## _wp08245

## Source details

**Canonical URL:** [_wp08245](https://www.imf.org/-/media/websites/imf/imported-full-text-pdf/external/pubs/ft/wp/2008/_wp08245.pdf)

## Other formats

- [Markdown version](/-/media/websites/imf/imported-full-text-pdf/external/pubs/ft/wp/2008/_wp08245.pdf.md)
- [Structured JSON version](/-/media/websites/imf/imported-full-text-pdf/external/pubs/ft/wp/2008/_wp08245.pdf.json)

---

### Introduction and high-level findings
- Contingent liabilities can impair fiscal sustainability and have produced budgetary “surprises.”
- Politicians may prefer contingent liabilities as a “cheap” instrument to achieve objectives because under cash budgeting they can bypass scrutiny.
- Contingent liabilities can create moral hazard by shifting credit risk to government and reducing private-sector scrutiny (example: loan guarantees).
- Credit rating agencies (Standard & Poor’s and Moody’s) increasingly incorporate contingent liabilities—particularly implicit liabilities from public enterprises and potential financial system bailouts—into sovereign credit assessments.
- After the September 2008 takeover of Fannie Mae and Freddie Mac, Standard & Poor’s and Moody’s indicated the bailout did not affect the United States' triple-A sovereign credit ratings.
- Emergent policy responses include: increased disclosure to parliament and the public; integrating contingent liability decisions into the budget process; comprehensive frameworks; and targeted measures to strengthen accountability and discipline.
- Safeguards emphasized: objective criteria for taking contingent liabilities; mechanisms to allocate/share risks with private sector; guidelines for making implicit liabilities explicit; risk management of residual government exposures; and best practices for disclosure.

### Definitions, taxonomy, and accounting/statistical treatment
- Contingent liability (paper’s definition): obligations whose timing and magnitude depend on occurrence of some uncertain future event outside government control; includes possibility of no payment.
- Classification:
  - Explicit contingent liabilities include: loan guarantees; export guarantees; other financial guarantees (exchange rate guarantees; minimum pension guarantees under private pension schemes; income, profit, and rate of return guarantees under PPP arrangements; deposit guarantees; guarantees of pension savings); government insurance programs (crop or flood insurance, war-risk insurance); natural disaster spending for government-responsible infrastructure; legal claims against the government; indemnities; uncalled capital.
  - Implicit contingent liabilities include: bailouts of public enterprises, financial institutions, subnational governments, and private firms considered strategically important or “too big to fail”; natural disaster relief in case of uninsured damage; environmental cleanup spending.
- Accounting vs. statistical vs. cash treatment differences:
  - Accounting (accrual/IPSAS): recognize contingent liabilities when contingency is “more likely than not” (>50 percent) and payments can be reasonably measured; expected value is recognized as a liability (provision).
  - Statistical (GFSM 2001): recognize contingent liabilities only when contingency materializes and payment is made; contingent liabilities disclosed as memorandum items.
  - Cash accounting: recognize expense only when payment is made.
- Reform proposals and harmonization: IASB Exposure Draft (2005) proposed recognizing contingent liabilities immediately at fair value; International Task Force exploring harmonization across SNA 1993, ESA-95, GFSM 2001, and IFRS/IPSAS.

### Empirical magnitudes and notable numeric observations
- Fiscal bill of financial system bailouts averaged about 13 percent of GDP in some 40 crisis episodes, but was as high as 55 percent in specific cases.
- Standard & Poor’s estimate: average fiscal exposure to risk from the financial sector, during a reasonable worst case banking crisis, was about 27 percent of GDP across some 75 countries rated in mid-2008.
- For the U.S., Standard & Poor’s estimated exposure at 24½ percent of GDP.
- Natural disasters and terrorist-related events have sometimes produced economic losses reaching 200 percent of GDP (example: Hurricane Ivan in Grenada in 2004).
- Fogape (Chile) default rate on credits receiving the guarantee has been 1.05 percent.
- Chile reports expected gross annual payments for PPP system over the next 20 years and summarizes risks using 5, 50, and 95 percentiles of the probability distribution of cash payments.
- Colombia reports expected and unexpected annual losses over the next 10 years and uses a 99 percent probability for unexpected losses; reports NPV of expected and unexpected losses.
- Disclosure thresholds exemplified: Australia uses face value thresholds of $20 million in any one year or $40 million over the forward estimates period for guarantees/indemnities and lawsuits.
- Contingency reserve examples: contingency reserves commonly below 3 percent of total spending; Chile Pension Reserve Fund financed by annual transfers of at least 0.2–0.5 percent of GDP until UF900 million accumulated.
- Global catastrophe bond market by end-2006: 89 catastrophe bonds with outstanding principal of $8.5 billion. Mexico issued $160 million catastrophe bonds in 2006.
- World Bank Deferred Drawdown Option and Catastrophe Risk Deferred Drawdown Option (launched in 2008) provide bridge financing up to 0.25 percent of GDP or $500 million, whichever is smaller.
- U.K. Contingency Fund Act (1974) caps urgent expenditures at 2 percent of previous year’s expenditures. U.S. state “rainy day” funds typically capped at 2–10 percent of the state’s budget.

### Frameworks and ex ante decision-making principles
- Decision-making should follow an established process embedded in a broader framework with objectives to: understand risks; guide when liabilities are acceptable; ensure accountability through records of decisions.
- Country principles and examples:
  - Australia Financial Management Guidance No. 6: government should not enter guarantees/indemnities unless an explicitly identified risk exists; expected benefits outweigh costs; demonstrable need for government to accept risks; alternatives explored; agencies assessed specific risks; potential losses rigorously investigated; state adequately protected; price of risk incorporated into value-for-money considerations; appropriate risk management arrangements in place.
  - Canada principles: sponsoring department must demonstrate project cannot be financed on reasonable terms without government loan/guarantee; cash flow adequacy; consideration of upside sharing where government bears significant downside risks.
  - European Commission state aid framework: limits provision of guarantees to avoid impairing competition; specifies allowable spending, individual project caps, and permitted uses.
- PPP-specific frameworks: national PPP legislation commonly requires cost-benefit analysis, value-for-money demonstration, and rigorous risk assessment; UNCITRAL (2001) recommends leaving risk allocation to contracts rather than PPP legislation.

### When to accept contingent liabilities (economic rationale)
- Correct market failures: imperfect information, asymmetric information, and externalities.
- Imperfect information: government may underwrite or collect payments more efficiently (example: Chile’s FOGAPE).
- Asymmetric information: leads to adverse selection and moral hazard; missing markets (e.g., terrorism insurance post-September 11) justify government loss-sharing programs (see Box 1).
- Externalities: activities with unpriced social costs/benefits may justify government intervention; negative externalities from bank failures often justify bailouts, deposit guarantees, and preventive regulation.

### Pricing, issuance safeguards, and underwriting practices
- Methods to estimate expected cost/market value include: educated guesses; market or historical data; option pricing models; simulation methods (Monte Carlo).
- Choice depends on data availability and cost: option pricing useful for relatively small guarantees; simulations used when comparables are hard to find and guaranteed amounts are large.
- Country practices:
  - Sweden uses market data, option pricing and simulations.
  - Chile, Colombia, Peru use simulations for PPP minimum revenue guarantees.
  - Chile used option pricing for exchange rate guarantees under PPPs.
  - FDIC uses expected loss estimates from historical and institution-specific loss data.
  - Korea uses investment rating agencies to assess likelihood of payments on explicit contingent debts.
- Flat-fee programs commonly charge commercial banks a fee ranging from 0.25–6 percent of face value for SME guarantee programs.
- Fogape fee adjustment example: in June 2004, increased annual charge from 1 percent to between 1–2 per cent of loan amount depending on default performance; fees currently covering the average default rate of 1.05 percent.
- Underpricing risks and institutional mitigation:
  - Separation recommended between decision to issue guarantees and pricing decisions (examples: Colombia, Sweden public debt office; U.S. departments price guarantees with OMB oversight).
  - Clear methodological guidelines help mitigate underestimation incentives.

### Parliamentary, audit, and approval mechanisms
- Parliamentary approval rationale: explicit contingent debts are similar to conventional debt and should be decided in budgetary context.
- About half of OECD countries require parliamentary approval of loan guarantees (examples listed).
- About a third require parliamentary approval of PPPs (examples listed).
- Parliamentary approval can be for individual guarantees, programs, or overall guarantee budgets; many countries use overall ceilings to force trade-offs.
- Example ceilings/controls: South Africa’s National Treasury limits sum of net debt and contingent liabilities (face value) to 50 percent of GDP. Flow limits on new guarantees exist in Chile, India, Netherlands, Norway, Pakistan, Portugal, Russia.
- Supreme audit institutions commonly audit contingent debts; Intosai public debt committee recommends extending SAI mandates to audit contingent debt and disclosure completeness.

