.1; 137.9; 145.3; 152.9; 160.2; 167.1; 173.7; 179.9; 185.6; 191.0; 196.1
  - Memo: NPV of debt (millions USD, selected): 1,887.2; 242.3; 298.2; 345.8; 397.3; 474.2; 565.7; 667.2; 781.8; 919.6; 1,080.4
- Scenario III: Periodic droughts (selected):
  - NPV of debt (millions USD, selected): 1,887.2; 242.3; 298.2; 345.8; 397.3; 479.9; 517.5; 576.9; 635.3; 699.3; 817.5
- Scenario IV: Scaling up of aid (selected):
  - NPV of debt (millions USD, selected): 1,887.2; 242.3; 298.2; 345.8; 397.3; 513.0; 710.0; 920.5; 1,041.5; 1,173.6; 1,313.9

### Table 14–15 — Delivery of IMF and IDA assistance under HIPC and MDRI (selected operational figures)
- IDA projected stock outstanding at implementation date (Table 14/15 context): 1,908.0 (projection reference)
- Remaining IDA credits after MDRI debt relief (selected): 103.6
- Debt stock reduction on eligible credits (without topping‑up, selected):
  - Due to HIPC relief: 423.2
  - Due to MDRI: 1,381.1
- With possible topping‑up (selected):
  - Debt stock reduction on eligible credits at completion point: 1,804.4
  - Due to HIPC relief: 391.6
  - Due to Topping‑up: 345.0
  - Due to MDRI: 1,067.7
- IDA debt service due after HIPC relief and the MDRI (selected, in million USD): 18.5; 0.8; 1.0; 1.3; 1.5; 1.7; 1.6; 2.1; 2.6; 2.8; 2.8; 2.8; 3.0; 3.2; 3.4; 3.7
- IDA debt service relief under the MDRI (selected, Table 14): 9.1; 28.5; 29.3; 33.3; 34.5; 36.5; 38.1; 39.9; 40.2; 40.7; 42.0; 42.6; 42.4; 45.3; 45.2; 40.8

### Table 16 — Creditor participation under the enhanced HIPC Initiative (selected entries)
- The World Bank Group (IDA/IBRD): Debt relief (US$ million) 330.9; Amended in NPV terms 333.3; Percentage of total assistance 51.5; Modalities: Yes. Note: "Interim IDA assistance is being delivered through a 55.3% reduction of IDA debt service until end‑September 2006 and through a 55.9% reduction thereafter. Total debt relief is to be provided over 20 years, ending 2020."
- AfDB Group: 70.9; 70.5; 11.0; Yes. "Interim assistance was provided equal to 80.0% debt service reduction until October 2004."
- IMF: 30.1; 30.3; 4.7; Yes. "The IMF provided interim assistance in 2001 and from 2003 onwards. HIPC relief is provided through grants from the PRGF/HIPC Trust to Malawi's Umbrella Account until 2009."
- EU/EIB: 28.7; 27.4; 4.5; Yes.
- IFAD: 11.3; 11.4; 1.8; Yes.
- PTA Bank: 6.5; 7.4; 1.0; No. ("No debt relief provided. PTA Bank suit the Government of the Republic of Malawi in December 1999. Consequently, the Malawian authorities repaid all debt outstanding to the PTA Bank.")
- Total multilateral (selected totals): 480.0; 482.1; 74.7
- Paris Club creditors total (selected): 128.5; 141.2; 20.0; Yes. "Cologne flow provided during interim period. Stock‑of‑debt operation under Cologne terms is expected at completion point."
- Total bilateral and commercial (selected): 162.6; 164.2; 25.3
- Total assistance (selected): 642.6; 646.3; 100.0

### Table 17–18 — Paris Club delivery modalities and HIPC country status (selected)
- Paris Club table summarizes creditor practices (e.g., many creditors provide 100 percent ODA cancellation; modalities vary by creditor and by flow vs. stock).
- Table 18 lists HIPC cases and estimated assistance levels (selected country entries):
  - Malawi (Decision point reached under enhanced framework): Decision point Dec. 00; Floating Completion Point; Target (in percent) 150; Estimated NPV of Debt‑to‑Exports/Revenue/Assistance levels (selected): NPV of debt 643; 3‑year exports moving average 163; NPV of assistance 480; NPV of debt after assistance 30 (ratio); Bilateral and multilateral shares: 331; 44; Nominal debt relief (U.S. dollars) 1,000

