### Recent developments and medium-term outlook
- GDP growth:
  - GDP growth is estimated at 11¼ percent in 2012.
  - GDP growth projected at 6¼ percent in 2013.
- Natural resources and production:
  - Petroleum production averaged about 13,000 barrels per day (bpd) in 2012, below the projected 16,000 bpd.
  - Oil exports of refined products averaged about 6,000 bpd instead of the projected 9,000 bpd.
  - Shortfall in government oil revenue in 2012 estimated at CFAF 13 billion (0.4 percent of GDP).
  - Losses for the refinery in 2012 estimated at about 1 percent of GDP.
- Prices and vulnerabilities:
  - Average inflation estimated to have remained slightly below 1 percent in 2012.
  - Economic developments vulnerable to climatic shocks (floods in Q3 2012) and fragile regional security (including instability in Mali).
- Fiscal and external positions:
  - Shortfall in oil and customs revenue equivalent to 2 percent of GDP.
  - Overall fiscal deficit in 2012 (commitment basis, including grants) projected to reach 3½ percent of GDP.
  - Current account deficit excluding official transfers projected to decline from 28 percent of GDP in 2011 to 20 percent of GDP in 2012.
  - Niger’s contribution to the net foreign assets of the monetary union (WAEMU) projected to increase by CFAF 99 billion in 2012.
  - Gross international reserves in the WAEMU stood at the equivalent of about 5 months’ of imports at end-November 2012.
- Monetary and credit:
  - Credit to the private sector expanded by 24 percent (12-month rate) through November 2012.
  - Broad money increased by about 33½ percent during this period.
- Debt and financing:
  - Negotiations with EXIM Bank of China on a concessional loan of US$880 million (CFAF 435 billion, or 12 percent of GDP) are advanced.
  - If ratified, external public debt would increase to 33½ percent of GDP at end-2013 (from 24 percent at end-2012).
  - Under a one-time shock of 30 percent currency depreciation, the debt-to-GDP ratio would rise above the 40 percent threshold; Niger’s risk of debt distress is considered moderate.
- Downside risks:
  - Sustained decline in commodity prices, fragile regional security, climatic shocks and food security concerns, and delays in natural resource project implementation.

### Program implementation in 2012 and prior actions for the first review
- Overall assessment:
  - All end-June performance criteria were met; several end-September fiscal targets were missed as spending increased to restore poverty-reducing spending and for increased military spending.
  - Continuous performance criterion on non-concessional borrowing was breached due to contracting a CFAF 50 billion (1½ percent of GDP) non-concessional loan with the Republic of Congo; the loan was cancelled before any disbursement.
  - Majority of structural reforms implemented, albeit with delays.
- Fiscal execution and shortfalls:
  - A 10 percent shortfall in revenues constrained fiscal implementation.
  - Basic budget balance (excluding grants) in the first six months reached a surplus of CFAF 12.4 billion (about 0.4 percent of annual GDP) vs. a targeted surplus of CFAF 12.5 billion.
  - Revenues about 1 percent of annual GDP below target in H1 2012.
  - Basic budget deficit in Q3 reached CFAF 49.2 billion (about 1½ percent of annual GDP) against a program target of CFAF 14.8 billion.
  - Overall fiscal balance (including grants) in Q3 recorded a deficit of about ¾ percent of GDP rather than a deficit of 1¾ percent under the program.
  - Authorities limited current and capital spending in Q4 2012 to minimize fiscal slippages.
- Structural reform progress and prior actions:
  - Corrective actions: submission of quarterly budget reports, inventory of government bank accounts, assignment of tax identification numbers to importers.
  - Plan to stem refinery losses adopted as a prior action.
  - Prior action implemented: assignment of tax identification numbers to all regular importers for import transactions after January 1, 2013.
- IMF staff position:
  - Staff supports completion of the first review and a waiver for the breach on non-concessional external debt given cancellation with no disbursement.
  - Staff supports disbursement of the second tranche under the ECF arrangement.

### The 2013 program: goals, budget framework, and financing
- Program goals and priorities:
  - Tackle revenue weaknesses; create fiscal space for development spending while maintaining debt sustainability; rebuild government deposits at the central bank; implement structural reforms to strengthen budget execution, treasury management, and domestic revenue collection; enhance oversight of the natural resource sector; continue reforms for financial development and improving the business environment.
- Budgetary framework (parliament adoption: December 2012):
  - Total revenue in 2013 projected to rise by about 1 percentage point of GDP.
  - Total expenditure (excluding net lending related to the new refinery) projected to rise by 3¼ percentage points of GDP.
  - Public wage bill projected to increase by about a ¼ percent of GDP.
  - Fiscal deficit on a commitment basis, excluding grants and net lending, projected to rise from 10 percent of GDP in 2012 to 12 percent of GDP in 2013.
  - Basic fiscal deficit projected to increase from about 2 percent of GDP in 2012 to 2½ percent of GDP in 2013.
- Cash management:
  - Plan to build cash holdings at the BCEAO by CFAF 15 billion in 2013.
  - At end-September 2012, freely available government cash holdings at the BCEAO stood at CFAF 12.6 billion.
- External financing needs (2013):
  - Gross external financing needs projected at some CFAF 480 billion (13 percent of GDP), up from a budgeted CFAF 430 billion in 2012.
  - Concessional project loans and grants projected at CFAF 345 billion.
  - Budget aid for 2013 projected at CFAF 110 billion.
  - IMF would disburse CFAF 25 billion in 2013, assuming conclusion of program reviews as scheduled.
- Non-concessional borrowing policy:
  - Program maintains a zero ceiling on medium-term non-concessional borrowing; non-concessional borrowing warranted only for well-assessed, high-yield commercial and infrastructure projects; staff noted a non-zero ceiling could be considered at the second review if justified.

### Structural reforms and public financial management (PFM)
- Budget and cash-flow management measures:
  - Limit expenditure implemented through exceptional procedures to a maximum of 5 percent of total expenditure.
  - Produce and publish detailed quarterly budget execution reports; produce quarterly cash and commitment plans.
  - Establish a Single Treasury Account.
- Customs administration reforms:
  - Action plan to increase computerization, reinforce controls, step up fight against fraud, and increase operational capacity.
  - Prior action: give all known importers a tax identification number (TIN) — met with delay; TIN granted in January 2013 (new prior action).
  - Measures: implementation of scanners; establishment of customs offices at refinery and mining sites; automation of customs procedures.
- Debt management:
  - Concentrate debt management activities at the Debt Directorate; ensure all new public loans and guarantees analyzed by the National Debt Management Committee.
  - Semiannual reporting on existing debt, new debt contracted, and loans under negotiation.

### Management of natural resources and refinery measures
- SORAZ refinery:
  - SORAZ started operations in November 2011; first-year production about 66 percent of 20,000 bpd capacity.
  - Provisional upstream audit results available; international accountancy firm audit of the refinery to be completed by May 2013.
  - Action plan measures include: refinancing SORAZ, harmonizing supplier credit terms between SORAZ and SONIDEP, clearing SONIDEP arrears (final payment on February 19, 2013), implementing a customs bureau at SORAZ.
  - While audit is completed, selling price of crude and ex-refinery prices for local market set to allow refinery to at least balance its accounts during first half of 2013.
- Oversight and transparency:
  - Opened a customs office at the refinery to improve verification of production and sales.
  - SOPAMIN strengthened representation in mining companies; SOPAMIN to retain role as portfolio manager and remit full dividends to the Treasury.
  - Niger remains a member of EITI; petroleum receipts for 2012 and thereafter to be included in EITI reporting; plans for monthly petroleum sector statistics publication.
- Refinancing and debt implications:
  - Understandings with EXIM Bank of China on concessional loan of US$880 million (CFAF 435 billion, or 12 percent of GDP) to refinance refinery financing.
  - If the loan is ratified and government assumes the liability, stock of public external debt expected to reach about 33.5 percent of GDP in 2013 (from 24 percent in 2012).
  - Non-concessional 40 percent state guarantee on previous financing to be terminated, causing a one-off spike in debt service ratios in 2013.

### Debt Sustainability Analysis (DSA): findings, projections, and stress tests
- Overall assessment:
  - Niger’s risk of debt distress considered moderate.
  - Baseline external debt ratios remain below policy-dependent thresholds throughout 2012–32, but PV of debt-to-GDP and other ratios increase sharply following the Soraz refinancing.
- Key projections and scenarios:
  - Under baseline, PV of debt-to-GDP ratio increases sharply from 2012 to 2013 and continues upward.
  - One-time 30 percent nominal depreciation of the CFA franc in 2013 would cause PV of debt-to-GDP ratio to breach its threshold as early as 2016 and remain above it until 2032.
  - Worsening financing terms would cause PV of debt-to-GDP ratio to breach its threshold from 2020 onwards.
  - Extreme shock (real GDP growth set at historical average minus one standard deviation in 2013–2014) would lead PV of debt-to-GDP and PV of debt-to-revenue ratios to more than double during the projection period.
- Selected numeric indicators (as presented in source tables; sample entries):
  - Public and publicly guaranteed (PPG) external debt (selected): 18.9, 17.0, 22.4, 24.0, 33.5, 34.8, 36.4, 37.8, 38.6, 41.7, 42.1.
  - PV of external debt (selected): 46.6, 49.3, 48.3, 50.4, 52.7, 53.7, 50.0, 38.7, 33.2.
  - PV of PPG external debt (selected): 18.6, 19.4, 25.7, 26.7, 27.9, 28.9, 29.4, 32.4, 34.5.
  - Debt service-to-exports ratio (selected): 3.3, 2.5, 3.2, 5.1, 70.7, 4.1, 3.9, 7.3, 11.8, 7.1, 6.1.
  - Exports (percent of GDP, selected): 20.6, 22.2, 22.2, 25.4, 25.7, 26.4, 25.8, 25.8, 27.2, 34.1, 34.7.
  - Nominal GDP (Billions of US dollars, selected): 5.3, 5.7, 6.3, 6.6, 7.3, 7.9, 8.4, 9.0, 9.7, 14.6, 32.2.
- Policy recommendations from DSA:
  - Limit government involvement in financing natural resource projects.
  - Remain vigilant in seeking concessional new borrowing.
  - Consider non-concessional borrowing only for well-assessed, high-yield commercial and infrastructure projects that will generate sufficient government revenue to cover related debt service.