### Budgeting and fiscal treatment of guarantee subsidy costs
- Budgeting expected cost (subsidy element) treats guarantees like direct subsidies and transfers and removes incentive to disguise subsidies.
- Practices:
  - NPV appropriation upon issuance used in Canada, Netherlands, New Zealand, Norway, United States.
  - Annual expected losses budgeted on a cash basis in Sweden and Colombia.
  - U.S. Federal Credit Reform Act (1990): requires estimated long-term cost of loan guarantees calculated on a net present value basis and included in issuing entity’s budget; costs reestimated annually with automatic appropriation for increases beyond government control.
  - Colombia fiscal responsibility legislation: government must budget at least 15 percent of liabilities that affect future budgets in the year issuance is authorized (with few exceptions).
- Practical difficulties: costly models, choosing discount rates, periodic reestimation, securing additional appropriations, political resistance to accrual budgeting.

### Limiting, converting, and managing implicit liabilities
- Implicit liabilities often the most costly due to open-endedness and moral hazard.
- Evidence: governments providing open-ended liquidity support and blanket deposit guarantees incurred much higher costs resolving financial crises.
- Policy measures to limit implicit liabilities:
  - Strengthen regulatory framework: ex-ante regulation (borrowing limits, fiscal monitoring) and ex-post insolvency mechanisms.
  - Convert implicit into explicit but limited arrangements: introduce compulsory membership, tools to blunt moral hazard (caps, disclosure, loss-mitigation), risk-reflective premiums, and clear residual-risk frameworks (bank resolution, prudential supervision).
  - Examples: introduction of deposit insurance or flood insurance to replace implicit open-ended support.

### Managing retained risk: funding instruments and operational practices
- Need for systematic monitoring of exposures and securing funding for realized losses.
- Instruments for low impact liabilities:
  - Budget flexibility: contingency reserves (commonly <3 percent of total spending), supplementary budgets, reallocations, contractual time lags between calls and payments (example: concession contracts in Chile).
  - Contingency reserve funds: financed by guarantee fees (Chile, Colombia, Sweden, U.S.), insurance premia, budget transfers, earmarked taxes; actual funds invest in financial assets; notional reserve funds pool resources in treasury single account. Trade-offs: actual funds increase gross debt but not net debt; notional funds reduce gross debt but offer less ring-fencing.
  - Earmarking vs pooling trade-off: earmarking aids pricing adequacy assessment; pooling increases diversification.
  - Example parameters: Chile Pension Reserve Fund annual transfers at least 0.2–0.5 percent of GDP until UF900 million accumulated.
- Instruments for high impact liabilities:
  - Insurance and hedging: market insurance limited but growing; Mexico issued $160 million catastrophe bonds in 2006; global catastrophe bond market end-2006: $8.5 billion outstanding principal; CCRIF established in 2007.
  - Insurance often cost-effective only for very large, low-probability/high-severity events (market participants usually avoid catastrophe bonds below $100–$800 million).
  - Self-insurance via calamity funds preferred for moderate and small risks.
  - Environmental liabilities examples: estimated at around 2.3 percent of GDP in the U.S. at end-2006 and about 0.4 percent of GDP in Canada at end-March 2007.
  - Contingency and emergency loans: World Bank Deferred Drawdown Option and Catastrophe Risk Deferred Drawdown Option (2008) provide up to 0.25 percent of GDP or $500 million, whichever is smaller; Interamerican Development Bank Immediate Response Facility.
  - Low-income countries often rely on international aid for post-disaster financing.

### Disclosure requirements, practices, and recommended content
- Rationale: appropriate disclosure makes fiscal decisions more informed and can trigger corrective action.
- Key disclosure principles:
  - Institutionalize disclosure in legislation.
  - Adopt internationally-accepted public sector accounting standards (IPSAS).
  - Provide meaningful information without overwhelming detail.
  - Disclose face value, expected cost where feasible, and indication of uncertainty.
  - Explain government policy, legal basis, beneficiaries, and mitigation measures.
  - Set safeguards and criteria for nondisclosure exemptions.
  - Assign clear responsibility for accurate reporting.
  - Disclose via budget documentation, financial statements, and agency websites.
- IPSAS disclosure specifics: contractual contingent liabilities disclosed in notes when possibility of payment is not remote; IPSAS 19 lists required items including nature, timing, uncertainties, reimbursements, opening/closing amounts and changes.
- GFSM 2001: aggregate data on important contingent liabilities as memorandum item to balance sheet.
- Recommended elements to disclose:
  - Classification by major category.
  - Rationale for taking on contingent liabilities for each category.
  - Fiscal significance: (a) total exposure under the liability (face value); (b) expected fiscal cost (NPV or annual cash flows) where feasible; (c) indication of uncertainty (e.g., unexpected loss at given probability).
  - Major individual contingencies above a country-specific threshold: description and quantification.
  - Significant terms and conditions that could trigger liabilities.
  - Past calls on government guarantees.
  - Public policy purpose, duration, intended beneficiaries for each new contingent liability.
  - Reserve assets set aside against contingencies and remaining loss exposure.
- Country disclosure practices:
  - Many countries disclose explicit loan guarantees; PPP-related guarantees disclosure less widespread.
  - Measures used: face value (most common); expected cost or unexpected loss reported by Chile, Colombia, Peru (Chile uses a 95 percent confidence level; Colombia uses 99 percent); ranges for some U.S. lawsuits.
  - Implicit liabilities generally not quantified to avoid reinforcing moral hazard; some countries discuss implicit risks narratively.
  - Gradual disclosure improvement example: Chile phased disclosure across years for different categories.
  - New Zealand and Australia pioneered contingent liability disclosure.

### Institutional arrangements: centralization, DMOs, specialized units, and PPP units
- Recommendation: centralize monitoring of all public contingent liabilities in the fiscal policy-making institution to assess fiscal risks and systemic exposure.
- Integrating contingent liability management with conventional debt management (DMO/ALM) has advantages: shared expertise in risk quantification, coordination of guaranteed and conventional debt issuance, managing funding risk, obtaining contingency loans; examples: Colombia, Morocco, New Zealand, Slovenia, Sweden; ALM branches in New Zealand and South Africa.
- Alternative placements: contingent liability management can reside in treasury or finance departments (examples: Ireland, Poland, Portugal).
- Specialized units: where sector/project expertise required (PPPs, export guarantees, student loans, SME guarantees, deposit insurance), specialized units may manage programs but should report to central entity responsible for overall management.
- Sweden example: Swedish National Debt Office manages general guarantees while four agencies manage special guarantee programs (export credit, housing, international aid, deposit insurance).
- PPP central units reporting to Ministry of Finance are common (examples: Czech Republic, Egypt, Greece, Ireland, Portugal, South Africa, State of Victoria (Australia), U.K.); functions include PPP policy advice, proposal assessment, tender advice, data compilation, and evaluation.

### Recommendations and institutional priorities (conclusion)
- Centralize monitoring of all public contingent liabilities in the fiscal policy-making institution to capture implicit and explicit fiscal exposure.
- Consider centralizing management of contingent liabilities and integrating with conventional debt and asset management where capacity and public financial management systems permit.
- If centralization is impractical due to specialized expertise requirements, establish specialized units (e.g., PPP units) that report to the central entity responsible for overall management of guarantees and fiscal risks.
- Implement a comprehensive ex ante framework to mitigate moral hazard, require risk-sharing, charge beneficiaries where appropriate, and ensure parliamentary and audit scrutiny.
- Adopt funding strategies appropriate to risk profiles: budgetary flexibility or self-insurance for routine risks; market insurance or hedging for catastrophic risks.
- Disclose contingent liabilities in line with international accounting and fiscal transparency standards, balancing meaningfulness with manageability of disclosure.

*Source: _wp08245 — 4. Institutional Arrangements for Managing PPP Risks; Annex I; Box 1; Box 3; Part I; References.*

### References..............................................................................................................