### Key operational notes and assumptions (as stated in source)
- All debt indicators refer to public and publicly guaranteed external debt only and assume a stock‑of‑debt operation on Naples terms (67 percent NPV reduction) at end‑1999 with a cutoff‑date of January 1, 1982, and at least comparable action by other official bilateral creditors.
- Discounting: "Discounted on the basis of the average six‑month commercial interest reference rate for the respective currency as of end‑December 2005."
- Currency conversion: "The conversion of currency‑specific NPVs into U.S. dollars occurs for all years at the base date exchange rate (December 2005)."
- MDRI and topping‑up definitions: tables distinguish outcomes "After enhanced HIPC assistance", "After bilateral debt relief beyond HIPC", "After possible topping‑up of HIPC assistance", "After MDRI Assistance and bilateral debt relief beyond HIPC", and "After MDRI and possible topping‑up of HIPC assistance", with corresponding debt‑service and NPV paths reported.
- Exports of goods and services are defined per IMF, Balance of Payments Manual, 5th edition, 1993; NPV of debt‑to‑exports ratios based on three‑year averages as specified in footnotes.

_Compiled from: Malawian authorities; and Bank‑Fund (IDA/IMF) staff estimates and projections as presented in the source tables._

### 1. Malawi’s risk of debt distress after debt relief under the HIPC Initiative and the

### 1. Malawi’s risk of debt distress after debt relief under the HIPC Initiative and the Multilateral Debt Relief Initiative (MDRI)

### Summary assessment
- Malawi’s risk of debt distress after HIPC and MDRI is moderate.
- On reaching the HIPC Completion Point:
  - NPV of external debt-to-exports ratio drops from 191 percent in 2005 to 39 percent in 2006.
  - NPV of external debt-to-GDP ratio drops from 52 percent in 2005 to 11 percent in 2006 (projected), then increases toward 24 percent by the end of the projection period.
  - Debt service as a share of exports declines from 22 percent in 2005 to 16.2 percent in 2006 (also noted as 16 percent in projection discussion), and is projected to remain on average at 4.1 percent throughout the projection period.
- Despite these improvements Malawi remains vulnerable to exogenous shocks and to failure to implement reforms (growth, export diversification, governance).
- Malawi’s high domestic debt increases vulnerability to exogenous shocks (domestic debt vulnerability does not affect the risk rating).

### External debt sustainability analysis
- Macroeconomic framework assumptions:
  - Annual output growth projected to be about 6 percent over the near term, dropping to 4.5 percent over the longer term.
  - Export share of the economy assumed to increase from 27 percent in 2005 to 30 percent by the end of the projection period.
  - Net official assistance assumed to increase gradually by about 2 percent of GDP to about 23 percent of GDP in 2015.
  - After HIPC completion and MDRI, about 84 percent of total aid (excluding HIPC debt relief grants) is assumed to be provided as grants; loans share around 3.8 percent.
- Baseline projections (Figure 1; Table 1):
  - NPV of debt-to-exports: 191 percent in 2005 → 39 percent in 2006 → 81 percent by 2026.
  - NPV of debt-to-GDP: 52 percent in 2005 → 11 percent in 2006 → 24 percent by end of projection period.
  - Debt service to exports: 22 (2005) → 16 percent (2006), average 4.1 percent over projection period.
  - Possible “topping-up” of HIPC assistance would further reduce debt burden indicators in 2004, but would reduce MDRI relief provided by IDA and thus increase IDA’s allocation to Malawi, leading to a slight increase in medium-term debt burden indicators relative to baseline.
- Stress tests and alternative scenarios:
  - Failure to implement reforms, lack of donor grant financing, and exogenous shocks would substantially deteriorate debt burden indicators.
  - If key macroeconomic variables revert to historical averages (GDP growth, current account deficit, and FDI inflows), debt stock indicators would breach thresholds within a decade.
  - Scaling up aid financed through concessional debt (instead of grants) would cause debt stock indicators to approach thresholds toward the end of the projection period.
  - Under the most extreme stress test, Malawi’s NPV of debt-to-GDP ratio breaches its indicative threshold by 2011 for a sustained period; NPV of debt-to-exports ratio also approaches its threshold.