### Financial sector, private sector development, and business climate
- Financial sector strategy and vulnerabilities:
  - New five-year financial sector development strategy adopted in 2012.
  - Majority foreign-owned banks account for about 80 percent of total assets, deposits, credit to the economy, and offices.
  - Foreign liabilities account for approximately 20 percent of total liabilities of Niger’s banking sector; about 70 percent of these foreign liabilities are toward other WAEMU members.
  - Foreign claims of Nigerien banks increased from about 5 percent to close to 20 percent of total assets in the last two years.
  - Claims of BIS reporting banks on the Nigerien economy around 12 percent of Niger’s deposits.
- Private sector measures for 2013:
  - Establish an agency for development of small- and medium-sized businesses.
  - Simplify procedures to start up a business.
  - Adopt a law on private-public partnerships.
- Business climate and institutional actions:
  - Creation of a special ministry for private sector promotion.
  - Issuance of a charter for small and medium-size enterprises.
  - Measures to simplify business start-up, revise CNIP activities, establish Maison de l’Entreprise, adopt PPP law, and consult on enterprise financing.
  - Niger joined MIGA; FDI eligible for MIGA political risk insurance.

### Monitoring, reporting, and technical assistance
- Program monitoring and reviews:
  - Program monitored through semiannual reviews. Second, third, and fourth program reviews expected in May and November 2013, and May 2014.
  - Staff recommended completion of first review, waiver for nonobservance of non-concessional borrowing criterion, and disbursement of SDR 11.28 million (second tranche).
- Reporting and TMU obligations (timing preserved as in source):
  - Monthly submissions within six weeks after the end of each month for detailed domestic financing, revenue and expenditure, domestic arrears, and list of external loans in negotiation.
  - Monetary data: consolidated balance sheet and monetary survey monthly within eight weeks following end of each month (provisional within eight weeks).
  - Real sector: disaggregated monthly CPI within two weeks following end of each month; national accounts within six months after end of year.
  - External debt details and arrears: monthly within six weeks.
  - Attachment II—Technical Memorandum of Understanding, Niamey, February 28, 2013.
- Technical assistance provided (selected):
  - MCM/AFRITAC W: Public Debt March 2012.
  - FAD: Budget Execution March 2012; Medium-term expenditure framework October 2012 and January 2013.
  - FAD/AFRITAC W: Customs Administration May 2012 and December 2012.
  - STA/AFRITAC W: National Accounts August 2012.
  - Other missions on PFM, tax administration, and fiscal reporting in 2012–2013.
- Data adequacy and statistical work:
  - Data provision has shortcomings but is broadly adequate for surveillance.
  - National accounts compiled with SNA93; rebasing work ongoing.
  - Monetary and balance of payments statistics compiled with lags; plans to adopt WAEMU Directive nº10/2009/CM/UEMOA and migrate to GFSM 2001.

*Source: _cr13104 - EXECUTIVE SUMMARY (IMF staff report, March 13, 2013; supporting TMU and MEFP materials as included in the provided content unit).*

### EXECUTIVE SUMMARY

### _cr13104 - EXECUTIVE SUMMARY

### Recent developments and medium-term outlook
- Economic growth and drivers:
  - GDP growth is estimated at 11¼ percent in 2012, driven by the coming onstream of a new oil project, higher uranium production, and a rebound in agricultural production.
  - Petroleum production averaged about 13,000 barrels per day (bpd) in 2012, below the projected 16,000 bpd (Box 1).
  - Oil exports of refined products averaged about 6,000 bpd instead of the projected 9,000 bpd.
- Inflation and vulnerabilities:
  - Average inflation is estimated to have remained slightly below 1 percent in 2012.
  - Economic developments remain vulnerable to climatic shocks and the fragile regional security situation, including floods in Q3 2012 and instability in Mali; Niger participated in the military operation aimed at restoring sovereignty in northern Mali in January 2013.
- Fiscal and balance of payments outcomes:
  - Fiscal revenues increased relative to 2011 but are likely to fall short of program targets for 2012 due to weaknesses in customs and oil revenue.
  - The shortfall in oil and customs revenue is equivalent to 2 percent of GDP.
  - The overall fiscal deficit in 2012 (commitment basis, including grants) is projected to reach 3½ percent of GDP, very close to the program target.
  - The current account deficit excluding official transfers is projected to decline from 28 percent of GDP in 2011 to 20 percent of GDP in 2012.
  - Niger’s contribution to the net foreign assets of the monetary union (WAEMU) is projected to increase by CFAF 99 billion in 2012.
  - Gross international reserves in the WAEMU stood at the equivalent of about 5 months’ of imports at end-November 2012.
- Monetary and credit developments:
  - Credit to the private sector expanded by 24 percent (12-month rate) through November 2012, driven by high credit demand from public enterprises and trading firms.
  - Broad money increased by about 33½ percent during this period.
- Natural resource sector update and debt implications:
  - Shortfall in government oil revenue in 2012 is estimated at CFAF 13 billion (0.4 percent of GDP).
  - Losses for the refinery in 2012 are estimated at about 1 percent of GDP (covered thus far by the foreign investor and potentially a contingent liability).
  - Negotiations with EXIM Bank of China on a concessional loan of US$880 million (CFAF 435 billion, or 12 percent of GDP) are advanced; if ratified, external public debt would increase to 33½ percent of GDP at end-2013 (from 24 percent at end-2012).
  - Under a one-time shock of 30 percent currency depreciation, the debt-to-GDP ratio would rise above the 40 percent threshold; Niger’s risk of debt distress is considered moderate.
- Growth outlook and risks:
  - GDP growth is projected at 6¼ percent in 2013, in line with the program’s initial projection.
  - Growth projections for 2014 and later years were revised downward due to a two-year delay in the development of a large new uranium mining project in Imouraren.
  - Downside risks include a sustained decline in commodity prices, fragile regional security (including budgetary effects of military participation in Mali), climatic shocks and food security concerns, and delays in natural resource project implementation.

### Program implementation in 2012 and prior actions for the first review
- Overall assessment:
  - Program implementation has been mixed; all end-June performance criteria were met, but several end-September fiscal targets were missed as spending increased to restore poverty-reducing spending and in response to increased military spending.
  - The continuous performance criterion on non-concessional borrowing was breached due to contracting a non-concessional loan with the Republic of Congo, but the loan was cancelled before any disbursement.
  - The majority of structural reforms under the program were implemented, albeit with delays; a plan to stem refinery losses has been developed for implementation in 2013.
- Fiscal execution and shortfalls:
  - A 10 percent shortfall in revenues constrained fiscal implementation.
  - Basic budget balance (excluding grants) in the first six months reached a surplus of CFAF 12.4 billion (about 0.4 percent of annual GDP) vs. a targeted surplus of CFAF 12.5 billion.
  - Revenues were about 1 percent of annual GDP below target in H1 2012, mainly reflecting lower-than-projected oil revenue and weak customs revenue.
  - The basic budget deficit in Q3 reached CFAF 49.2 billion (about 1½ percent of annual GDP) against a program target of CFAF 14.8 billion.
  - The overall fiscal balance (including grants) in Q3 recorded a deficit of about ¾ percent of GDP rather than a deficit of 1¾ percent under the program, reflecting slow externally financed capital spending.
  - Authorities took measures to limit current and capital spending in Q4 2012 to minimize fiscal slippages.
- Non-concessional loan issue:
  - In July 2012, authorities contracted a CFAF 50 billion (1½ percent of GDP) non-concessional budget loan from the Republic of Congo, breaching the performance criterion; the loan was cancelled in December 2012 with no disbursements.
  - Staff supports a waiver for the breach given the cancellation.
- Structural reform progress:
  - After corrective action, the majority of benchmarks through September 2012 were implemented, including submission of quarterly budget reports, inventory of government bank accounts, and assignment of tax identification numbers to importers.
  - The objective to limit non-authorized expenditure to 5 percent of committed expenditure was not achieved, owing to high medical evacuation spending; monitoring of non-authorized spending was strengthened.
  - Delays occurred in closing irregular and dormant bank accounts; a new timetable envisages closure by end-March 2013.
  - A new central-level budget interface to improve budget and cash management was completed; regional implementation remains ongoing.
- Prior actions implemented before staff report issuance:
  - Adoption of an action plan to put the refinery and the oil well on a sound financial footing.
  - Assignment of tax identification numbers to all regular importers for import transactions after January 1, 2013, to strengthen anti-fraud measures.

### Policy discussions and the program for 2013
- Program goals and priorities:
  - The 2013 program builds on the government’s medium-term strategy set out in the Memorandum of Economic and Financial Policies (MEFP) of March 2, 2012.
  - Key goals include tackling revenue weaknesses, creating fiscal space for development spending while maintaining debt sustainability, rebuilding government deposits at the central bank, implementing structural reforms to strengthen budget execution, treasury management, and domestic revenue collection, enhancing oversight of the natural resource sector, and continuing reforms for financial development and improving the business environment.
- Revenue mobilization and oil sector measures:
  - Advance the plan to strengthen the financial position of the oil refinery and implement measures already taken to strengthen customs.
  - Prior actions taken to address oil-sector revenue weaknesses are expected to be consolidated in 2013.
- Fiscal and cash management objectives:
  - Rebuild government deposits at the central bank to facilitate budget execution and enable response to shocks.
  - Create fiscal space for development spending while maintaining debt sustainability.
- Structural reforms and oversight:
  - Implement structural reforms to strengthen budget execution, treasury management, and domestic revenue collection.
  - Enhance oversight of the natural resource sector.
  - Continue ongoing reforms aimed at financial sector development and improving the business environment.
- Staff position on review and waivers:
  - IMF staff supports completion of the first review, noting significant fiscal adjustment in 2012 and prior actions taken to strengthen revenue mobilization and the financial footing of the refinery.
  - Given the authorities’ decision to cancel the Republic of Congo loan contract with no disbursement, staff supports the request for a waiver of the breach of the performance criterion on non-concessional external debt.

*Source: _cr13104 - EXECUTIVE SUMMARY (IMF staff report, March 13, 2013)*

### 13.      The program for 2013 builds on the government’s broad development strategy, which

### _cr13104 - 13.      The program for 2013 builds on the government’s broad development strategy, which

### Program overview
- Builds on the poverty reduction strategy adopted in August 2012 (EBD/13/13) and the MEFP discussed by the Board in March 2012.
- Growth strategy pillars: substantial increases in public investment in infrastructure, agriculture, health, and education; measures to face security threats in the region; financial and private sector development.
- Supported by medium-term tax and customs administration reforms aimed at raising domestic revenue.
- Program 2013 priorities:
  - Create fiscal space for development spending while maintaining debt sustainability.
  - Rebuild government deposits at the central bank to facilitate budget execution and enhance resilience to shocks.
  - Implement structural reforms to strengthen budget execution, treasury management, and domestic revenue collection.
  - Enhance oversight of the natural resource sector to maximize revenue for development spending.
  - Continue reforms for financial development and improving the business environment.