### _wp08245 - References............................................................................................................................... 57

### Tables
- 1. Contingency Funds to Meet Calls on Contingent Liabilities: Selected Examples ..............30
- 2. IPSAS: When to Recognize and Disclose Contingent Liabilities .......................................34
- 3. Accounting/Statistical Standards and Transparency Initiatives: What to Disclose .............35
- 4. Legislative Requirements to Disclose Fiscal Risks: Selected Country Examples...............38
- 5. Disclosing the Magnitude of Contingent Liabilities: Selected Country Examples .............42
- A1. Summary of the Main Requirements for Recognition and Disclosures of Contingent Liabilities .................................................................................................................................53

### Figures
- 1. Typical Infrastructure PPP Project Risks and Hypothetical Allocation ......................... 14
- A1. The Swedish Debt Office Simulation Model ....................................................................56

### Boxes
- 1. Market Failure and Terrorism Insurance...........................................................................11
- 2. When Are Guarantees Preferable to Other Forms of Support?...............................................12
- 3. Estimating the Expected Cost and Market Value of Guarantees.....................................................17

*Source: _wp08245 - References..............................................................................................................*

### 4. Institutional Arrangements for Managing PPP Risks......................................................47

### 4. Institutional Arrangements for Managing PPP Risks......................................................47

### Introduction
- Contingent liabilities can impair fiscal sustainability and have produced budgetary “surprises.”
- Politicians may prefer contingent liabilities as a “cheap” instrument to achieve objectives because under cash budgeting they can bypass scrutiny.
- Contingent liabilities can create moral hazard by shifting credit risk to government and reducing private-sector scrutiny (example: loan guarantees).
- Credit rating agencies (Standard & Poor’s and Moody’s) increasingly incorporate contingent liabilities—particularly implicit liabilities from public enterprises and potential financial system bailouts—into sovereign credit assessments.
- After the September 2008 takeover of Fannie Mae and Freddie Mac, Standard & Poor’s and Moody’s indicated the bailout did not affect the United States' triple-A sovereign credit ratings.
- Policy responses in many countries include: increased disclosure to parliament and the public; integrating contingent liability decisions into the budget process; comprehensive frameworks; and targeted measures to strengthen accountability and discipline.
- Safeguards discussed: objective criteria for taking contingent liabilities; mechanisms to allocate/share risks with private sector; guidelines for making implicit liabilities explicit; risk management of residual government exposures; and best practices for disclosure.
- The paper synthesizes issues on nature, management, and disclosure of contingent liabilities and surveys country practices to identify emerging consensus and good practices.

### Background — definitions, taxonomy, and accounting/statistical treatment
- Contingent liability (paper’s definition): obligations whose timing and magnitude depend on occurrence of some uncertain future event outside government control; includes possibility of no payment.
- Accounting vs. statistical vs. cash treatment differences:
  - Accounting (accrual) recognize contingent liabilities when contingency is “more likely than not” and payments can be reasonably measured; expected value is recognized as a liability.
  - Statistical standards (GFSM 2001) recognize contingent liabilities only when the contingency materializes and payment is made, to avoid overlap between public and private sector balance sheets.
  - Cash accounting recognizes expense only when payment is made.
- Proposals to reform standards lean toward immediate recognition as liabilities; contractual obligation to enter contingent liabilities is viewed as a liability in its own right, with uncertainty reflected in measurement (see Annex I).
- Classification:
  - Explicit contingent liabilities (based on contracts, laws, clear policy commitments) include:
    - Loan guarantees
    - Export guarantees
    - Other financial guarantees (exchange rate guarantees; minimum pension guarantees under private pension schemes; income, profit, and rate of return guarantees such as under PPP arrangements; deposit guarantees; guarantees of pension savings)
    - Government insurance programs (crop or flood insurance, war-risk insurance)
    - Natural disaster spending for infrastructure directly under government responsibility
    - Legal claims against the government
    - Indemnities
    - Uncalled capital (obligation to provide additional capital on demand to an entity of which government is a shareholder)
  - Implicit contingent liabilities (political or moral obligations; expectations government will intervene) include:
    - Bailouts of public enterprises, financial institutions, subnational governments, and private firms that are strategically important or “too big to fail”
    - Natural disaster relief in case of uninsured damage
    - Environmental cleanup spending
- Empirical and cross-country magnitude:
  - Implicit liabilities have generally been the most costly.
  - Fiscal bill of financial system bailouts averaged about 13 percent of GDP in some 40 crisis episodes, but was as high as 55 percent in specific cases (Laeven and Valencia, 2008).
  - Standard & Poor’s estimate: average fiscal exposure to risk from the financial sector, during a reasonable worst case banking crisis, was about 27 percent of GDP across some 75 countries rated in mid-2008.
  - For the U.S., Standard & Poor’s estimated exposure at 24½ percent of GDP.
  - Natural disasters and terrorist-related events have sometimes produced economic losses reaching 200 percent of GDP (example: Hurricane Ivan in Grenada in 2004).

### Mitigating risks associated with contingent liabilities
- Premise: Avoiding all contingent liabilities is neither realistic nor feasible; focus is on which contingent liabilities to accept and why.
- Emerging good practices emphasize:
  - Dealing with risks before taking them on through frameworks that guide decisions and safeguards.
  - Transferring risks or costs to the private sector where feasible.
  - Early parliamentary involvement and proper budgeting for risks.
- A. Frameworks for dealing with risks from contingent liabilities
  - Decision-making should follow an established process embedded in a broader framework: objectives are understanding risks, guiding when liabilities are acceptable, and ensuring accountability through records of decisions.
  - Examples of country frameworks and principles:
    - Australia: Financial Management Guidance No. 6 requires that government not enter into guarantees/indemnities unless: an explicitly identified risk exists; expected benefits objectively outweigh level and cost of risks; demonstrable need for government to accept risks; alternatives (including commercial insurance) were fully explored; agencies assessed specific risks; potential losses rigorously investigated and identified; state adequately protected; price of risk incorporated into value-for-money considerations; and appropriate risk management arrangements are in place.
    - Canada: Principles require sponsoring department demonstrate project cannot be financed on reasonable terms without government loan/guarantee; cash flow adequate to cover repayment, interest, operating cost and yield satisfactory rate of return; and where government bears significant downside risks, consideration of upside sharing if project succeeds.
    - European Union: European Commission framework for state aid (including guarantees) limits provision of guarantees to certain activities to avoid impairing competition; state aid rules specify allowable spending, individual project caps, and permitted uses.
  - PPP-specific frameworks:
    - National PPP or international legislation (examples referenced: Australia, Colombia, Greece, Ireland, Portugal, South Africa, U.K.; and EU) often reflect risk allocation because it affects balance-sheet treatment of investment assets.
    - Common requirements: projects must pass cost-benefit analysis, provide value for money, and include rigorous risk assessment.
    - Note: UNCITRAL (2001) recommends leaving risk allocation to contracts rather than PPP legislation because each project may require different risk allocations.
  - Ad hoc mechanisms:
    - U.S. experience: Congress created independent boards to consider loan guarantee applications under temporary loan guarantee programs (steel, oil and gas, airline, rural television industries). Positive experience attributed to board independence (representatives from Federal Reserve, Treasury, relevant Department) reducing lobbying influence and focusing on analytical evaluation of social net benefits.
- B. When to take on contingent liabilities?
  - Accepted rationale: correct market failures (imperfect information, information asymmetries, externalities).
  - Imperfect information:
    - If government can underwrite or collect payments more efficiently, intervention may be justified (e.g., Chile’s FOGAPE guarantee scheme improved access to credit for creditworthy borrowers without sufficient collateral).
    - Government might alternatively subsidize private lenders’ information gathering or buy loans outright rather than provide guarantees—subject to moral hazard considerations.
  - Asymmetric information:
    - Leads to adverse selection and moral hazard; insurance markets may fail (example: lack of affordable flood insurance; crop insurance in farming areas).
    - Missing risk markets can occur (example: terrorism insurance unavailability after September 11, 2001), prompting government loss-sharing programs (see Box 1).
    - Severe downturns can cause credit market freezes—temporary government interventions (e.g., temporary airline loan guarantee program in U.S. after September 11, 2001; large-scale SME lending guarantee program in Japan during the 1997–98 crisis) are examples.
  - Externalities:
    - Activities generating unpriced social costs/benefits may justify government taxing or subsidizing (including subsidized guarantees).
    - EU state aid rules allow subsidization through guarantees for activities promoting economic development (developing disadvantaged regions; promoting SMEs; research and development; protection of the environment; training; employment; culture) where benefits outweigh competition distortion.
    - Negative externalities from bank failures (contagion, macroeconomic disruption) often justify interventions: bailouts, deposit guarantees, and preventive measures to reduce insolvencies.

*Source: _wp08245 - 4. Institutional Arrangements for Managing PPP Risks......................................................47*

### Box 1. Market Failure and Terrorism Insurance

### Box 1. Market Failure and Terrorism Insurance

### Background: pre-September 11, 2001 market conditions
- Insurers provided terrorism coverage to their commercial customers "essentially free of charge" because the chance of property damage from terrorist acts was considered remote.
- After September 11, 2001, insurers reassessed risks and "for a while terrorism insurance was scarce."