### Public debt sustainability analysis
- Domestic debt:
  - Domestic debt reached almost 25 percent of GDP in 2003/04 with interest costs of 9 percent of GDP.
  - By end of FY05/06 government expected to reduce domestic debt below 20 percent of GDP and domestic interest costs to about 5.5 percent of GDP.
  - Baseline assumes further reduction to below 10 percent of GDP in domestic debt and interest payments to about 2 percent of GDP; longer-term target a stable domestic debt burden of about 2 percent of GDP at a cost of less than 0.5 percent of GDP in interest payments.
- Public debt stock projections:
  - Public debt stock expected to drop from 159 percent of GDP in 2005 to 37 percent of GDP in 2006 as a result of HIPC and MDRI.
  - Projected to decline and bottom out around 32 percent at the turn of the decade.
  - NPV of public debt projected to decline from 74 percent of GDP in 2005 to around 18 percent of GDP at the end of the decade.
- Vulnerabilities:
  - Deterioration in external or domestic debt indicators could reverse projected improvements.
  - Failure to implement reforms or insufficient donor grant financing could lead to renewed accumulation of domestic debt.
  - A reversion to the historical 1999–2003 pattern (real GDP growth averaged below 2 percent; primary deficit including grants averaged about 2 percent of GDP) would retard domestic debt reduction and cause public debt indicators to worsen even under assumed external support.
  - Under the most extreme stress test, NPV of public debt-to-GDP would continue to rise indefinitely.

### Conclusion
- HIPC completion point and MDRI provide large near-term reductions in Malawi’s external and public debt burden, but:
  - Sustained macroeconomic reforms, export diversification, strengthened governance, and continued donor grant support are critical to maintain debt sustainability.
  - Significant residual vulnerability remains from exogenous shocks and high domestic debt; adverse scenarios can quickly reverse gains and breach debt thresholds.

*Source: _cr06420 - 1. Malawi’s risk of debt distress after debt relief under the HIPC Initiative and the Multilateral Debt Relief Initiative (MDRI).*

### 8. Even after full delivery of HIPC debt relief and implementation of the MDRI,

### _cr06420 - 8. Even after full delivery of HIPC debt relief and implementation of the MDRI,

### Impact of HIPC completion and MDRI on debt-risk classification
- On reaching the HIPC Completion Point, Malawi’s NPV of debt-to-exports ratio will drop from 191 percent in 2005 to 41 percent in 2006.
- Debt service as a share of exports will decline from 22 to 16 percent between 2005 and 2006.
- Topping-up of HIPC assistance would decrease the NPV of debt-to-exports ratio further to 31 percent and the debt service-to-exports to 5.1 percent in 2006, but would not change Malawi’s risk of debt distress classification (remains at moderate risk).
- Notwithstanding good policy performance, debt stock indicators are projected to increase during the projection period and to breach their policy-dependent thresholds if key macroeconomic variables assume their historical average.
- The NPV of debt-to-GDP ratio would breach its threshold under stress tests.
- Domestic debt, although projected to decline, is currently high, increasing Malawi’s probability of debt distress.
- Policy implications highlighted: prudent use of resources freed by debt relief and strengthening public expenditure management are important; contracting new loans on less concessional terms or shifting from grants to loans would significantly deteriorate Malawi’s debt sustainability outlook.