### The budgetary framework for 2013
- Parliament adopted the government’s budget proposal for 2013 in December 2012.
- Revenue and expenditure projections:
  - Total revenue in 2013 is projected to rise by about 1 percentage point of GDP, reflecting the projected recovery of oil revenue and higher customs revenue.
  - Total expenditure (excluding net lending related to the new refinery) is projected to rise by 3¼ percentage points of GDP.
  - Public wage bill is projected to increase by about a ¼ percent of GDP, reflecting new recruitment for health care, education and rural development.
- Fiscal balances:
  - Fiscal deficit on a commitment basis, excluding grants and net lending, is projected to rise from 10 percent of GDP in 2012 to 12 percent of GDP in 2013.
  - Basic fiscal deficit (balance of domestic fiscal operations) projected to increase slightly from about 2 percent of GDP in 2012 to 2½ percent of GDP in 2013.
- Cash management:
  - Authorities plan to build cash holdings at the central bank (BCEAO) by CFAF 15 billion in 2013 (equivalent to about one week of domestically-financed spending).
  - At end-September 2012, freely available government cash holdings at the BCEAO stood at CFAF 12.6 billion.
- External financing needs:
  - Gross external financing needs in 2013 are projected at some CFAF 480 billion (13 percent of GDP), up from a budgeted CFAF 430 billion in 2012.
  - Concessional project loans and grants projected at CFAF 345 billion.
  - Budget aid for 2013 projected at CFAF 110 billion.
  - IMF would disburse CFAF 25 billion in 2013, assuming conclusion of program reviews as scheduled, closing the remaining financing gap (MEFP, ¶13).
- Non-concessional borrowing policy:
  - Given moderate risk of debt distress, non-concessional borrowing warranted only for well-assessed, high-yield commercial and infrastructure projects.
  - Program for 2013 maintains a zero ceiling on medium-term non-concessional borrowing; staff noted a non-zero ceiling could be considered at the second program review if justified.

### Structural reforms
- Strengthening budget and cash-flow management:
  - Limit expenditure implemented through exceptional procedures to a maximum of 5 percent of total expenditure.
  - Expedite procedures for release of budget allocations and produce and publish detailed budget execution reports.
  - Produce quarterly cash and commitment plans.
  - Establish a Single Treasury Account (Table 7) (MEFP, ¶14–19).
- Customs administration reforms:
  - Ambitious action plan to increase computerization, reinforce controls, step up the fight against fraud, and increase operational capacity (MEFP, ¶20).
- Debt management:
  - Concentrate all debt management activities at the Debt Directorate of the Ministry of Finance.
  - Commit to ensure all new public loans and guarantees are consistently analyzed by the National Debt Management Committee (measure initially envisaged for 2012) (MEFP, ¶22–23).

### Management of natural resources
- New refinery action plan (prior action):
  - Authorities committed to maintaining commercially-viable pricing for exports and domestic refined petroleum sales, given the oil transfer price from the upstream well operation.
  - International accountancy firm audit of the refinery to be completed by May 2013; audit of upstream operations recently completed.
  - Parallel steps to reduce the refinery’s debt service costs and settle overdue payments (MEFP, ¶27–28).
- Strengthening public oversight:
  - Opened a customs office at the refinery to improve verification of production and sales.
  - State-owned mining holding company (SOPAMIN) has strengthened its representation in mining companies (MEFP, ¶30).

### Financial sector reforms and private sector development
- Financial sector development strategy:
  - New five-year strategy adopted in 2012 with objectives to increase transparency and stability, deepen financial intermediation, improve legal structures, and develop and reinforce human capital (MEFP, ¶33).
- Banking sector vulnerabilities and linkages:
  - Nigerien banking sector dominated by foreign-owned banks; majority foreign-owned banks account for about 80 percent of total assets, deposits, credit to the economy, and offices.
  - Foreign liabilities account for approximately 20 percent of total liabilities of Niger’s banking sector; about 70 percent of these foreign liabilities are toward other WAEMU members, particularly Benin, Togo, Burkina Faso, and Cote d’Ivoire.
  - Foreign claims of Nigerien banks increased from about 5 percent to close to 20 percent of total assets in the last two years, driven by regionally active banks such as Ecobank and Bank of Africa.
  - At around 12 percent of Niger’s deposits, claims of BIS reporting banks on the Nigerien economy are moderate.
  - Regional Banking Commission conducting a study on consolidated supervision.
- Private sector measures for 2013:
  - Establish an agency for development of small- and medium-sized businesses.
  - Simplify procedures to start up a business.
  - Adopt a law on private-public partnerships (MEFP, ¶36–37).

### The Poverty Reduction Strategy Paper
- Joint Staff Advisory Note prepared by World Bank and IMF staffs on Niger’s Poverty Reduction Strategy for 2012–2015 (EBD/13/14).
- Fiscal consistency issues:
  - Growth figures in the baseline scenario broadly consistent with IMF-supported program projections.
  - The poverty reduction strategy’s fiscal framework assumes much larger budget deficits over the medium term, reflecting higher capital investment, and does not include a discussion of implications for debt sustainability.
  - Staff urges authorities to clarify fiscal projections in the poverty reduction strategy and link costing more clearly to fiscal scenarios.

### Program modalities and risks
- Reviews:
  - Second review of the ECF based on established PCs and structural benchmarks for end-December 2012.
  - Third and fourth reviews based on PCs and structural benchmarks shown in MEFP (Tables 1 and 2).
- Risks to implementation:
  - Regional security situation and Niger’s participation in the military operation in Mali, climatic shocks, and evolution of the new refinery are major uncertainties.
  - Potential budgetary implications to be addressed in the context of the second review.

### Staff appraisal
- Economic activity:
  - 2012 economic activity was strong; growth accelerated with the coming onstream of a new oil project and a rebound in agricultural production.
- Revenue and budget execution concerns:
  - Fiscal performance in first nine months of 2012 affected by significant shortfalls in oil and customs revenue.
  - Staff welcomes adoption of an action plan for the refinery and reforms to customs administration and urges timely, forceful implementation.
  - Delays in execution of the investment budget remain a source of concern; without increased capacity to select and execute projects, the development strategy may not be realized.
- Structural reform capacity:
  - Delays in implementing structural reforms in 2012 highlight the need to enhance capacity in key ministries; staff views delays as need to strengthen program monitoring and technical capacity rather than lack of ownership.
- Budget and defense spending monitoring:
  - 2013 budget consistent with maintaining macroeconomic stability while advancing development objectives.
  - Given uncertainties over budgetary effects of support for the international military involvement in Mali, budget execution should be monitored carefully; a supplementary budget should be submitted once clarity on defense spending and assistance is attained.
  - Staff stands ready to assist in preparing a revised budgetary framework and to address implications for program design in the second review under the ECF.
- Financing and debt-sustainability guidance:
  - Expansion of development spending in 2013 will be financed primarily from higher domestic revenue and concessional project financing.
  - Non-concessional loans should be considered only for well-assessed, high-yield commercial and infrastructure projects that will generate sufficient government revenue to cover debt service.
  - Given moderate risk of debt distress, preventing deterioration of debt sustainability indicators is important.
- Financial deepening and business climate:
  - Further implementation of the financial sector development strategy needed to ensure benefits across the economy.
  - Current business climate initiatives are adequate steps to help resource-led growth translate into growth of other sectors and support diversification.
- Poverty reduction strategy concerns reiterated:
  - Authorities urged to clarify fiscal projections and link costing to fiscal scenarios; strategy assumes much higher budget deficits than the medium-term IMF-supported program, raising questions about debt sustainability and policy consistency.

*International Monetary Fund — Selected extracts from the 2013 program documentation for Niger*

### 37.      Given program achievements in 2012 and the corrective measures adopted by the

### _cr13104 - 37.      Given program achievements in 2012 and the corrective measures adopted by the

### Program decision and Fund staff recommendation
- Staff supports:
  - the completion of the first review;
  - the request for a waiver for the missed continuous performance criterion on non-concessional borrowing;
  - the disbursement of the second tranche under the arrangement of SDR 11.28 million.

### Disbursement schedule under the ECF arrangement (selected)
- SDR 11.28 — Executive Board approval of the three-year ECF arrangement — March 16, 2012.
- SDR 11.28 — Observance of the June 30, 2012 performance criteria, and completion of the first review under the agreement — November 1, 2012.
- SDR 11.28 — Observance of the December 31, 2012 performance criteria, and completion of the second review under the agreement — May 1, 2013.
- Subsequent scheduled tranches of SDR 11.28 tied to completion of further semi-annual reviews up to March 10, 2015 (see schedule).

### Fiscal and policy implementation highlights (structural benchmarks, 2012)
- Compile comprehensive quarterly budget reports on a commitment, payment order, and payment basis, to be submitted to Fund staff within a period of 6 weeks.
  - Timing: Quarterly.
  - Progress: Met with delay.
- Limit expenditure not authorized in advance to a maximum of 5 percent of committed expenditure (except debt-service payments and fiscal expenditure related to exemptions).
  - Timing: Quarterly.
  - Progress: Not met. Committee has been put in place to enhance monitoring.
- Complete an inventory of bank accounts held by government entities and agencies.
  - Timing: 30-June-2012.
  - Progress: Met with delay.
- Give all known importers a tax identification number (TIN) and reserve the code for operators without a tax identification number exclusively for occasional operators, and submit a report on implementation.
  - Timing: 30-June-2012.
  - Progress: Met with delay. A comprehensive set of short- and medium-term anti-fraud measures was taken. The TIN has been granted in January 2013 (new prior action).
- Adoption by the Council of Ministers of a revision of the Investment Code to exclude the possibility of granting exemptions to already-established telecommunication companies when they introduce new technologies.
  - Timing: 30-Sept-2012.
  - Progress: Met. No need to review the Investment Code; for 3 of the 4 companies exemptions have expired and were not renewed; for the 4th one it will expire within 3 months.
- Close irregular and dormant bank accounts.
  - Timing: 30-Sept-2012.
  - Progress: Not met. Will be done by end-March 2013.
- Complete the interface between the Directorate General of the Budget and the Directorate General of the Treasury and Government Accounting to improve monitoring of the expenditure chain.
  - Timing: 31-Dec-12.
  - Progress: Completed at the central level; establishment of regional connections in progress.

### Key operational and monitoring points
- The waiver request pertains to a missed continuous performance criterion on non-concessional borrowing.
- The immediate operational implication is approval to disburse SDR 11.28 million as the second tranche under the ECF arrangement, conditional on staff recommendation and Board action.
- Structural benchmark monitoring shows mixed implementation: several items met (some with delay), several not met, and ongoing work to strengthen budget and cash management systems.