### U.S. policy response: Terrorism Risk Insurance Act (TRIA)
- Concerned about limited availability of terrorism coverage in high-risk areas and its impact on the economy, Congress passed the Terrorism Risk Insurance Act (TRIA).
- TRIA provides a temporary program that, in the event of a major terrorist attack, allows the insurance industry and federal government to share losses according to a specific formula.
- TRIA was signed into law on November 26, 2002 and renewed for another two years in December 2005.
- Passage of TRIA enabled a market for terrorism insurance to begin to develop because the federal backstop effectively limits insurers’ losses, greatly simplifying the underwriting process.
- According to the insurance industry, TRIA (recently extended to 2014) is the reason that terrorism coverage is now available.

### Assessments of insurability and official reports
- The U.S. Government Accountability Office and the President’s Working Group on Financial Markets published reports on terrorism insurance in September 2006.
- The two reports "essentially agree that risk from nuclear, biological, chemical, and radiological attacks is uninsurable, both because of the adverse selection involved and because of the uncertainty involved in predicting the frequency of terrorism attacks."

### International experience
- Several other countries created programs to cover terrorism, either after September 11 or following earlier terrorist attacks on their own soil: Australia, Austria, Belgium, France, Germany, Netherlands, Spain, Switzerland, United Kingdom.

*The discussion draws on III, 2008.*

### Box 3. Estimating the Expected Cost and Market Value of Guarantees

### Box 3. Estimating the Expected Cost and Market Value of Guarantees

### Methods for estimating expected cost and market value
- Methods range from educated guesses, to market or historical data, to quantitative models, such as option pricing and simulations (these are discussed in more detail in Annex II).
- Choice of method depends on availability of data and cost of the method.
  - Valuations based on market data are used when the borrower issues debt quoted in the market or when it is relatively easy to find comparable companies that do so.
  - When comparable market data are difficult to find, simulation methods are frequently used; simulations may be time consuming and expensive to develop and may be cost effective only if the guaranteed amounts are large.
  - Option pricing models may be a good substitute when guarantees are relatively small (Hagelin, 2003).
  - Where data are so limited that neither market-based nor simulation methods are feasible, a simple classification of guarantees into high, medium, low, or very low default risks (with associated probabilities of default)—based on available information or educated guesses—could be employed to assess expected losses.
- Any reasonable approach will produce better estimates of the cost of loan guarantees than the cash-based approach that will always assume zero cost in the budget year.

### Country and institution practices and examples
- Sweden uses market data, option pricing and simulations for pricing guarantees.
- Chile, Colombia, and Peru use simulations to estimate contingent liabilities associated with minimum revenue guarantees under PPP arrangements.
- Chile also used option pricing methods to value exchange rate guarantees under PPP arrangements, when these were provided.
- The Federal Deposit Insurance Corporation in the U.S. uses expected loss estimates derived from historical and institution specific loss data.
- Korea uses investment rating agencies to assess the likelihood of payments on explicit contingent debts.

### Flat-fee programs and fee adjustment practices
- A flat fee is also used in guarantee programs involving many borrowers; these fees generally aim to reflect the average cost for the program as a whole.
- Example: guarantee programs for SMEs in a wide range of emerging economies charge commercial banks benefiting from the guarantee a fee ranging from 0.25–6 percent of its face value (see Bennett et al., 2005).
- As guarantee programs expand and gain experience, rates are often adjusted to bring the fee closer to the actual cost of guarantees.
- Example: In June 2004, the Chilean FOGAPE scheme increased its annual charge from the previous rate of 1 percent to a rate of between 1–2 per cent of the loan amount depending on the guarantee default performance of participating banks (hence the risks involved), with the fees currently covering the average default rate of

*Source: Box 3. Estimating the Expected Cost and Market Value of Guarantees (excerpt).*

### 1.05 percent on credits receiving the guarantee (Honohan, 2006; Benavente et al. 2006).

### _wp08245 - 1.05 percent on credits receiving the guarantee (Honohan, 2006; Benavente et al. 2006).

### Pricing and issuance safeguards for guarantees
- Underpricing risks:
  - Ministries sponsoring guarantees may underestimate costs to facilitate projects; separation of the decision to issue guarantees from pricing decisions is recommended to avoid biased cost/risk assessment.
  - Examples of institutional separation: responsibility delegated to public debt office (Colombia, Sweden). In the U.S., departments price guarantees but the Office of Management and Budget has overall responsibility for estimates.
  - Checks and balances can mitigate underestimation incentives; Congressional Budget Office and General Accounting Office studies have not found systematic bias in the U.S. (Kraan, 2004; Honohan, 2008).
  - Clear guidelines on methodology for pricing contingent liabilities help mitigate incentives to underprice.

- Excessive underwriting and budgetary treatment:
  - If guarantee fees are recorded as budget revenues without appropriating expected guarantee costs as expenditures, fee-based guarantees can make fiscal position appear artificially improved.
  - Off-budget guarantee funds can create incentives to expand guarantees unless information on outstanding guarantees and expected costs is disclosed (example: Sweden).
  - Recommended countermeasures: budget for the full subsidy cost of guarantees and/or place overall ceilings on stock or flow of guarantees.

- Specific data point on guarantee program performance:
  - Fogape (Chile) default rate on credits receiving the guarantee has been 1.05 percent.

### Parliamentary and external approval mechanisms
- Parliamentary approval:
  - Rationale: explicit contingent debts are similar to conventional debt and should be decided in budgetary context.
  - About half of OECD countries require parliamentary approval of loan guarantees (examples include Belgium, Canada, Finland, France, Germany, Greece, Iceland, Italy, Poland, Spain, Sweden, U.K., U.S.).
  - About a third require parliamentary approval of PPPs (examples include Denmark, Iceland, Italy, Mexico, Norway, Poland, Sweden, Turkey, U.K.).
  - Parliamentary approval can be for individual guarantees, guarantee programs, or overall guarantee budgets; many countries use overall ceilings to force trade-offs.
  - Examples of ceilings and controls:
    - South Africa: National Treasury’s risk management guidelines limit the sum of net debt and contingent liabilities (measured at face value) to 50 percent of GDP.
    - Many countries set limits on flows of new guarantees (Chile, India, Netherlands, Norway, Pakistan, Portugal, Russia).

- External control by SAIs:
  - Supreme audit institutions commonly audit contingent debts; scope varies from accuracy of disclosures to performance audits assessing fiscal exposures and value for money.
  - Intosai public debt committee recommendations for SAIs include extending mandates to audit contingent debt, assessing completeness and adequacy of quantification and reporting, and scrutinizing budgeting for contingent debts.

### Budgeting and fiscal treatment of guarantee subsidy costs
- Principles and practices:
  - Budgeting the expected cost (subsidy element) of guarantees puts guarantees on equal footing with direct subsidies and transfers, eliminating incentives to disguise subsidies via guarantees.
  - Practices:
    - Net present value (NPV) appropriation upon issuance used in Canada, Netherlands, New Zealand, Norway, United States.
    - Annual expected losses budgeted on a cash basis in Sweden and Colombia.
  - U.S. Federal Credit Reform Act (1990) requires estimated long-term cost of loan guarantees calculated on a net present value basis and included in issuing entity’s budget; costs reestimated annually with automatic expenditure appropriation for increases due to factors outside government control.
  - Colombia: fiscal responsibility legislation requires the government to budget at least 15 percent of the liabilities that affect future budgets during the year in which their issuance is authorized (with few exceptions).

- Practical difficulties:
  - Estimation challenges: costly models, choosing discount rates, need for periodic reestimation and securing additional appropriations.
  - Resistance may arise to budgeting only selected items on an accrual basis.

### Limiting and converting implicit liabilities
- Implicit liabilities:
  - Often the most costly due to open-ended nature and moral hazard from bailout expectations.
  - Evidence: governments providing open-ended liquidity support and blanket deposit guarantees incurred much higher costs resolving financial crises (Honohan and Klingebiel, 2003).
  - Reserve Bank of Australia survey (2006) found pervasive expectation of government bailouts even where explicit no-bailout policy existed.

- Policy to limit implicit liabilities:
  - Strengthen regulatory framework: ex-ante regulation (borrowing limits, fiscal monitoring) and ex-post insolvency mechanisms to enforce hard budget constraints.
  - Where implicit liabilities are politically binding, consider making them explicit but limited, charging beneficiaries for explicit guarantees.
  - Design elements for explicit replacement frameworks:
    - Compulsory membership (overcoming adverse selection);
    - Tools to blunt moral hazard (caps, disclosure, loss-mitigation requirements);
    - Risk-reflective premiums;
    - Clear frameworks for residual risks (e.g., bank failure resolution, prudential supervision).
  - Example: introduction of deposit insurance or flood insurance to replace implicit open-ended support.