### Key baseline indicators and projections (selected)
- External debt (nominal): 158.9 (2003), 148.1 (2004), 136.8 (2005), 20.1 (2006), 23.6 (2007), 25.3 (2008), 26.8 (2009), 28.4 (2010), 29.7 (2011), 35.3 (2006-11 Average), 39.8 (2016), 42.3 (2021).
- Change in external debt: 15.6 (2003), -10.8 (2004), -11.3 (2005), -116.7 (2006), 3.5 (2007), 1.7 (2008), 1.5 (2009), 1.5 (2010), 1.3 (2011), 1.1 (2006-11 Average), 0.7 (2016), 0.4 (2021).
- Identified net debt-creating flows: 18.9 (2003), -4.5 (2004), -7.7 (2005), -4.6 (2006), -0.7 (2007), -1.6 (2008), -0.3 (2009), 2.1 (2010), 1.5 (2011), 1.1 (2006-11 Average), 0.9 (2016), 0.6 (2021).
- Non-interest current account deficit: 6.1 (2003), 7.8 (2004), 4.6 (2005), 5.5 (2006), 3.9 (2007), 6.7 (2008), 1.4 (2009), 0.7 (2010), 2.3 (2011), 4.6 (2006-11 Average), 4.0 (2016), 3.3 (2021).
- Exports (percent of GDP): 27.2 (2003), 26.8 (2004), 27.3 (2005), 28.0 (2006), 27.7 (2007), 26.4 (2008), 25.2 (2009), 25.5 (2010), 25.7 (2011), 26.9 (2006-11 Average), 28.2 (2016), 29.5 (2021).
- Imports (percent of GDP): 49.7 (2003), 51.2 (2004), 52.0 (2005), 52.8 (2006), 49.7 (2007), 46.2 (2008), 46.4 (2009), 48.5 (2010), 48.1 (2011), 49.1 (2006-11 Average), 50.3 (2016), 51.6 (2021).
- Net FDI (negative = inflow): -2.4 (2003), -2.3 (2004), -1.3 (2005), -1.8 (2006), 0.5 (2007), -1.4 (2008), -1.4 (2009), -1.4 (2010), -1.3 (2011), -1.4 (2006-11 Average), -1.5 (2016), -1.4 (2021).
- Endogenous debt dynamics (contribution): 15.3 (2003), -10.0 (2004), -11.1 (2005), -9.9 (2006), -0.7 (2007), -0.9 (2008), -1.2 (2009), -1.1 (2010), -1.1 (2011), -1.2 (2006-11 Average), -1.3 (2016), -1.4 (2021).
- Contribution from nominal interest rate: 1.5 (2003), 1.5 (2004), 1.3 (2005), 1.0 (2006), 0.4 (2007), 0.4 (2008), 0.2 (2009), 0.2 (2010), 0.2 (2011), 0.3 (2006-11 Average), 0.4 (2016), 0.4 (2021).
- Contribution from real GDP growth: -9.5 (2003), -10.5 (2004), -3.7 (2005), -10.9 (2006), -1.1 (2007), -1.3 (2008), -1.4 (2009), -1.4 (2010), -1.3 (2011), -1.4 (2006-11 Average), -1.6 (2016), -1.8 (2021).
- Residual (3-4): -3.3 (2003), -6.3 (2004), -3.6 (2005), -112.1 (2006), 4.2 (2007), 3.3 (2008), 1.8 (2009), -0.5 (2010), -0.2 (2011), -0.1 (2006-11 Average), -0.1 (2016), -0.2 (2021).
- Debt service-to-exports ratio (in percent): 21.8 (2003), 22.9 (2004), 21.5 (2005), 16.2 (2006), 6.4 (2007), 6.0 (2008), 5.1 (2009), 4.5 (2010), 4.4 (2011), 3.4 (2006-11 Average), 2.3 (2016), 2.5 (2021).
- NPV of external debt (in percent of exports): 190.9 (2005), 39.0 (2006), 46.7 (2007), 52.3 (2008), 58.1 (2009), 60.8 (2010), 62.5 (2011), 70.2 (2016), 77.9 (2021), 81.4 (2026).
- NPV of PPG external debt (percent of exports): same series as NPV of external debt above (190.9 in 2005; 39.0 in 2006; 46.7 in 2007; 52.3 in 2008; 58.1 in 2009; 60.8 in 2010; 62.5 in 2011; 70.2 in 2016; 77.9 in 2021; 81.4 in 2026).
- Total gross financing need (billions of U.S. dollars): 168.9 (2003), 221.9 (2004), 190.8 (2005), 217.2 (2006), 41.6 (2007), 22.1 (2008), 59.2 (2009), 126.3 (2010), 114.6 (2011), 138.1 (2006-11 Average), 167.8 (2016), 223.8 (2021).
- Non-interest current account deficit that stabilizes debt ratio: -9.5 (2003), 18.6 (2004), 15.9 (2005), 123.4 (2006), -2.1 (2007), -1.0 (2008), 0.7 (2009), 3.1 (2010), 2.7 (2011), 3.0 (2006-11 Average), 3.7 (2016), 4.5 (2021).

### Public-sector debt indicators (selected)
- Public sector debt (percent of GDP): 169.9 (2003), 172.5 (2004), 158.6 (2005), 37.4 (2006), 37.4 (2007), 34.6 (2008), 31.9 (2009), 31.0 (2010), 31.7 (2011), 37.3 (2006-11 Average), 41.8 (2016), 44.3 (2021).
- NPV of public sector debt (percent of GDP): 90.6 (2003), 91.0 (2004), 73.9 (2005), 28.3 (2006), 26.7 (2007), 23.2 (2008), 19.7 (2009), 18.1 (2010), 18.1 (2011), 20.9 (2006-11 Average), 24.0 (2016), 26.0 (2021).
- NPV of public sector debt-to-revenue ratio (in percent): 287.0 (2003), 249.9 (2004), 176.0 (2005), 66.9 (2006), 66.1 (2007), 59.4 (2008), 51.3 (2009), 47.2 (2010), 47.2 (2011), 55.0 (2006-11 Average), 63.6 (2016), 69.7 (2021).
- Debt service-to-revenue ratio (in percent): 41.9 (2003), 38.2 (2004), 28.9 (2005), 21.5 (2006), 14.1 (2007), 10.8 (2008), 8.0 (2009), 5.8 (2010), 4.3 (2011), 3.1 (2006-11 Average), 2.6 (2016), 1.3 (2021).