*Source: IMF staff report (February 28, 2013) as contained in the provided content unit.*

### 1. Despite a challenging environment, the government of Niger made progress in

### 1. Despite a challenging environment, the government of Niger made progress in

### Executive summary and recent developments
- Economic developments were positive with a good harvest, the start of oil production, and substantial investments in uranium extraction.
- The country faced a serious food crisis in the first part of the year due to the poor 2011 harvest, followed by devastating floods in 2012 and the effects of the deteriorating regional security situation.
- The economy is expected to grow by about 11¼ percent in 2012, buoyed by the start of oil production and a good harvest.
- Real GDP growth is expected to be around 6¼ percent in 2013, supported by continued expansion of the natural resource sector.
- Headline inflation remained low in 2012; inflation is expected to remain low in 2013 with lower food prices following new harvests.
- Net foreign assets are expected to increase by roughly CFAF 99 billion in 2012.
- Growth of broad money accelerated to 33½ percent in November 2012 (12-month basis).
- Credit growth stood at 24 percent in November 2012.

### Program implementation and performance in 2012
- Implementation was mixed:
  - Delays in customs administration reforms and lower oil exports than projected expected to result in a revenue shortfall of roughly 2 percent of GDP in 2012.
  - Performance criteria at end-June relating to domestic financing and the reduction of domestic arrears were met.
  - Pro-poor spending was impacted by delays in budget execution and priority given to security expenditure.
  - Structural reform implementation met with delays.
  - The quantitative performance criterion relating to non-concessional financing was not met because of the contracting of a CFAF 50 billion non-concessional budget loan with the Republic of Congo, although it was not disbursed.
- Corrective actions taken:
  - Implementation of an action plan to increase customs revenue by resolving key problems identified.
  - Substantial acceleration of structural reform program implementation.
  - Decision to forgo the bilateral loan contemplated with the Republic of Congo.

### Fiscal policy and 2013 budget framework
- The 2013 budget proposal adopted by the National Assembly:
  - Overall balance (excluding refinancing of the SORAZ refinery) expected to represent roughly 4 percent of GDP.
  - Cash reserves on the order of CFAF 15 billion (roughly one week of domestically financed government expenditures) to be accumulated at the central bank.
- Budgeted revenue for 2013 is expected to total about 17.1 percent of GDP rather than the 19 percent projected under the initial program.
- Customs duties are expected to increase by 19 percent with adoption of the new action plan to strengthen customs administration capacities.
- Petroleum sector expected to produce at 80 percent of capacity, or 16,000 barrels a day, resulting in projected government revenue of CFAF 61 billion.
- Public spending and investment:
  - At 16.3 percent of GDP, more than half of total spending in 2013 will be allocated to investment projects.
  - Of total spending, 6.8 percent of GDP will be domestically financed investment.
- External financing expectations for 2013:
  - Roughly CFAF 110 billion in external budget financing in the form of grants and concessional loans:
    - CFAF 26 billion from the World Bank,
    - CFAF 37 billion from the European Union,
    - CFAF 47 billion from other multilateral and bilateral donors.
  - Identified about CFAF 345 billion in project financing.
- Refinancing of SORAZ:
  - Expectation to sign a new project loan equivalent to CFAF 435 billion in 2013 to refinance the existing loan for construction of the refinery; the government will onlend the loan to the refinery.

### Public financial management (PFM) reforms and budget execution
- Medium-term PFM reforms initiated for 2012–2014; new framework law governing budget laws adopted to enhance transparency and disclosure.
- 2013 budget published on the National Statistics Institute (INS) website in accordance with the new framework law.
- Budget execution reporting:
  - Quarterly budget execution reports prepared and to be submitted to the IMF within six weeks after the end of the quarter (structural benchmark).
  - Commitment to continue preparing quarterly reports on a commitment, payment order, and payment basis (quarterly structural benchmark).
- Limit expenditure executed through exceptional procedures to 5 percent of total spending commitments (structural benchmark for each quarter).
- Treasury single account (TSA) progress:
  - Inventory identified 1,954 bank accounts held by public entities with a total balance of roughly CFAF 55 billion (1.5 percent of GDP).
  - Consultation under way to close 397 accounts already identified for closing.
- Budget execution acceleration measures:
  - Release quarterly appropriations no more than four weeks after January 1 for the first quarter and within two weeks after the start of the other quarters.
- Cash and commitment management:
  - Develop quarterly cash and commitment plans aligned and updated monthly (structural benchmarks for each quarter except first quarter).

### Tax and customs administration reforms
- Comprehensive action plan to correct customs administration problems, targeting:
  - Weaknesses in ex post inspections,
  - Irregular use of exemptions,
  - Administrative and technical irregularities.
- Measures include monitoring exempt transactions, anti-fraud steps, strengthening ex post inspection units, and operational capacity improvements.
- Prior action: as of January 1, 2013, all known importers are assigned a tax identification number (report on implementation to be submitted as a prior action).
- Additional measures to support customs revenue objectives:
  - Implementation of scanners;
  - Establishment of customs offices at mining and petroleum production sites (the refinery SORAZ, the Agadem oil field, and the Azelik and Imouraren uranium mines);
  - Automation of customs procedures (warehouse and exemption management).

### Tax policy changes in the 2013 budget law
- Certain exceptions introduced to the highest rate of 2 percent for the minimum flat tax introduced in January 2012.
- Compensations paid to workers laid off for economic reasons, and voluntary departures proposed by employers, will be exempt from the unified tax on wages and salaries (IUTS).
- The domestic fuel tax (TIPP) will be reduced from 15 percent to 12 percent.

### Debt management and external borrowing
- Commitment to strengthen public debt management and ensure investment financing does not compromise long-term debt sustainability.
- Directorate of Debt staff received training, including from AFRITAC West.
- Semiannual reports on existing debt, new debt contracted, and new loans under negotiation to be submitted to IMF staff.
- Enhanced status and role of the National Public Debt Management Committee (CNGDP); CNGDP produced its first report on debt sustainability in October 2012 without external experts.
- Consolidation of debt management authority:
  - Responsibility currently divided between the Directorate of Debt and the Autonomous Center for Repayment of Domestic Public Debt (CAADIE); a proposed order to dissolve the CAADIE is pending.
  - Plan to prepare an inventory of arrears associated with public enterprises and develop a plan to clear them before the end of first quarter 2013, while ensuring no new arrears accumulate.
- Non-concessional borrowing policy:
  - Limit non-concessional borrowing to high-yield, properly evaluated commercial and infrastructure projects that generate sufficient revenue to cover debt service.
  - Notify IMF staff at the start of negotiation of any proposed non-concessional loan and provide feasibility and profitability evaluations.
- Specific borrowing negotiations:
  - Negotiated a loan in the amount of US$880 million (13 percent of GDP) with the Exim Bank of China to replace current oil refinery (SORAZ) financing; aim to ensure concessional terms and limit government financial guarantees for the refinery to 40 percent.
  - Renegotiation efforts undertaken for the CFAF 50 billion non-concessional budget loan from the Republic of Congo (1.5 percent of GDP); government decided to forgo the loan.

### Natural resource sector developments and risks
- Zinder refinery (SORAZ) started operations in November 2011; Niger became an oil-producing country.
- First-year refinery production was roughly 66 percent of its 20,000-barrels-per-day capacity.
- Exports of refined products were limited due to lack of clients and other technical and administrative difficulties, leading to potential substantial financial deficit at the refinery in 2012.
- Petroleum production expectation for 2013: 80 percent of capacity, or 16,000 barrels a day.
- Risks to outlook:
  - Fragile regional security situation and Niger’s vulnerability to natural disasters (e.g., recent floods) represent risks to the macroeconomic outlook.

### Program requests and transparency commitment
- The government requests:
  - Completion of the first review,
  - A waiver of nonobservance of the criterion relating to non-concessional borrowing,
  - Disbursement of the second tranche of SDR 11.28 million under the arrangement.
- Authorities agree to publication of the staff report, this letter of intent, and the MEFP and TMU on the IMF website.
- Prior actions, performance criteria, and structural benchmarks for 2013 are included in Tables 1 and 2 of the MEFP.

*Source: Memorandum of Economic and Financial Policies, Government of Niger (attached to IMF staff report).*

### 27.      We are aware of the critical importance of measures to ensure the refinery's short- and

### _cr13104 - 27.      We are aware of the critical importance of measures to ensure the refinery's short- and

### Refinery profitability, audits, and immediate operational measures
- A technical committee was established with responsibility for the refinery's performance.
- Two audits (upstream and downstream processes) are under way.
  - The provisional results of the audit of upstream costs are already available.
  - The final report is scheduled to be submitted in mid-February 2013.
  - For the refinery audit, an international firm was selected on December 19, 2012 and is now conducting its work.
- The committee completed a revaluation of SORAZ expenses; certain expenses were determined to be unjustified and were disallowed.
- Simulations indicate the possibility of significantly reduced production costs based on the revaluation.
- The committee’s action plan will be enhanced by the audit results and additional measures, including:
  - (i) refinancing of the SORAZ loan,
  - (ii) harmonizing the terms of supplier credits between SORAZ and the national petroleum distribution company SONIDEP,
  - (iii) clearing the SONIDEP arrears vis-à-vis SORAZ, for which the final payment will be made on February 19, 2013, and
  - (iv) the implementing effectively a customs bureau to verify SORAZ inputs and outputs.
- While the refinery audit is being completed:
  - The selling price of crude oil and the ex-refinery prices of petroleum products destined for the local market will be set to allow the refinery to at least balance its own accounts during the first half of 2013.
- Prospecting is under way to identify sufficient reserves for a crude export project; negotiations are ongoing with Chad and Cameroon to use the pipeline running through the two countries.

### Natural resource sector governance and transparency
- The government will expand oversight of the natural resource sector to improve information flow and coordination between government representatives at each natural resource development enterprise.
- The state-owned mining company SOPAMIN dispatched engineers to mining companies to supervise the sector.
- Reflection on SOPAMIN’s strategic focus is continuing; a report will be produced.
- The government will ensure that the full amount of all dividends is remitted to the Treasury.
- SOPAMIN will retain its role as the government’s portfolio manager for mining projects.
- Transparency measures:
  - Niger remains a member of the Extractive Industries Transparency Initiative (EITI).
  - Petroleum receipts for 2012 and thereafter will be included in the EITI reporting process.
  - Plans to enhance transparency of refinery operations and exports through the publication of monthly statistics for the petroleum sector.