### Managing retained risk from contingent liabilities
- Need to monitor exposure systematically and secure funding for realized losses.
- Instruments for low impact liabilities:
  - Budget flexibility:
    - Contingency reserves commonly included in budgets but usually small (below 3 percent of total spending).
    - Budget provisions allowing spending in excess of approved budget in specified contingencies exist in several OECD countries and in some constitutions (Austria, Finland, Germany, Japan).
    - Other options: supplementary budgets, reallocations, contractual time lags between calls and payments (example: concession contracts in Chile).
  - Contingency reserve funds:
    - Fund financing sources: guarantee fees (Chile, Colombia, Sweden, U.S.), premia for insurance schemes, budget transfers or earmarked taxes for calamity funds.
    - Types:
      - Actual funds invest resources in financial assets (government bonds or AAA securities).
      - Notional reserve funds pool resources into treasury single account (U.S., Swedish guarantee fund).
    - Trade-offs:
      - Actual funds increase gross debt but not net debt (deposits offset borrowing); notional funds reduce gross debt but offer less ring-fencing.
    - Fees can be earmarked per program or pooled; earmarking aids pricing adequacy assessment but reduces pooling flexibility.
    - Example contingency fund parameters:
      - Chile Pension Reserve Fund financed by annual transfers from the budget of at least 0.2–0.5 percent of GDP until UF900 million accumulated.
      - Fogape fees: 1–2 percent of the guarantee used; default rate on credits receiving the guarantee has been 1.05 percent.
      - U.K. Contingency Fund Act (1974) caps urgent expenditures at 2 percent of previous year’s expenditures.
      - U.S. state “rainy day” funds typically capped at 2–10 percent of the state’s budget; some states have no limit.

- Instruments for high impact liabilities:
  - Insurance and hedging:
    - Market insurance for catastrophic/environmental risk is limited but growing; Mexico issued $160 million catastrophe bonds in 2006.
    - Global catastrophe bond market by end-2006: 89 catastrophe bonds with outstanding principal of $8.5 billion.
    - Caribbean Catastrophe Risk Insurance Facility (CCRIF) established in 2007 to provide immediate liquidity for hurricane/earthquake losses and lower premiums via pooling.
    - Insurance decisions should be based on cost-benefit analysis; market insurance often cost-effective only for very large, low-probability/high-severity events (market participants often avoid catastrophe bonds below $100–$800 million).
    - Self-insurance via contingency calamity funds often preferred for moderate and small risks.
    - Environmental liabilities examples: estimated at around 2.3 percent of GDP in the U.S. at end-2006 and about 0.4 percent of GDP in Canada at end-March 2007.
  - Contingency and emergency loans:
    - World Bank Deferred Drawdown Option and Catastrophe Risk Deferred Drawdown Option (launched in 2008) provide bridge financing up to 0.25 percent of GDP or $500 million, whichever is smaller.
    - Interamerican Development Bank provides Immediate Response Facility and related instruments for post-disaster operations.
    - Low-income countries often rely on international aid for post-disaster financing.

### Disclosure requirements and practices
- Rationale and principles:
  - Appropriate disclosure of contingent liabilities makes fiscal decisions more informed and can trigger corrective action.
  - Key disclosure principles:
    - Institutionalize disclosure in legislation;
    - Adopt internationally-accepted public sector accounting standards (IPSAS) to strengthen disclosure;
    - Provide meaningful information without overwhelming detail;
    - Disclose face value, expected cost where feasible, and indication of uncertainty;
    - Explain government policy, legal basis, beneficiaries, and mitigation measures;
    - Set safeguards and criteria for any nondisclosure exemptions;
    - Assign clear responsibility for accurate reporting;
    - Disclose via budget documentation, financial statements, and agency websites.

- Accounting and statistical standards:
  - IPSAS requires disclosure of contractual contingent liabilities in notes when possibility of payment is not remote; IPSAS 19 lists detailed disclosure items (nature, timing, uncertainties, reimbursements, opening/closing amounts and changes).
  - GFSM 2001 requires aggregate data on important contingent liabilities as a memorandum item to the balance sheet.
  - IMF Code and OECD Best Practices require contingent liability disclosure in budget documents, mid-year reports, and annual financial statements.

- What to disclose (recommended elements):
  - Classification of outstanding contingent liabilities by major category.
  - Rationale for taking on contingent liabilities for each category.
  - Fiscal significance: (a) total exposure under the liability (face value); (b) expected fiscal cost (NPV or annual cash flows) where feasible; (c) indication of uncertainty (e.g., unexpected loss at given probability).
  - Major individual contingencies above a country-specific threshold: description and quantification where possible.
  - Significant terms and conditions of arrangements that could trigger liabilities.
  - Past calls on government guarantees.
  - Public policy purpose, duration, intended beneficiaries for each new contingent liability.
  - Reserve assets set aside against contingencies and remaining loss exposure.

- Disclosure practices across countries:
  - Many countries disclose explicit loan guarantees; disclosure of PPP-related guarantees is less widespread.
  - Measures used in disclosure:
    - Face value (most common);
    - Expected cost or unexpected loss (reported by Chile, Colombia, Peru; Chile uses a 95 percent confidence level; Colombia at a 99 percent level in some instances);
    - Ranges for some lawsuits (U.S.).
  - Implicit liabilities generally not quantified to avoid reinforcing moral hazard; some countries discuss implicit risks narratively (Chile reports Fuel Price Stabilization Funds and potential banking crisis costs; Indonesia monitors SOE performance).
  - Gradual improvement example: Chile phased disclosure—minimum revenue guarantees and minimum pension guarantees (2003); loan guarantees to public enterprises (2005); student loan guarantees and lawsuits (2006).
  - New Zealand and Australia pioneered contingent liability disclosure; many other countries followed (Brazil, Chile, Colombia, Indonesia, Peru, South Africa).

- Legislative frameworks and materiality:
  - Selected legal requirements to disclose fiscal risks exist (examples: Australia Charter of Budget Honesty Act; Brazil Fiscal Responsibility Law; Chile Fiscal Responsibility Law; Colombia Fiscal Responsibility Law and Law 448 on Managing Contingent Liabilities; New Zealand Public Finance Act; Nigeria Fiscal Responsibility Law; Pakistan Fiscal Responsibility and Debt Limitation Act; Peru Law on Transparency and Access to Public Information; U.K. Code for Fiscal Stability).
  - Some countries adopt materiality criteria and quantitative cutoffs (Australia: > $20 million impact in any one year or $40 million over forward estimates; New Zealand: <$10 million exempt), but materiality should be judged by whether disclosure would affect investor/analyst decisions.
  - Exemptions may apply for national security, negotiation sensitivity, or when fiscal impact cannot be reasonably estimated (New Zealand example), with safeguards to limit abuse.

### Institutional arrangements for managing contingent liabilities
- A well-designed framework needs safeguards, disclosure, monitoring, and mechanisms to manage realized losses.
- The location and centralization of responsibility (e.g., ministry of finance, public debt office, national debt office, guarantee funds) affect implementation but are secondary to the quality of safeguards and processes.
- Strong involvement of the ministry of finance in PPP decisions (e.g., mandatory approval or “gateway” reviews at project stages) is recommended to screen fiscal affordability and value-for-money and to stop or modify proposals deemed too costly or risky.

*Source: _wp08245 - 1.05 percent on credits receiving the guarantee (Honohan, 2006; Benavente et al. 2006).*