### Scenarios and stress tests (figures referenced)
- Figure summaries indicate alternative scenario projections for 2006-2026 under:
  - Baseline without topping-up
  - Baseline with topping-up
  - Scaling up scenario
  - Historical scenario
  - Most extreme stress test (the test that yields highest ratio in 2016)
- Key indicators shown under alternative scenarios: NPV of debt-to-GDP ratio; NPV of debt-to-exports ratio; Debt service-to-exports ratio; NPV of Debt-to-Revenue Ratio; Debt Service-to-Revenue Ratio.

### External debt management: institutional and operational issues
- Legal/institutional roles:
  - Public Finance Management Act: Minister of Finance (MoF) is the only authority to contract external debt.
  - Debt and Aid Management Division (DAD) of the MoF: responsible for managing and recording external debt.
  - Reserve Bank of Malawi (RBM): fiscal agent responsible for making payments to external creditors upon receipt of payment instructions from the MoF.
- Data recording and reporting weaknesses:
  - External debt data and HIPC debt relief provided by creditors is reconciled on an ad-hoc basis, causing inaccurate forecasts of debt servicing obligations and discrepancies between budget estimates and actual debt service payments due.
  - Weak archiving practices make data reconciliation cumbersome; summary checks are not undertaken regularly.
  - Reports on external debt are not published regularly.
- Strategic and capacity gaps:
  - Malawi lacks a comprehensive debt management strategy; limited formal coordination between cash management, debt management and overall budgeting.
  - Government increased the share of domestic debt to meet financing needs but does not analyze costs or risks of different financing options nor formulate a medium-term debt management strategy.
  - The DAD lacks trained staff; few staff can interpret loan agreements and creditor reports and implement them in the debt recording system.
  - Turnover of trained staff has been high, causing loss of institutional memory and continuity.
  - The DSA also suffers from weak technological infrastructure.
- Suggested capacity-building and technical assistance needs:
  - Technical assistance for building capacity with respect to debt negotiations, formulation of portfolio and debt strategy, and debt sustainability analysis (DSAs) would be useful.

### Key macroeconomic assumptions (selected)
- Real GDP growth (in percent): 6.1 (2003), 7.1 (2004), 2.8 (2005), 2.6 (2006), 3.9 (2007), 8.4 (2008), 5.6 (2009), 6.0 (2010), 6.0 (2011), 5.5 (2006-11 Average), 5.0 (2016), 6.1 (2021), 4.5 (2012-26 Average), 4.5 (2016), 4.5 (2021), 4.5 (2026).
- GDP deflator in US dollar terms (change in percent): -14.0 (2003), 0.6 (2004), 6.2 (2005), 0.2 (2006), 7.7 (2007), -2.5 (2008), -0.8 (2009), 2.0 (2010), 2.0 (2011), 2.2 (2006-11 Average), 2.2 (2016), 2.2 (2021), 2.2 (2026).
- Effective interest rate (percent): 1.0 (2003), 1.0 (2004), 0.9 (2005), 1.0 (2006), 0.1 (2007), 0.8 (2008), 2.0 (2009), 1.8 (2010), 1.0 (2011), 0.9 (2006-11 Average), 0.9 (2016), 1.0 (2021), 1.0 (2026), 0.9 (long-run).
- Growth of exports of G&S (US dollar terms, in percent): 2.1 (2003), 6.2 (2004), 10.8 (2005), 0.2 (2006), 9.2 (2007), 8.6 (2008), 3.5 (2009), 3.3 (2010), 3.2 (2011), 8.8 (2006-11 Average), 8.3 (2016), 6.0 (2021), 7.8 (2012-26 Average and projections).
- Growth of imports of G&S (US dollar terms, in percent): 9.3 (2003), 11.0 (2004), 10.8 (2005), 7.9 (2006), 12.8 (2007), 7.3 (2008), -1.4 (2009), 0.5 (2010), 8.5 (2011), 12.7 (2006-11 Average), 6.4 (2016), 5.7 (2021), 7.2–7.5 (2012-26 Average/projections).
- Grant element of new public sector borrowing (in percent): 37.2 (2006), 34.1 (2007), 36.6 (2008), 39.2 (2009), 40.3 (2010), 41.1 (2011), 38.1 (2006-11 Average), 39.9 (2016), 38.9 (2021), 37.3 (2026), 39.2 (2012-26 Average).

*Source: Bank-Fund staff simulations and Malawi authorities as presented in the document.*

---