### Financial sector reform and supervision
- Objective: improve financial intermediation and deepen financial access beyond key sectors.
- A financial sector development strategy was prepared with assistance from the World Bank and other donors; relevant orders to implement the reform program will be adopted without delay.
- Prudential indicators and bank restructuring:
  - The transition to the new minimum capital standard was completed, with all but one bank—which is currently being restructured—meeting the requirement.
  - Not all prudential ratios have been met; several banks' liquidity ratios are below the current minimum.
  - Two banks are currently being restructured: one bank and one financial institution in liquidation.
  - The authorities will continue to monitor the banking sector, take measures to ensure viability, and strengthen supervision in cooperation with the BCEAO.
- The government recently acquired a 43.2 percent interest in Niger's Banque Internationale pour l'Afrique (BIA) from Coris Bank of Burkina Faso, and committed to the Banking Commission to sell all the shares acquired to substantial shareholders within a maximum of one year.

### Business climate and private sector promotion
- Commitment to improving the business climate to enable private-sector-led, job-creating growth and medium-term diversification.
- Institutional and regulatory actions undertaken or planned:
  - Creation of a special ministry responsible for private sector promotion.
  - Issuance of a charter for small and medium-size enterprises (order 2010-88 of December 16, 2010).
  - Implementation measures (selected list):
    - (i) simplification of procedures for starting a business;
    - (ii) revision of the activities of the National Private Investors Board (CNIP);
    - (iii) institution of ongoing dialogue and a cooperation framework between the private sector and the ministry;
    - (iv) establishment of the Maison de l’Entreprise to support the business formality center (CFE) and the investment promotion center (CPI);
    - (v) implementation of an institutional structure to improve business climate indicators;
    - (vi) launch of a program to integrate trade in development strategies (Integrated Framework) and implementation of a management unit;
    - (vii) adoption of a law on public-private partnerships and implementation of a technical coordination unit;
    - (viii) consultation on access to financing for enterprises.
  - Plan to revise order 92-02 of July 7, 1992 (pricing and competition regulations) by drafting a law on competition and the protection of consumer rights.
  - Development, at the beginning of 2013, of a commercial policy based on the strategic objectives of the 2012–2015 Economic and Social Development Plan, national sector strategies, and the WAEMU Common Commercial Policy.
- Niger joined the Multilateral Investment Guarantee Agency (MIGA); foreign direct investment is now eligible for MIGA political risk insurance.

### Program monitoring, performance criteria, and reporting
- Program monitoring will be based on performance criteria (Table 1) and structural benchmarks and prior actions (Table 2).
- Authorities will provide IMF staff with statistical data and information identified in the attached Technical Memorandum of Understanding (TMU) and any other requested information.
- During the program period, the government will refrain from:
  - introducing or tightening restrictions on payments and transfers pertaining to current international transactions without prior IMF approval;
  - introducing or modifying any multiple exchange rate practices;
  - concluding bilateral agreements not in compliance with Article VIII of the IMF Articles of Agreement;
  - introducing or tightening import restrictions for balance of payments purposes.
- The 2013 program will be monitored through semiannual reviews. The second, third, and fourth program reviews are expected to take place in May and November 2013, and May 2014, respectively.
- Selected numeric targets and indicators (from Table 1 and supporting text; amounts shown exactly as in source; units: Billions of CFA francs, cumulative from December 31, 2012, unless otherwise noted):
  - Net Domestic Financing of the Government (performance criteria/indicative targets row): 0.0-19.0-24.7-25.4
  - Reduction in domestic payment arrears of government obligations (minimum): -1.3-2.5-3.8-5.0
  - Memorandum item: External budgetary assistance: 9.9 6.2 86.2 8.9 11.0.1 (note: presented in the source as "9.966.286.9110.1")
  - Continuous quantitative performance criteria:
    - Accumulation of external payments arrears: 0.0 0.0 0.0 0.0
    - New external debt contracted or guaranteed by the government with maturities of less than 1 year: 0.0 0.0 0.0 0.0
    - New nonconcessional external debt contracted or guaranteed by the government and public enterprises with maturities over 1 year: : 0.0 0.0 0.0 0.0
  - Indicative targets (cumulative from December 31, 2012):
    - Basic budget balance (commitment basis, excl. grants) (minimum): -12.1-44.5-54.7-522.1
    - Total revenue (minimum): 125.7 280.5 439.7 617.8 (presented in source as "125.7280.5439.7617.8")
    - Spending on poverty reduction (minimum): 72.0 170.3 259.2 366.7 (presented in source as "72.0170.3259.2366.7")
  - Note in table: "The indicative target assumes that a new project loan of 435bn CFAF (to refinance the loan for the construction of the refinery Soraz) will be disbursed in the fourth quarter."
- Table 2: Prior actions and structural benchmarks (selected entries and status)
  - Prior action: Adoption by the Council of Ministers of an action plan discussed with IMF staff to provide a sound financial footing for the refinery, including a decision to set ex-refinery prices of petroleum products and crude oil input prices at levels that ensure the profitability of the refinery and the petroleum sector. Rationale: Increase revenues from petroleum production; reduce risks for the government budget. Progress: Met.
  - Prior action: Adopt a decision to issue a tax identification number to all known commercial importers in order to reduce fraud and increase tax revenue (submission of a report on implementation of this measure). Rationale: Increase tax revenue. Progress: Met.
  - Quarterly structural benchmarks and commitments related to budget reporting, limiting unauthorized expenditures to a maximum of 5 percent of spending commitments (with specified exceptions), establishment of a Treasury single account (End-December 2013), and quarterly cash management and commitment plans aligned with spending ministries (Q2-Q4) to improve budget execution and cash flow management.
- TMU and definitions (selected points; dates and references preserved):
  - Attachment II—Technical Memorandum of Understanding, Niamey, February 28, 2013.
  - The TMU defines performance criteria and indicative targets of Niger’s program under the Extended Credit Facility arrangement (ECF) for the period 2012–Q1 2015.
  - Definitions provided for "government," "debt" (per IMF Decision No. 6230-(79/140) as amended effective December 1, 2009), "external payments arrears," "domestic payments arrears," and "government obligation."
  - Quantitative performance criteria include Net Domestic Financing of the Government and Reduction of Domestic Payments Arrears, with reporting requirements:
    - Detailed data on domestic financing of the government will be provided monthly, within six weeks after the end of each month.
    - The Centre d’amortissement de la dette intérieure de l’État (CAADIE) and the Treasury are responsible for calculating the stock of domestic payments arrears on government obligations and recording their repayment.

*Document: _cr13104 - 27.      We are aware of the critical importance of measures to ensure the refinery's short- and (IMF, February 28, 2013).*

### 14.      Data on the stock, accumulation (including the change in Treasury balances

### _cr13104 - 14.      Data on the stock, accumulation (including the change in Treasury balances

### Domestic arrears: stock, accumulation, repayment
- Data on the stock, accumulation (including the change in Treasury balances outstanding), and repayment of domestic arrears on government obligations will be provided monthly, within six weeks following the end of each month.

### External payments arrears — definition and reporting
- Definition:
  - Government debt is outstanding debt owed or guaranteed by the government.
  - For the program, the government undertakes not to accumulate external payments arrears on its debt (including Treasury bills and bonds issued in CFAF on the WAEMU regional financial market), with the exception of external payments arrears arising from debt being renegotiated with external creditors, including Paris Club creditors.
- Reporting requirement:
  - Data on the stock, accumulation, and repayment of external payments arrears will be provided monthly, within six weeks following the end of each month.

### External non-concessional loans contracted or guaranteed by the public sector — definitions and reporting
- Definition and concessionality calculation:
  - The government and the public enterprises listed in ¶21 will not contract or guarantee external debt with an original maturity of one year or more and having a grant element of less than 35 percent.
  - For program purposes, a debt is concessional if it includes a grant element of at least 35 percent, calculated as follows: the grant element of a debt is the difference between the present value (PV) of debt and its nominal value, expressed as a percentage of the nominal value of the debt.
  - The PV of debt at the time of its contracting is calculated by discounting the future stream of payments of debt service due on this debt.
  - The discount rates used are the currency specific commercial interest reference rates (CIRRs), published by the Organization for Economic Cooperation Development (OECD).
  - For debt with a maturity of at least 15 years, the ten-year-average CIRR will be used to calculate the PV of debt and, hence, its grant element. For debt with a maturity of less than 15 years, the six-month average CIRR will be used.
  - Margins for differing repayment periods (as used by the OECD) to be added: 0.75 percent for repayment periods of less than 15 years, 1 percent for 15 years to 19 years, 1.15 percent for 20 years to 29 years, and 1.25 percent for 30 years or more.
  - Footnotes:
    - The calculation of concessionality will take into account all aspects of the loan agreement, including maturity, grace period, payment schedule, upfront commissions, and management fees.
    - For debts in foreign currencies for which the OECD does not calculate a CIRR, calculation of the grant element should be based on the composite CIRR (weigthed average) of the currencies in the SDR basket.
- Scope and exclusions:
  - This performance criterion applies not only to debt as defined in point 9 of the Guidelines on Performance Criteria with Respect to External Debt in Fund Arrangements adopted by Decision No. 6230-(79/140) of the Executive Board of the IMF, as amended effective December 1, 2009, but also to any obligation contracted or guaranteed for which no value has been received.
  - This performance criterion does not apply to financing provided by the IMF and to debt rescheduling in the form of new loans.
  - Guarantee of a debt arises from any explicit legal obligation of the government to service a debt in the event of nonpayment by the debtor (involving payments in cash or kind).
  - External debt is defined as debt borrowed or serviced, or requiring repayment, in a currency other than the CFA franc. This definition also applies to debt among WAEMU countries.
- Public sector coverage (¶21):
  - The public sector includes the government and the following public enterprises:
    - Société Nigérienne d'Electricité (Nigelec)
    - Société de Construction et de Gestion des Marchés (Socogem)
    - Société de Patrimoine des Eaux du Niger (SPEN)
    - Société Nigérienne de Charbon (Sonichar)
    - Société Nigérienne des Produits Pétroliers (Sonidep)
    - Société Nigérienne des Télécommunications (Sonitel)
    - Société de Patrimoine des Mines du Niger (Sopamin)
    - Société Hôtel Gaweye (SPEG)
- Reporting requirement:
  - Details on all external public sector debt will be provided monthly, within six weeks after the end of each month.
  - The same requirement applies to guarantees granted by the central government.
  - The Ministry of Finance will regularly forward to Fund staff a list of loans in process of negotiation.
  - The Ministry will prepare semiannual reports on any external debt contracted or in process of negotiation and the terms thereof, as well as on the borrowing program for the next six months, including the terms, and will forward them to Fund staff.