### Part I

### _wp08245 - Part I

### Disclosures: country practices and magnitude of contingent liabilities
- Thresholds and reporting triggers:
  - Australia (budget): face value of individual guarantees/indemnities greater than $20 million in one year or $40 million over the forward estimates period (not already recognized on balance sheet) with summary background information, by ministry.
  - The face value of individual lawsuits greater than $20 million in one year or $40 million over the forward estimates period, with summary background information, by ministry.
- Items and metrics disclosed by selected countries:
  - Canada:
    - Guarantees for SOE borrowing: face value of the guarantee.
    - For each guarantee/insurance program and for each law authorizing guarantees: the maximum limit authorized by parliament, where applicable, and the face value of amount actually guaranteed.
    - For the aggregate of guarantees: (i) total gross guarantees; (ii) allowance for losses; and (iii) net exposure under guarantees.
    - For three public corporations that run insurance programs on a self-sustaining basis (deposit insurance, mortgage, export development): (i) insurance in force; (ii) opening balance; (iii) revenues for the period; (iv) expenses for the period; (v) net income for the period; (vi) closing balance; and (vii) 5-year average of net claims paid.
  - Chile:
    - For each law authorizing guarantees: the maximum amount authorized by the law and the amount actually guaranteed, by guaranteed loan and enterprise, with timing when the guarantee was issued.
    - For each outstanding guaranteed loan: details (amount issued, currency, interest, maturity, current stock at par value).
    - Face value of guaranteed debt by authorizing law (authorized amount; currency; stock of guaranteed debt outstanding in local currency, US$ and percent of GDP).
    - Student loans: face value of guaranteed debt in local currency and percent of GDP.
    - Deposit guarantee: maximum amount of deposits subject to guarantee.
    - SME loan guarantees: annual data for the past 9 years: NPLs as a percent of total SME loans from the bank; call on guarantees as a percent of the average loan portfolio over the year.
    - For PPP projects: maximum loss (under minimum revenue guarantees) in case of no traffic: amount, NPV of amount, NPV as share in GDP.
    - Expected gross annual payments for the entire PPP system over the next 20 years; risks summarized as cash flows under 5, 50, and 95 percentiles of the probability distribution of the cash payments, for the entire PPP system.
    - For each project: NPV of expected payments net of collections from concessionaires (local currency; percent of GDP; and share of project in total expected net guarantee payments); evolution of NPV of expected loss over past 5 years.
  - Colombia:
    - Expected annual loss over the next 10 years.
    - Unexpected annual loss (cash flow at risk) over the next 10 years (99 percent probability).
    - NPV of expected losses; NPV of unexpected losses (99 percent).
    - Expected annual payments over the next 10 years; unexpected annual payments over the next 10 years (99 percent probability); NPV of expected costs; NPV of unexpected costs (99 percent).
  - New Zealand (financial statement and budget):
    - Face value of total guarantees and indemnities, with material guarantees disclosed separately each in Note 21 with some description and quantification.
    - Financial statement notes disclose amount claimed (maximum potential cost) with caveat that it does not represent admission or estimation of award against the Crown.
    - Budget: tables with same information, indicating whether contingent liabilities are "unchanged" or "changed" relative to the last financial statement.
  - South Africa:
    - Face value of total guarantees, broken down into domestic and foreign, over the past 3 years; details in Annexure B.
    - Face value of liabilities of Export Credit Insurance corporation reported for last three year.
    - Actuarial value for the past three years for post retirement medical assistance to government employees, government pension funds, the Road Accident Fund and Unemployment Insurance Fund.
  - United States (financial statements):
    - Maximum exposure to insurance claims and guarantee programs (Notes 18, 15) with material effect on balance sheet, with description of nature of contingency.
    - Maximum guaranteed amounts (Note 18, 15), with background information.
    - Expected loss for "probable" contingencies (recorded on balance sheet), and range of expected losses for "reasonably possible" contingencies, with largest cases described and quantified individually (claimed value).
- Other disclosure categories highlighted:
  - Environmental and disposal liabilities.
  - Quasi-fiscal deficit of central bank.
  - International Organizations (callable capital): face value of callable/un‑called capital subscriptions by institution.
  - Unquantifiable liabilities and descriptions of large unquantifiable legal claims (land claims, legal challenges to legislation).
  - Implicit liabilities: e.g., measures to stabilize domestic fuel prices, annual contribution to, withdrawals from, and balances in Fuel Price Stabilization Funds; mention of fiscal cost of a banking crisis of magnitude of the 1980s.

### Institutional arrangements: centralization, DMOs, and specialized units
- Central monitoring recommendation:
  - "The monitoring of all public contingent liabilities should be centralized in the fiscal policy-making institution."
  - Rationale: central government often implicitly or explicitly underwrites liabilities of public sector entities; central monitoring allows overall assessment of fiscal risks and systemic exposure.
- Centralized management vs specialized arrangements:
  - Benefits of centralized management:
    - Systematic evaluation of relationships among various risks affecting government balance sheet.
    - Potential net risk mitigation (identifying natural hedges across parts of public sector).
  - Limits and caveats:
    - Contingent liabilities often entail credit risks or catastrophic risks without natural hedges; therefore they need to be limited by other means (such as ceilings on exposure).
  - Integration with conventional debt management:
    - Argument for integrating management of conventional and contingent liabilities (and assets) in public debt management office (DMO) or asset and liability management (ALM) frameworks.
    - Advantages: shared expertise (risk quantification, coordination of guaranteed and conventional debt issuance, managing funding risk, obtaining contingency loans); ability to adjust conventional debt to manage contingent liability risk given guarantee portfolio illiquidity.
    - Examples of countries integrating contingent liability management into DMO or ALM: Colombia, Morocco, New Zealand, Slovenia, Sweden; ALM branch responsible in New Zealand and South Africa.
  - Alternative placements:
    - In some countries contingent liability management is located outside the DMO (e.g., treasury or finance departments: Ireland, Poland, Portugal).
- Practical constraints and specialized units:
  - When specialized project- or sector-specific expertise is required (e.g., PPPs, export guarantees, student loans, SME guarantees, deposit insurance), management may remain in specialized units.
  - Best practice: specialized units should report to entity in charge of overall management of guarantees/contingent liabilities/fiscal risks to ensure consolidated view of costs and risks.
  - Sweden example: Swedish National Debt Office manages guarantees in general, while four government agencies manage special guarantee programs (export credit, housing, international aid, deposit insurance).
  - PPP practice:
    - Central PPP units that report to or are part of the Ministry of Finance are common (examples include Czech Republic, Egypt, Greece, Ireland, Portugal, South Africa, State of Victoria (Australia), United Kingdom).
    - Central PPP unit functions: advise on PPP policy; accumulate and disseminate knowledge; assess proposals; advise on tender documents and bid evaluation; compile and analyze PPP data; evaluate PPP results and risks.
    - United Kingdom: two main institutions—Partnerships U.K. (a PPP) supports project side; Office of Government Commerce handles PPP policy advice.

### Risk mitigation, management, funding, and disclosure practices
- Mitigating contingent liability risk (pre-commitment measures):
  - Put in place a comprehensive framework guiding policymakers to:
    - Assess the need to enter into contingent liabilities.
    - Assess net social or financial benefits of doing so.
    - Identify players best positioned to bear the risks, and ensure accountability for decisions.
  - Address incentives and costs:
    - Require risk-sharing with the private sector to mitigate moral hazard.
    - Charge beneficiaries for fiscal cost of the liability (unless issued as a subsidy).
    - Treat subsidy cost of contingent liability as budgetary expenditure, where feasible.
  - Ensure external scrutiny:
    - Early parliamentary involvement in decisions to incur contingent liabilities.
    - Submission to audit by national audit institutions.
- Managing retained risks (post-commitment measures):
  - Systematic monitoring of retained risks.
  - Funding mechanisms:
    - Low-impact risks: budgetary flexibility (contingency appropriations, supplementary budgets, under strict conditions allowing spending in excess of budget), or contingency funds for self-insurance.
    - Low-probability, high-impact events (e.g., natural disasters): use market insurance or hedging.
- Disclosure principles:
  - Guided by internationally-accepted standards in accounting and fiscal transparency.
  - Disclosure venues should include budget documentation and financial statements for integrated fiscal assessment.
  - Provide information that is meaningful without being overwhelming; limited nondisclosure sometimes justified but should not be used to avoid disclosure entirely.
  - Establish clear and strict responsibility for accurate reporting on contingent liabilities.

### Key country practice numeric observations and time horizons
- Disclosure thresholds and horizons:
  - $20 million and $40 million thresholds used in Australia for guarantees/indemnities and lawsuits.
  - Chile reports expected gross annual payments for PPP system over the next 20 years and summarizes risks using 5, 50, and 95 percentiles of cash payment distributions.
  - Colombia reports expected annual losses and unexpected annual losses (cash flow at risk) over the next 10 years and uses 99 percent probability for unexpected losses; reports NPV of expected and unexpected losses.
  - Chile reports historical series for SME guarantee metrics over the past 9 years.
  - Canada reports 5-year average of net claims paid for three insurance-run public corporations.
  - South Africa reports face value of guarantees and export credit insurance liabilities over the past 3 years; actuarial values for post retirement medical assistance for the past three years.
  - New Zealand uses Note 21 in financial statements and indicates whether values are "unchanged" or "changed" relative to last financial statement.

### Conclusion: summary of recommendations and institutional priorities
- Centralize monitoring of all public contingent liabilities in the fiscal policy-making institution to capture implicit and explicit fiscal exposure.
- Consider centralizing management of contingent liabilities and integrating with conventional debt and asset management where capacity and public financial management systems permit.
- Where centralization is impractical due to specialized expertise requirements, establish specialized units (e.g., PPP units) that report to the central entity responsible for overall management of guarantees and fiscal risks.
- Implement a comprehensive ex ante framework to mitigate moral hazard, require risk-sharing, charge beneficiaries where appropriate, and ensure parliamentary and audit scrutiny.
- Adopt funding strategies appropriate to risk profiles: budgetary flexibility or self-insurance for routine risks; market insurance or hedging for catastrophic risks.
- Disclose contingent liabilities in line with international accounting and fiscal transparency standards, balancing meaningfulness with manageability of disclosure.

*Source: _wp08245 - Part I*

### Annex I. Accounting/Statistical Standards and Contingent Liabilities

### Annex I. Accounting/Statistical Standards and Contingent Liabilities

### Recognition: accounting versus statistical treatment
- Accounting standards (IFRS for the private sector and IPSAS for the public sector) distinguish between “recognized” liabilities (recorded on the balance sheet as a liability or expense) and “disclosed” items (reported in notes or narratives).
- Under current accounting standards (IFRS/IPSAS):
  - For accrual accounting, contingent liabilities are recognized as liabilities at the moment of initiation if: (a) the probability that the contingency will occur and hence a payment would have to be made is more than 50 percent; and (b) these payments can be reasonably measured.
  - If both criteria are met, governments preparing accrual financial statements recognize the net present value of the amount expected to be called as a liability and expense at issuance (recorded as a “provision,” a liability/expense of uncertain amount and timing).
  - Most guarantees would probably have a less then 50 percent chance of being called; accounting standards allow probability of payment to be determined by considering similar guarantees as a class.
  - For cash accounting, assets and liabilities are not recognized; the expense associated with contingent liabilities is recognized only if and when the contingent event actually occurs and a payment is made.
- The IASB issued an Exposure Draft in 2005 proposing to amend IFRS to require contingent liabilities to be recognized immediately at fair value, arguing the contractual obligation itself is not conditional; uncertainty should be reflected in measurement rather than in recognition.
- Under current statistical reporting standards (the IMF’s GFSM 2001 or the European Union’s ESA-95) contingent liabilities are not considered liabilities until the contingency materializes; they need not be recorded as a liability/expense until then (to maintain consistency with national accounts and avoid double-counting private sector liabilities on public balance sheets).
- Work is underway to harmonize statistical and accounting standards (an International Task Force on the Harmonization of Public Accounts under the OECD is studying feasibility of harmonization across SNA 1993, ESA-95, GFSM 2001, and IFRS/IPSAS).

### Disclosure requirements
- IPSAS includes disclosure requirements for both recognized contingent liabilities (“provisions”) and contingent liabilities that have not been recognized.
- For recognized contingent liabilities (provisions), governments should disclose, for each class:
  - the amount at the beginning and end of the period;
  - additional provisions made in the period, including increases to existing provisions;
  - amounts used (incurred and charged against the provision) during the period;
  - unused amounts reversed during the period; and
  - the increase during the period in the discounted amount arising from the passage of time and the effect of any change in the discount rate.
- Additional disclosures for each class of recognized contingent liability:
  - a brief description of the nature of the contingent liability and the expected timing of any payments;
  - an indication of the uncertainties about the amount or timing of these payments, including major assumptions concerning future events where necessary; and
  - the possibility of any reimbursement.
- For contingent liabilities not recognized (probability < 50 percent or cannot be reasonably estimated), IPSAS requires the same information as for recognized liabilities unless the probability of payment is remote; where practicable, an estimate of the financial effect of each class of contingent liabilities should be presented (or state that it is not practicable).
- IPSAS allows exemption from disclosure when disclosure could prejudice the government’s position in a dispute; in such cases disclose the general nature of the dispute and the reason for non-disclosure (IPSAS 19, paragraph 109).
- GFSM 2001 requires disclosure of contingent liabilities as a memorandum item to the balance sheet, including a description of the nature of contingencies and some indication of their possible value (options mentioned include face value of the loan and present value of expected government payments).

### Table A1: summary of main recognition and disclosure requirements (as presented)
- Cash Accounting
  - Recognition: Only when the contingency is called and cash payments need to be made.
  - Disclosure: Encouraged.
- Accrual Accounting (IPSAS 19)
  - Recognition: The expected cost of a contingent obligation should be recognized if: (i) it is more likely than not (50 percent) that the event will occur; and (ii) the amount of the obligation can be measured with sufficient reliability. Liabilities that do not satisfy these criteria should not be recognized.
  - Disclosure: Required for the remaining contingent liabilities, unless the likelihood of the payment is remote.
- Statistical Reporting (GFS 2001)
  - Recognition: Only when the contingency is called and cash payments need to be made.
  - Disclosure: Required as a memorandum item to the balance sheet.

### Measurement of risks under accounting standards
- Public sector accounting standards recommend the “expected value” as the best estimate of the amount required to settle contingent obligations, weighing all possible outcomes by their associated probabilities, measured before tax or tax equivalents.
- Where the time value of money is material, the estimate should be the present value of expected expenditures to settle the obligation.
- When discounted over multiple years, the present value will increase each year as settlement approaches; standards require disclosure of the increase in recorded liability due to passage of time.
- The discount rate should be a pre-tax rate reflecting current market assessments of the time value of money and risks specific to the liability. If expected future cash flow is already risk-adjusted, that adjustment should not be reflected again in the discount rate.
- Standards emphasize qualitative characteristics for disclosures, including neutrality (free from bias) and materiality (information is material if omission or misstatement could influence decisions) (IPSAS 1).

### Annex II — Measuring the value of contingent liabilities: measures and methods
- Possible measures of guarantee value:
  - the face value of the guarantee or maximum loss under guarantee;
  - the expected costs of the guarantee, which can be viewed as the most government can lose at an about 50 percent confidence level;
  - “unexpected” costs of the guarantee, i.e., the most government can lose at, for example, a 95–99 percent confidence level (also called “cash flow at risk”); or
  - the market value of the guarantee (expected costs plus a risk premium).
- The face value is the easiest and most commonly reported measure; other measures require assessing the probability the guarantee would be called.
- Methods for estimating expected costs or market value range from educated guesses, to market or historical data, to quantitative models (option pricing, simulations).

- Implicit guarantee pricing using market or historical data:
  - Market data can estimate market value of the guarantee as the difference between a risk-free government bond and a non-guaranteed bond issued by the potential recipient (requires estimating borrower credit rating and comparable market instruments).
  - Market data can estimate expected cost by using historical default and recovery rates compiled by rating agencies for rating categories; compare to actual yield spreads to obtain the risk premium.
  - Historical loan loss experience can estimate expected costs where there is a large portfolio of similar contingent liabilities.

- Direct guarantee pricing methods:
  - Option pricing: models guarantees as put options (Merton, 1977); value of the government guarantee equals the value of the put option. Option pricing is based on risk-neutral valuation (no explicit risk premium).
  - Simulation models (e.g., Monte Carlo): simulate evolution of relevant risk factors to estimate the probability distribution of losses; use distribution to price guarantees and estimate maximum losses at confidence levels (flexible and allows multiple factors, but time-consuming and expensive).

- Practical considerations and guidance:
  - Choice of method depends on availability of comparable companies and the cost/benefit of the method.
  - Implicit guarantee valuations suit cases where comparable market-quoted debt exists; simulation methods are used when comparables are hard to find but are resource-intensive and justified when guaranteed amounts are large.
  - For relatively small guarantees, option pricing may be an efficient substitute; any reasonable approach (including educated guesses) yields better estimates than cash-based accounting that assumes zero cost in the budget year.

_Annex I. Accounting/Statistical Standards and Contingent Liabilities (from _wp08245 - Annex I. Accounting/Statistical Standards and Contingent Liabilities)_

### REFERENCES

### _wp08245 - REFERENCES

### Contingent liabilities, fiscal risks, and public finance
- Benavente, José Miguel, Alexander Galetovic, and Ricardo Sanhueza, 2006, “Fogape: an Economic Analysis,” University of Chile Economics Department Working Paper 222. 
- Cebotari, Aliona, Jeffrey Davis, Lusine Lusinyan, Amine Mati, Paolo Mauro and Ricardo Velloso, 2008, “Fiscal Risks: Sources, Disclosure and Management,” International Monetary Fund, available at http://www.imf.org/external/np/pp/eng/2008/052108.pdf.  
- Hemming, Richard and a staff team, 2006, “Public-Private Partnership, Government Guarantees, and Fiscal Risk,” International Monetary Fund, Washington. 
- Honohan, Patrick, 2008, “Partial Credit Guarantees: Principles and Practice,” Discussion Paper No. 244 (Dublin: Institute for International Integration Studies). 
- Hörngren, Lars, 2003, “Contingent Liabilities in Debt Management,” issues paper prepared for the annual meeting of the OECD Working Party on Debt Management, October. 
- Intosai Public Debt Committee, 2005, “Member States Questionnaire on Contingent Debt: Summary of Results” and “Member States Questionnaire on Contingent Debt: Outcomes and Recommendations.” Available at www.intosai.org
- Kharas, Homi, and Deepak Mishra, 2001, “Fiscal Policy, Hidden Deficits, and Currency Crises,” in World Bank Economists’ Forum, ed. by S. Devarajan, F. H. Rogers, and L. Squire. (Washington: The World Bank.) 
- Laeven, Luc, and Fabian Valencia, 2008, “Systemic Banking Crises: A New Database,” International Monetary Fund, Working Paper 08/224. 
- Mody, Ashoka, 2000, "Contingent Liabilities in Infrastructure: Lessons from the East Asian Crisis," IBRD. 
- Polackova Brixi, Hana, and Allen Schick, eds., 2002, Government at Risk: Contingent Liabilities and Fiscal Risk, (Oxford: The World Bank and Oxford University Press). 
- Schick, Allen, 2002, “Budgeting for Fiscal Risk,”, Chapter 3 in Government at Risk: Contingent Liabilities and Fiscal Risk, ed. by Hana Polackova Brixi and Allen Schick (Oxford: The World Bank and Oxford University Press). 
- United Nations Development Program (UNDP), 2004, “Visions of Risk: A Review of International Indicators of Disaster Risk and its Management,” a report for the ISDR Inter-Agency Task Force on Disaster Reduction – Working Group 3: Risk, Vulnerability and Disaster Impact Assessment (Brussels). 