### Short-term external debt of the central government — definition and reporting
- Definition:
  - The government will not accumulate or guarantee new external debt with an original maturity of less than one year.
  - This performance criterion applies not only to debt as defined in point 9 of the Guidelines on Performance Criteria with Respect to External Debt in Fund Arrangements adopted by Decision No. 6230-(79/140) of the Executive Board of the IMF, as amended effective December 1, 2009, but also to any obligation contracted or guaranteed for which no value has been received.
  - Short-term loans related to imports are excluded from this performance criterion, as are short-term securities issued in CFAF on the regional financial market.
- Reporting requirement:
  - Details on all external government debt will be provided monthly, within six weeks following the end of each month.
  - The same requirement applies to guarantees granted by the government.

### Quantitative targets — definitions and reporting
- Definitions:
  - Total revenue is an indicative target for the program. It includes tax, nontax, and special accounts revenue, but excludes proceeds from the settlement of reciprocal debts between the government and enterprises.
  - The basic fiscal deficit is defined as the difference between: (i) total tax revenue as defined in ¶22; and (ii) total fiscal expenditure excluding externally financed investment expenditure but including HIPC-financed expenditure.
  - The floor on poverty-reducing expenditure is an indicative target for the program. This expenditure comprises all budget lines included in the Unified Priority List (UPL) of poverty-reducing and HIPC-financed expenditure.
- Reporting requirement:
  - Information on revenue and expenditure will be provided to the IMF monthly, within six weeks after the end of each month.
  - Information on UPL expenditure will be provided to the IMF monthly, within six weeks after the end of each quarter.

### Additional information for program monitoring — government finance
- Monthly submissions to IMF staff:
  - Detailed monthly estimates of revenue and expenditure, including priority expenditure, the payment of domestic and external arrears, and a breakdown of customs, DGI, and Treasury revenue.
  - The Table of Government Financial Operations with comprehensive monthly data on domestic and external financing of the budget, and changes in arrears and Treasury balances outstanding. These data are to be provided monthly, within six weeks following the end of each month.
  - Comprehensive monthly data on net nonbank domestic financing:
    - (i) the change in the stock of government securities (Treasury bills and bonds) issued in CFAF on the WAEMU regional financial market and not held by resident commercial banks;
    - (ii) the change in the balance of Treasury correspondents’ deposit accounts;
    - (iii) the change in the balance of various deposit accounts at the Treasury;
    - (iv) the change in the stock of claims on the government forgiven by the private sector.
  - Quarterly data on expenditure for UPL lines (statement of appropriations approved, disbursed, and used).
  - Quarterly reports on budget execution, including the rate of execution of poverty-reducing expenditure and, in particular, the use of appropriations by the line ministries concerned (National Education, Public Health, Equipment, Agriculture, Livestock).
  - Monthly data on the balances of accounts of the Treasury (Treasury trial balance) and of other public accounts at the BCEAO.
  - Monthly data on Treasury balances outstanding, by reference fiscal year, with a breakdown of maturities of more than and less than 90 days.
  - Monthly data on effective debt service (principal and interest) compared with the programmed maturities provided within four weeks after the end of each month.
  - List of external loans contracted or in process of negotiation and projected borrowing in the next six months, including the financial terms and conditions.

### Monetary sector reporting
- The authorities will provide each month, within eight weeks following the end of each month:
  - Consolidated balance sheet of monetary institutions and, in applicable cases, the balance sheets of individual banks.
  - Monetary survey, within eight weeks after the end of the month (provisional data).
  - Borrowing and lending interest rates.
  - Customary banking supervision indicators for banks and nonbank financial institutions (if necessary, these same indicators for individual institutions may also be provided).

### Balance of payments reporting
- The government will provide IMF staff:
  - Any revision of balance of payments data (including services, private transfers, official transfers, and capital transactions) whenever they occur.
  - Preliminary annual balance of payments data, within six months after the end of the reference year.

### Real sector reporting
- The government will provide IMF staff:
  - Disaggregated monthly consumer price indexes, within two weeks following the end of each month.
  - The national accounts, within six months after the end of the year.
  - Any revision of the national accounts.

### Structural reforms and other data
- The government will provide:
  - Any study or official report on Niger's economy, within two weeks after its publication.
  - Any decision, order, law, decree, ordinance, or circular with economic or financial implications, upon its publication or, at the latest, when it enters into force.
  - Any draft contract in the mining and petroleum sectors involving the direct financial participation or guarantee of the government.
  - Any new information on the mining and petroleum sectors, including production and sales volumes, prices, and foreign investment.
  - Any agreement with private sector stakeholders having economic or financial repercussions for the government, including in the natural resources sector.

### Summary of data to be reported (selected items and timing)
- Real sector:
  - National accounts. Frequency: Annual. Reporting requirement: End-year + 6 months.
  - Revisions of the national accounts. Frequency: Variable. Reporting requirement: 8 weeks after the revision.
  - Disaggregated consumer price indexes. Frequency: Monthly. Reporting requirement: End-month + 2 weeks.
- Government finance (selected):
  - Net government position vis-à-vis the banking system. Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Complete monthly data on net nonbank domestic financing (items listed above). Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Provisional TOFE, including a breakdown of revenue (DGI, DGD, and Treasury) and expenditure, including the repayment of domestic wage and nonwage arrears as at end-1999, and the change in Treasury balances outstanding. Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Data on Treasury balances outstanding (RAP), by reference fiscal year (total and RAP at more than 90 days). Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Monthly statement of Treasury correspondents’ deposit accounts. Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Execution of the investment budget. Frequency: Quarterly. Reporting requirement: End-quarter + 8 weeks.
  - Table of fiscal expenditure execution, unified list expenditure, and HIPC-financed expenditure. Frequency: Quarterly. Reporting requirement: End-quarter + 6 weeks.
  - Treasury accounts trial balance. Frequency: Monthly. Reporting requirement: End-month plus 6 weeks.
  - Monthly statement of the balances of accounts of the Treasury and of other public accounts at the BCEAO. Frequency: Monthly. Reporting requirement: End-month plus 2 weeks.
  - Petroleum products pricing formula, petroleum products tax receipts, and pricing differentials. Frequency: Monthly. Reporting requirement: End-month + 4 weeks.
- Monetary and financial data:
  - Monetary survey. Frequency: Monthly. Reporting requirement: End-month + 6 weeks (provisional); End-month + 10 weeks (final).
  - Consolidated balance sheet of monetary institutions and, in applicable cases, balance sheets of individual banks. Frequency: Monthly. Reporting requirement: End-month + 8 weeks.
  - Borrowing and lending interest rates. Frequency: Monthly. Reporting requirement: End-month + 8 weeks.
  - Banking supervision prudential indicators. Frequency: Quarterly. Reporting requirement: End-quarter + 8 weeks.
- Balance of payments:
  - Balance of payments. Frequency: Annual. Reporting requirement: End-year + 6 months.
  - Balance of payments revisions. Frequency: Variable. Reporting requirement: At the time of the revision.
- External debt:
  - Stock and repayment of external arrears. Frequency: Monthly. Reporting requirement: End-month + 6 weeks.
  - Breakdown of all new external loans contracted and projected borrowing, including financial terms and conditions. Reporting requirement: End-month + 6 weeks.
  - Table on the monthly effective service of external debt (principal and interest) compared with programmed maturities. Frequency: Monthly. Reporting requirement: End-month + 4 weeks.

### Debt Sustainability Analysis (DSA) — background and key assumptions (summary)
- Context:
  - The previous DSA was conducted at the time of the 2011 Article IV Consultation (Country Report No. 11/357, December, 2011).
  - The medium-term economic framework underpinning the analysis has been revised to reflect new information on the financing of large oil and mining projects, including the contracting of a new concessional loan to refinance an oil refinery.
  - While various debt measures remain below the relevant thresholds for the baseline scenario, the present value (PV) of debt to GDP ratio breach the threshold under the most extreme stress test. On the basis of this, Niger’s risk of debt distress should continue to be considered as moderate.
- Preparation and approval:
  - Approved By: David Robinson and Peter Allum (IMF) and Marcelo Giugale and Sudarshan Gooptu (IDA).
  - Prepared by the staffs of the International Monetary Fund and the International Development Association. Date: March 13, 2013.
- Key background points:
  - The DSA updates the 2011 DSA of the external and total public debt of Niger using the standard debt dynamics template for low-income countries and is based on end-2011 data.
  - Debt data cover external and domestic debt of the central government, debt of public enterprises and parastatals, a state guarantee, and private external debt, derived from projected debt flows linked to large oil and mining projects.
  - Domestic debt includes arrears, debt to the central bank (BCEAO) for statutory advances and the SDR allocation, and government securities.
  - Historical context: public nominal external debt declined from more than 80 percent of GDP in 2002 to about 17 percent in 2010 after Enhanced HIPC and MDRI relief.
  - In 2011 the government contracted a 650 million yuan loan for financing its share in the new Azelik uranium mine and extended a guarantee of 40 percent of a US$880 million loan to the Soraz oil refinery; as a result public external debt, including guarantees, moved to 22 percent of GDP at end-2011.
  - The authorities plan increased infrastructure spending in the next few years.
- Underlying DSA assumptions and projections:
  - Recent downward revisions in GDP growth, fiscal revenue and exports for 2011 and 2012 reflect a bad agricultural harvest in 2011, start-up difficulties in a new oil project, and a significant shortfall in custom revenues in 2012.
  - Start of operations of the new Imouraren uranium mine has been postponed by about two years, shifting expected impact from medium to longer term.
  - Macroeconomic assumptions for the long-term in GDP growth, revenue, and exports remain close to those in the last DSA.
  - Natural resources are expected to continue playing a key role in GDP growth in the longer term; inflation is projected to average 1.9 percent over the projection period.
  - Exports-to-GDP ratio is projected to increase through 2028.
  - A crude oil export project is under development but is not included in the baseline due to uncertainty.
  - The current account deficit, excluding official transfers, is projected to improve reflecting coming onstream of petroleum production.
  - Financing of the current account deficit is projected from debt creating flows, foreign direct investment, and capital grants, which account for about 17 percent of exports of goods and services on average over the projection period in Niger.
  - Risks: vulnerability to exogenous shocks including climatic shocks, commodity price fluctuations, and the regional security situation.