### Government guarantees, credit guarantees, and financial-sector risk-bearing
- Bennett, Fred, Alan Doran and Harriett Billington, 2005, “Do Credit Guarantees Lead to Improved Access to Financial Services? Recent Evidence from Chile, Egypt, India, and Poland,” Department for International Development, London, Financial Sector Team, Policy Division Working Paper. 
- Cooper, Russel, and Thomas Ross, 2003, “Protecting Underfunded Pensions: the Role of Guarantee Funds,” Journal of Pension Economics and Finance, Vol. 2, No. 3, pp. 247–272. 
- Currie, Elizabeth, 2002, The Potential Role of Government Debt Management Offices in Monitoring and Managing Contingent Liabilities (Washington: World Bank). 
- Honohan, Patrick, and Klingebiel, Daniela, 2003, “The Fiscal Cost Implications of an Accommodating Approach to Banking Crises,” Journal of Banking & Finance, Vol. 27, pp. 1539–1560. 
- Irwin, Timothy, 2003, “Public Money for Private Infrastructure—Deciding when to Offer Guarantees, Output-based Subsidies, and Other Fiscal Support,” World Bank Working Paper No. 10. 
- Irwin, Timothy, 2007, “Government Guarantees: Allocating and Valuing Risk in Privately Financed Infrastructure Projects,” the International Bank for Reconstruction and Development/the World Bank. 
- Merton, R.C., 1977, “An Analytic Derivation of the Cost of Loan Guarantees and Deposit Insurance: An Application of Modern Option Pricing Theory,” Journal of Banking and Finance, Vol. 1 (June), pp. 3–11. 
- National Economic Research Associates (NERA), 2000, “The Economic Rationale for the Public Provision of Export Credit Insurance by ECGD: A Report for the Export Credits Guarantee Department” (London). 
- Honohan, Patrick, 2008, “Partial Credit Guarantees: Principles and Practice,” Discussion Paper No. 244 (Dublin: Institute for International Integration Studies). 

### Budgeting, accounting, and public sector risk disclosure
- Bhatia, A.V., 2002, “Sovereign Credit Ratings Methodology: an Evaluation,” IMF Working Paper 02/170 (Washington: International Monetary Fund). 
- Blöndal, Jón R., 2004, “Issues in Accrual Budgeting,” OECD Journal on Budgeting, Vol. 4, No. 1., pp. 103–210. 
- Kraan, Dirk-Jan, 2004, “Off-budget and Tax Expenditures”, OECD Journal on Budgeting, Vol. 4, No. 1, pp. 121–142. 
- Lienert, Ian, and Jung, Moo-Kyung, 2004, “The Legal Framework for Budget Systems, An International Comparison,” OECD Journal on Budgeting, Special Issue, Vol. 4, No. 3. 
- OECD, 2001, “OECD Best Practices for Budget Transparency,” Public Management Committee, PUMA/SBO(2000)6/FINAL. 
- OECD, 2003, Survey on Budget Practices and Procedures, OECD and World Bank, http://ocde.dyndns.org
- OECD, 2005b, A pilot survey on budget practices and procedures for selected Latin American countries, OECD, Inter-American Development Bank and the London School of Economics and Political Science. 
- OECD, 2007, Survey on Budget Practices and Procedures. Available at http://webnet4.oecd.org/budgeting/Budgeting.aspx
- OECD, 2005a, “Advances in Risk Management of Government Debt” (Paris). 
- European Commission, 2004, “Public finance in EMU—2004,” European Economy, Report and Studies, 3 (Brussels). 
- International Monetary Fund and the World Bank, 2001, “Guidelines for Public Debt Management,” Washington. 

### Disaster risk, catastrophe insurance, and terrorism risk
- Cardona, O.D., 2006, “A System of Indicators for Disaster Risk Management in the Americas,” in Measuring Vulnerability to Hazards of Natural Origin: Towards Disaster Resilient Societies, ed. by J. Birkmann (United Nations University, 2006). 
- Cardona Bermeo, J.E., B. Contreras Monroy, E. Ortega Rosero, and A.R. Quevedo Caro, 2002, “Manejo de Pasivos Contingentes en el Marco de la Disciplina Fiscal en Colombia,” paper presented at the XIV Regional Seminar for Fiscal Policy, Santiago, Chile, January.  
- General Accounting Office (GAO) of the United States, 2003, “Catastrophe Insurance Risks: Status of Efforts to Securitize Natural Catastrophe and Terrorism Risk,” GAO-03-1033 (Washington). 
- Insurance Information Institute (III), 2004, Terrorism, Insurance, and the United States Government (New York). Available at http://www.iii.org/media/hottopics/insurance/sept11/terrorismwhitepaper/
- Insurance Information Institute (III), 2008, “Terrorism Risk and Insurance,” Issues Updates. Available at http://www.iii.org/media/hottopics/
- MMC Securities Corp, 2007, “The Catastrophe Bond Market at Year-End 2006: Ripples into Waves.” 

### Infrastructure, PPPs, and transport investment
- Edwards P., J. Shaoul, A. Stafford, and L. Arblaster, 2004, “Evaluating the Operation of PFI in Roads and Hospitals,” Research Report No. 84 (London: Certified Accountants Educational Trust) available at: http://image.guardian.co.uk/sysfiles/Society/documents/2004/11/24/PFI.pdf
- Irwin, Timothy, 2003, “Public Money for Private Infrastructure—Deciding when to Offer Guarantees, Output-based Subsidies, and Other Fiscal Support,” World Bank Working Paper No. 10. 
- Irwin, Timothy, 2007, “Government Guarantees: Allocating and Valuing Risk in Privately Financed Infrastructure Projects,” the International Bank for Reconstruction and Development/the World Bank. 
- OECD, 2008, “Public-Private Partnerships: In Pursuit of Risk Sharing and Value for Money”. 
- OECD/International Transport Forum, 2008, “Transport Infrastructure Investment: Options for Efficiency.” 
- United Nations Commission on International Trade Law (UNCITRAL), 2001, Legislative Guide on Privately Financed Infrastructure Projects (New York) Available at: http://www.uncitral.org/pdf/english/texts/procurem/pfip/guide/pfip-e.pdf

### Financial markets, bond spreads, and related theory
- Elton, Gruber, Agrawal, and Mann (2001), “Explaining the Rate Spread on Corporate Bonds,” Journal of Finance, Vol. 56, pp. 247–277. 
- Ehrlich, Isaac, and Gary Becker, 1972, “Market insurance, Self-insurance and Self-protection,” Journal of Political Economy, Vol. 80, pp. 623–648. 
- Flannery, Mark J., 1993, “Government Risk-Bearing in the Financial Sector of a Capitalist Economy,” in Government Risk-Bearing, ed. by M. Sniderman (Norwell, MA: Kluwer Academic Publishers).  
- Federal Reserve Bank of Cleveland (FRBC), 1991, “Government Risk-Bearing,” Proceedings of a Conference Held at the FRBC, Cleveland, Ohio, May. 
- Gramlich, Edward M., 2003, Remarks Before the National Economists Club, Washington DC, April 24, 2003. 
- Hagelin, Niclas, “Pricing of state guarantees in practice,” Swedish National Debt Office: Central Government Borrowing: Forecast and Analysis, October 22, 2003 
- Webber, Lewis, 2007, “Decomposing Corporate Bond Spreads,” Bank of England Quarterly Bulletin. Available at: http://ssrn.com/abstract=1077563

*Source: _wp08245 - REFERENCES*

---


_Source: https://www.imf.org/-/media/websites/imf/imported-full-text-pdf/external/pubs/ft/wp/2008/_wp08245.pdf_