*Source: _cr13104 - 14.      Data on the stock, accumulation (including the change in Treasury balances*

### 8. Niger’s public debt exposure is expected to increase significantly due to the

### 8. Niger’s public debt exposure is expected to increase significantly due to the

### Public debt exposure and the Soraz refinancing
- Authorities reached understandings with EXIM Bank of China on the contracting of a concessional loan of US$880 million (CFAF 435 billion, or 12 percent of GDP).
- This loan will refinance the existing non-concessional financing of the new refinery, which was initially provided by the Chinese investment partner (CNPC), with 40 percent guaranteed by the state.
- The non-concessional 40 percent state guarantee will be terminated, causing a one-off spike in debt service ratios in 2013.
- The government is expected to assume liability for the total amount of the new loan, which will be on-lent to the refinery.
- As a result, the stock of public external debt is expected to reach about 33.5 percent of GDP in 2013, from 24 percent in 2012.
- Private external debt is expected to decrease by 60 percent in counterpart as the previously contracted loan is terminated; therefore the stock of total (public and private) external debt (in nominal terms) is not expected to be affected by this transaction.
- The rate of external public debt accumulation is subsequently expected to remain broadly stable over time (Figure 1a).
- The grant element of the new borrowing in the short term has improved compared to the previous DSA because the new loan for the refinery is concessional; it is expected to gradually decline over time as the country develops and thus will have less access to new borrowing on highly concessional terms.

### Baseline projections and debt ratios (2012–32)
- In the baseline scenario the external debt ratios remain below their policy-dependent thresholds throughout the projection period (2012-32), as in the previous DSA.
- The present value (PV) of debt-to-GDP ratio is projected to increase sharply from 2012 to 2013 and will continue to move upward for the rest of the period.
- The PV of debt-to-export and debt-to-revenue ratios adopt similar trajectories.
- The PV of debt-to-export ratio follows a relatively more benign path thanks to the increasing projected exports over the projection period.
- Because of the assumed termination of the 40 percent state guarantee of the SORAZ loan in 2013, the present value of debt service to export and debt service to revenue ratios breach their thresholds in 2013.

### Historical scenario and sensitivity to macro variables
- The historical scenario shows a relative improvement in debt ratios compared to the baseline.
- If the current account deficit, FDI inflows, real GDP growth and GDP deflator were at their historical averages, debt ratios would significantly improve.
- Lower debt ratios in the historical scenario mainly stem from a higher historical GDP deflator at about 8.5 percent compared to 2 percent in the projection period (Box 1).

### Shock scenarios: exchange rate and financing terms
- A one-time 30 percent nominal depreciation of the CFA franc relative to the baseline in 2013 would cause the PV of debt-to-GDP ratio to breach its threshold as early as 2016 and remain above it until 2032.
- The breach of thresholds under this depreciation shock is large and protracted.
- A worsening in financing terms during the projected period would also cause the PV of debt-to-GDP ratio to breach its threshold from 2020 onwards.

### Public DSA including domestic debt
- Domestic debt includes arrears, debt to the central bank (BCEAO) for statutory advances and the SDR allocation, and government securities.
- Considering public debt does not change the analysis from the external-only perspective; public debt ratios remain relatively low under different scenarios except for the most extreme shock.
- The most extreme shock: real GDP growth set at its historical average minus one standard deviation in 2013-2014, assumed to negatively affect nominal revenue while keeping government spending at baseline levels, leading to an increase in primary deficit and financing needs.
- Under this extreme shock, the PV of debt-to-GDP and the PV of debt-to-revenue ratios more than double during the projection period.

### Private debt dynamics
- The DSA includes preliminary information on private debt provided by the authorities, mainly linked to large ongoing oil and uranium projects.
- Estimates incorporate the impact of the contracting of a loan by the refinery Soraz (60 percent privately owned) in 2011, and the expected gradual disbursement and subsequent repayment of a loan of about 1.4 billion euro from a foreign investor to finance the new uranium mine Imouraren.
- Including this private debt, the stock of external debt would reach 56 percent of GDP in 2013.
- Amortization of the Imouraren loan is projected to start from 2017 onwards, thus gradually decreasing the stock of private external debt.

### Conclusion and policy recommendations
- On the basis of the updated DSA, Niger remains subject to moderate risk of debt distress.
- Although the grant element of new borrowing is projected to improve compared to the previous DSA in the short run, the stock of public external debt is expected to increase significantly following the refinancing of the $880 million Soraz loan in 2013.
- The refinancing will replace the existing private non-concessional financing of the refinery, which was 40 percent guaranteed by the State, thereby substantially increasing the stock of public debt.
- The country’s level of debt and the government’s involvement in the financing of natural resources projects keep Niger very much vulnerable to adverse shocks, as demonstrated by the deterioration of the debt indicators in the extreme shock scenarios.
- Policy recommendations:
  - Limit government involvement in financing natural resource projects.
  - Remain vigilant in seeking concessional new borrowing.
  - Consider non-concessional borrowing only for well-assessed, high-yield commercial and infrastructure projects that will generate sufficient government revenue to cover related debt service.

*IMF staff DSA findings and recommendations as presented in the source document*

### 34.7 percent in 2032, as oil and uranium exports expand and the economy diversifies. After a brief decline,

### _cr13104 - 34.7 percent in 2032, as oil and uranium exports expand and the economy diversifies. After a brief decline,

### External financing, FDI, and imports
- Net FDI:
  - Projected to decline from a peak of 17.5 percent of GDP in 2010 as large investment projects come to completion and in line with the delay in the large investment project related to Imouraren.
  - A large FDI outflow in 2013 will be recorded due to the reclassification of the Soraz loan in that same year, previously considered an FDI, intra-company inflow now defined as public debt.
  - Assuming the start of repayment of the Imouraren debt-creating FDI, FDI is reduced in 2018.
- Imports:
  - After a brief decline, imports would increase again before stabilizing, in line with foreign direct investment patterns.
- Total external financing:
  - Expected to gradually decrease from 10.7 percent of GDP in 2012 to about 8.8 percent of GDP in 2032.
  - Grants would represent about 62 percent of total external financing on average during the period.
  - The discount rate used is 3 percent (noting this is lower than the previous DSA rate of 4 percent).

### Debt accumulation, projections, and key statistics
- External debt (nominal): sample values across years include 39.5, 50.0, 50.4, 54.0, 56.0, 58.5, 61.2, 62.6, 59.2, 48.0, 40.9 (as reported in table rows).
- Public and publicly guaranteed (PPG) external debt (sample): 18.9, 17.0, 22.4, 24.0, 33.5, 34.8, 36.4, 37.8, 38.6, 41.7, 42.1.
- Change in external debt (selected entries): 15.6, 10.5, 0.4, 3.6, 2.0, 2.5, 2.7, 1.4, -3.5, -1.6, -0.5.
- Identified net debt-creating flows (selected entries): 11.2, -0.3, 3.1, 3.8, 20.2, 7.3, 7.8, 6.9, 6.0, 6.1, 5.5.
- Non-interest current account deficit (selected entries): 24.4, 19.7, 24.6, 12.2, 7.8, 17.2, 18.5, 19.4, 18.9, 15.9, 10.0, 9.9, 9.5, 10.3.
- Exports (percent of GDP, selected): 20.6, 22.2, 22.2, 25.4, 25.7, 26.4, 25.8, 25.8, 27.2, 34.1, 34.7.
- Imports (percent of GDP, selected): 47.5, 49.2, 50.7, 45.9, 45.8, 46.7, 44.9, 42.4, 37.9, 43.5, 45.9.
- Net current transfers (negative = inflow) and official share (selected):
  - Net current transfers: -2.8, -7.9, -4.6, -4.4, 1.5, -4.6, -4.5, -4.6, -4.5, -4.4, -4.1, -2.8, -1.8, -2.5.
  - Of which official: -0.7, -5.5, -3.3, -3.3, -3.3, -3.4, -3.2, -3.1, -2.9, -1.5, -0.6.
- Endogenous debt dynamics (selected): 0.6, -2.5, -4.8, -5.0, -2.5, -2.8, -2.7, -2.8, -3.4, -2.4, -1.7.
  - Contribution from nominal interest rate (selected): 0.4, 0.2, 0.1, 0.4, 0.5, 0.5, 0.5, 0.5, 0.5, 0.5, 0.6.
  - Contribution from real GDP growth (selected): 0.2, -3.9, -1.0, -5.5, -3.0, -3.3, -3.3, -3.4, -3.9, -2.9, -2.3.
- Residual (3-4) (selected): 4.4, 10.8, -2.6, -0.3, -18.2, -4.8, -5.1, -5.5, -9.5, -7.7, -5.9.
- PV of external debt (selected): 46.6, 49.3, 48.3, 50.4, 52.7, 53.7, 50.0, 38.7, 33.2.
  - In percent of exports (selected): 209.5, 194.0, 188.1, 191.2, 204.3, 208.3, 184.0, 113.5, 95.7.
- PV of PPG external debt (selected): 18.6, 19.4, 25.7, 26.7, 27.9, 28.9, 29.4, 32.4, 34.5.
  - In percent of exports (selected): 83.5, 76.2, 100.2, 101.3, 108.1, 112.0, 108.1, 95.1, 99.3.
  - In percent of government revenues (selected): 129.6, 121.4, 150.8, 151.4, 156.0, 158.5, 158.0, 164.4, 160.8.
- Debt service ratios (selected):
  - Debt service-to-exports ratio (in percent): 3.3, 2.5, 3.2, 5.1, 70.7, 4.1, 3.9, 7.3, 11.8, 7.1, 6.1.
  - PPG debt service-to-exports ratio (in percent): 3.3, 2.5, 3.2, 4.3, 23.2, 3.4, 3.3, 3.3, 3.0, 2.4, 5.4.
  - PPG debt service-to-revenue ratio (in percent): 4.6, 4.1, 5.0, 6.9, 34.9, 5.1, 4.7, 4.7, 4.4, 4.2, 8.7.
- Total gross financing need (Billions of U.S. dollars): 0.6, 0.2, 0.5, 0.7, 3.0, 0.9, 1.0, 1.0, 1.2, 1.6, 3.0.
- Non-interest current account deficit that stabilizes debt ratio (selected): 8.7, 9.2, 24.1, 13.7, 16.4, 16.9, 16.2, 14.5, 13.5, 11.5, 10.0.

### Key macroeconomic assumptions and projections
- Real GDP growth (selected): -1.0, 10.7, 2.2, 4.8, 4.3, 11.2, 6.2, 6.4, 6.0, 5.9, 6.8, 7.1, 6.4, 6.0, 6.2.
- GDP deflator in US dollar terms (change in percent, selected): 0.0, -3.1, 8.6, 8.5, 7.2, -6.8, 4.7, 1.1, 0.6, 0.8, 1.7, 0.3, 2.0, 2.0, 2.0.
- Effective interest rate (percent) (selected): 1.7, 0.4, 0.3, 2.2, 2.1, 0.9, 1.0, 1.1, 1.0, 0.9, 0.9, 1.0, 1.2, 1.6, 1.3.
- Growth of exports of G&S (US dollar terms, in percent) (selected): 4.9, 15.7, 11.0, 16.2, 11.8, 18.5, 12.4, 10.3, 4.3, 6.7, 14.6, 11.1, 18.1, 6.5, 10.1.
- Growth of imports of G&S (US dollar terms, in percent) (selected): 29.4, 10.9, 14.5, 21.6, 13.2, -6.4, 11.0, 9.7, 2.7, 0.8, -2.9, 2.5, 18.3, 5.0, 9.7.
- Grant element of new public sector borrowing (in percent) (selected entries): 31.6, 21.5, 30.3, 31.1, 31.8, 31.5, 29.7, 26.1, 16.7, 23.4.
- Government revenues (excluding grants, in percent of GDP) (selected): 14.5, 13.6, 14.3, 16.0, 17.1, 17.6, 17.9, 18.2, 18.6, 19.7, 21.5, 20.4.
- Aid flows (Billions of US dollars) and composition (selected):
  - Aid flows: 0.3, 0.3, 0.4, 0.6, 0.7, 0.8, 0.8, 0.8, 0.9, 1.1, 1.9.
  - Of which grants: 0.2, 0.3, 0.2, 0.4, 0.6, 0.6, 0.6, 0.7, 0.7, 0.9, 1.6.
  - Of which concessional loans: 0.1, 0.1, 0.2, 0.2, 0.1, 0.1, 0.2, 0.2, 0.2, 0.2, 0.3.
- Grant-equivalent financing (in percent of GDP) (selected): 7.8, 11.3, 9.1, 9.0, 8.7, 8.1, 7.1, 5.7, 6.6.
- Grant-equivalent financing (in percent of external financing) (selected): 69.3, 46.1, 75.7, 75.6, 75.5, 74.1, 69.7, 62.4, 66.7.
- Nominal GDP (Billions of US dollars) (selected): 5.3, 5.7, 6.3, 6.6, 7.3, 7.9, 8.4, 9.0, 9.7, 14.6, 32.2.
- Nominal dollar GDP growth (selected): -1.0, 7.2, 11.0, 3.6, 11.2, 7.6, 6.6, 6.7, 8.6, 7.4, 8.5, 8.1, 8.3.
- PV of PPG external debt (Billions of US dollars) (selected): 1.1, 1.3, 1.9, 2.1, 2.3, 2.6, 2.8, 4.7, 11.1.
- PV of PPG external debt (in percent of GDP + remittances) (selected): 18.6, 19.4, 25.7, 26.7, 27.9, 28.9, 29.4, 32.4, 34.5.
- PV of PPG external debt (in percent of exports + remittances) (selected): 83.5, 76.2, 100.2, 101.3, 108.1, 112.0, 108.1, 95.1, 99.3.
- Debt service of PPG external debt (in percent of exports + remittances) (selected): 3.2, 4.3, 23.2, 3.4, 3.3, 3.3, 3.0, 2.4, 5.4.

### Stress tests, alternative scenarios, and sensitivity analyses
- Figures and tables present multiple alternative scenarios and bound tests for 2012-2032, including:
  - Alternative scenarios: A1 (key variables at historical averages in 2012-2032) and A2 (new public sector loans on less favorable terms in 2012-2032).
  - Bound tests B1–B6, including shocks to real GDP growth, export value growth, US dollar GDP deflator, net non-debt creating flows, combinations of shocks, and a one-time 30 percent nominal depreciation relative to the baseline in 2013.
- Selected stress results (examples from tables):
  - PV of debt-to-exports ratio and PV of debt-to-revenue ratio show large increases under adverse scenarios and bound tests, with baseline and scenario-specific paths reported for 2012–2032.
  - PV of debt-to-GDP ratio and debt service ratios are reported under baseline and scenario runs (tables 2a, 2b).
- Memo item: Grant element assumed on residual financing (i.e., financing required above baseline) is listed as 23 across relevant columns in Table 2a.

### Public sector debt dynamics and fiscal space
- Public sector debt (selected): 27.2, 24.0, 28.9, 29.7, 38.3, 39.7, 40.7, 41.5, 41.6, 43.0, 42.5.
  - Of which foreign-currency denominated (selected): 18.9, 17.0, 22.4, 24.0, 33.5, 34.8, 36.4, 37.8, 38.6, 41.7, 42.1.
- Change in public sector debt (selected): 4.8, -3.2, 4.8, 0.9, 8.6, 1.4, 0.9, 0.8, 0.2, 0.4, -0.3.
- Identified debt-creating flows (selected): 3.4, 1.1, 0.2, 0.4, 2.0, 1.3, 1.0, 0.8, 0.1, 0.3, 0.7.
- Primary deficit (selected): 5.0, 2.2, 1.3, 0.9, 2.2, 3.2, 3.9, 3.5, 3.0, 3.0, 2.9, 3.2, 3.2, 3.3, 3.1.
- Revenue and grants (selected): 18.9, 18.2, 18.1, 22.2, 24.8, 25.5, 25.5, 25.6, 25.4, 25.8, 26.5.
  - Of which grants (selected): 4.4, 4.6, 3.8, 6.2, 7.7, 7.8, 7.7, 7.3, 6.8, 6.0, 5.0.
- Primary (noninterest) expenditure (selected): 23.8, 20.4, 19.4, 25.3, 28.6, 29.0, 28.6, 28.5, 28.4, 28.9, 29.8.
- Automatic debt dynamics (selected): -1.5, -1.0, -1.0, -2.8, -1.8, -2.2, -2.0, -2.1, -2.8, -2.9, -2.6.
  - Contribution from interest rate/growth differential (selected): 0.2, -2.7, -0.9, -3.0, -1.7, -2.4, -2.4, -2.5, -3.0, -2.9, -2.6.
- Gross financing need (percent of GDP) (selected): 4.7, 3.5, 2.0, 4.9, 10.2, 4.1, 4.3, 4.2, 4.1, 4.1, 5.2.
- PV of public sector debt (selected): 25.0, 25.1, 30.6, 31.6, 32.1, 32.5, 32.5, 33.8, 34.8.
  - PV of public sector debt-to-revenue and grants ratio (in percent) (selected): 138.1, 113.1, 123.6, 124.1, 125.7, 127.2, 127.6, 131.1, 131.5.
  - PV of public sector debt-to-revenue ratio (in percent) (selected): 174.6, 157.0, 179.2, 179.2, 179.7, 178.5, 174.5, 171.2, 162.3.
- Primary deficit that stabilizes the debt-to-GDP ratio (selected): 0.2, 5.4, -3.6, 2.3, -4.7, 2.1, 2.1, 2.2, 2.8, 2.8, 3.7.

### IMF program review, policy priorities, and risks
- IMF Executive Board action:
  - Completed first review under the three-year, SDR 78.96 million Extended Credit Facility (ECF) arrangement approved March 16, 2012.
  - Approved an immediate disbursement equivalent to SDR 11.28 million (about US$16.9 million), bringing total disbursements under the arrangement to SDR 22.56 million (US$33.8 million).
  - Approved a waiver for nonobservance of the performance criterion on new non-concessional external debt with maturities of one year or more.
- 2012 economic outcomes:
  - Economic growth estimated at over 11 percent in 2012, driven by a new oil project coming onstream and a rebound in agricultural production.
  - Average inflation estimated to have remained slightly below 1 percent.
  - Credit to the private sector expanded significantly.
  - Current account deficit projected to decline reflecting petroleum production leading to net exports of petroleum products.
- Fiscal developments and program implementation:
  - Fiscal revenues in 2012 increased relative to 2011 but likely fell short of program targets due to weaknesses in customs and oil revenue.
  - All end-June quantitative performance criteria were met but at the expense of expenditure constraint; several end-September fiscal targets were missed as spending increased to bring poverty-reducing spending back in line with program targets and due to an increase in military spending.
  - The continuous performance criterion on non-concessional borrowing was breached because of contracting a non-concessional loan with the Republic of Congo; a waiver was granted as the loan was cancelled before disbursing.
  - Majority of structural reforms were implemented albeit with delays; a plan to stem losses at the oil refinery was developed for implementation in 2013.
- 2013 program goals and risks:
  - Key goals: tackle revenue weaknesses (including strengthening the oil refinery's financial position and customs measures); create fiscal space for development spending while maintaining debt sustainability; rebuild government deposits at the central bank; implement structural reforms (budget execution, treasury management, domestic revenue collection); enhance oversight of the natural resource sector; continue reforms for financial development and the business environment.
  - Macro projections for 2013: growth projected at 6¼ percent and inflation projected to remain moderate.
  - Risks: tilted to the downside owing to fragile regional security, frequent climatic shocks (e.g., August 2012 floods), commodity price uncertainty, and potential delays in natural resource sector projects.

### Statistical issues, technical assistance, and data adequacy
- Data adequacy:
  - Data provision has some shortcomings but is broadly adequate for surveillance.
  - Niger participates in WAEMU harmonization of statistical methodologies with support from the WAEMU Commission and AFRITAC West.
- National accounts:
  - Compiled annually by the National Institute of Statistics (INS) using SNA93 and ERETES software; renovation and rebasing efforts are behind schedule (new base year 2006 finalized in 2009; 2007 finalized in 2011; work on 2008 just started).
- Price statistics:
  - Harmonized CPI for Niamey compiled monthly since early 1998; rebased in 2008.
- Government finance statistics:
  - Monthly GFS compiled by Ministry of Economy and Finance with a one- to four-month lag; data cover budgetary central government, special funds, and treasury special accounts but not social security administration.
  - Plans to adopt Directive nº10/2009/CM/UEMOA (TOFE) and migrate from GFSM 1986 to GFSM 2001.
- Monetary and balance of payments statistics:
  - Monetary statistics follow the Guide to Money and Banking Statistics in IFS (1984); compiled by national agency of BCEAO and released by BCEAO headquarters with about three-month lag.
  - Balance of payments compiled in conformity with BPM5; published with significant lag.
- Technical assistance provided (selected missions and dates):
  - MCM/AFRITAC W: Public Debt March 2012.
  - FAD: Budget Execution March 2012.
  - FAD/AFRITAC W: Customs Administration May 2012 and December 2012.
  - STA/AFRITAC W: National Accounts August 2012.
  - FAD TTF Mission—MNRW September 2012.
  - FAD: Medium-term expenditure framework October 2012 and January 2013.
  - FAD: PEFA assessment October 2012 and January 2013.
  - FAD: Tax Administration December 2012.
  - FAD/AFRITAC W: Public Financial Management January 2013.
  - FAD: Fiscal Reporting—Accounting January 2013.
  - STA/AFRITAC W: Government Finance Statistics January 2013.
- Resident Representative: Mr. Ahmed Zoromé (took up post in April 2012).

*Source: Country authorities; and staff estimates and projections as presented in the IMF document.*

---