## _op245

## Source details

**Canonical URL:** [_op245](https://www.imf.org/-/media/websites/imf/imported-publications/external/pubs/nft/op/245/_op245.pdf)

## Other formats

- [Markdown version](/-/media/websites/imf/imported-publications/external/pubs/nft/op/245/_op245.pdf.md)
- [Structured JSON version](/-/media/websites/imf/imported-publications/external/pubs/nft/op/245/_op245.pdf.json)

---

### Overview and purpose
- Over the past two decades, many OECD countries introduced fundamental changes in budget management emphasizing performance and results rather than inputs.
- The Fiscal Affairs Department (FAD) of the IMF has been called upon with increasing frequency over the past decade to assist middle-income countries, especially emerging economies, in adopting these budget reforms.
- This study synthesizes FAD technical assistance (TA) experience to answer recurring questions:
  - OECD experience and lessons.
  - Applicability of the reform paradigm to non-OECD countries.
  - How to start and sequence reforms.
  - Whether countries possess the managerial capacity to implement reforms.

### The three-track reform paradigm
- Reform characterized by three fundamental tracks:
  - Allow managers greater flexibility in managing resources.
  - Give managers greater certainty in resourcing.
  - Introduce a system of rewards and penalties to pressure managers to perform against government policy objectives.
- Result: move away from detailed central controls toward decentralized, arm’s-length management with new accountability relationships oriented toward results.

### Program structure, strategic linkage, and MTBFs
- First reform step: improve definition of government programs and clarify objectives to prioritize programs within a strategic policy framework.
- Program structures translate broad policies into activities and projects that can be costed and approved as budget appropriations.
- Medium-term budget frameworks (MTBFs) are increasingly adopted to:
  - Capture full costs of activities and projects over time.
  - Improve program planning and prioritization.
  - Provide discipline over resource use.
- Developing and maintaining an MTBF can be difficult (see Section III).

### Performance measurement and management
- Next step: link inputs with program outcomes and make performance information relevant to managers by tying it to resource allocation.
- Key challenges:
  - Defining and measuring outputs and especially outcomes is often problematic.
  - Producing consistent performance information, creating incentives for managers to use it, and monitoring performance are additional demanding requirements.
- Full-fledged performance management systems (e.g., New Zealand, Australia) may be difficult and costly for many emerging economies to implement.

### Public expenditure management (PEM) safeguards required
- Three PEM areas often weak in emerging countries and requiring strengthening:
  - Internal control systems: essential before granting agencies wider resource-management responsibilities to detect errors and irregularities and to facilitate oversight and audit.
  - Internal audit: a central component of internal financial controls to protect the government’s financial interests.
  - Financial management information systems (FMIS) and IT: timely, usable management information reports tailored to management needs are critical given growing volume and complexity of government financial operations.
- Costing systems: capacity to capture the full cost of programs and activities is often scarce but necessary to relate costs to performance measures.

### Accrual accounting considerations
- Typical government accounting systems are cash-based or modified cash-based, emphasizing matching approved spending items with actual cash outlays.
- Cash-based systems meet MoF compliance and stabilization objectives but are less relevant for department-level budget managers.
- The move to accrual-based accounting is debated:
  - Accrual accounting can strengthen cost information.
  - Countries shifting to accrual accounting have found the process difficult and costly.
  - Many benefits from accrual-style costing may be attainable by intermediary moves (e.g., modified accruals); full accrual adoption is not always necessary.

### Institutional reorganization and the five Ds
- Performance budgeting pressures governments to reorganize operations; institutional innovations can be ordered into five groups—the five Ds:
  - Deconcentration
  - Decentralization
  - Delegation
  - Devolution
  - Divestment
- Delegation, devolution, and divestment are most closely associated with the new performance management approach.
- Two widely discussed innovations:
  - Contracting in government (including output/performance contracting).
  - Autonomous devolved management units (agency model).
- Caution: contracting and agency models can be problematic if administrative and accountability systems are not sufficiently robust; full output/performance contracting is resource-demanding and realized in only a few advanced countries.

### Managing the reform process
- Implementing the new budget management model requires substantial political and financial investment to manage change.
- Complementary changes often needed in legal frameworks and institutional organization to support the new accountability framework.
- Emphasis on sequencing, preconditions, and the need to strengthen basic PEM systems before extensive delegation or performance-based contracting.

### Strain on administrative and PEM systems (Section 2)
- Even limited movement toward programmatic and performance-oriented budgeting is likely to strain administrative systems in emerging economies.
- Demands on PEM systems are heavy, especially regarding reporting requirements and the skills required of managers.
- Concerns extend to strategies for divesting or sharing government responsibility for providing public services, including contracting and private-public partnerships (PPPs).

### Implementation problems, capacity gaps, and sequencing (Section 2)
- It is difficult to find emerging economies that have made rapid progress on all three tracks of the reform process, indicating important implementation problems.
- Many difficulties have arisen from the lack of basic management infrastructure within the budget system.
- Capacity requirements to link policies with programs through strategic planning mechanisms include:
  - Skills to construct MTBFs with well-defined programs.
  - Analytical skills and adequate reporting systems to clarify the relationship between program resources and outputs and/or policy results (outcomes).
- Program design and program costing work is unlikely to be straightforward and is likely to demand skills, such as cost accounting, which are often in short supply.
- The new approach requires parallel administrative procedures to activate strategic plans and the program structure for decision making.
- Implementation must reflect the reform capacity of the country and should be carefully sequenced; the transformation from traditional budgeting procedures requires a substantial effort to manage the change process.
- For many countries, human resource constraints may impede, or at least slow, the move to performance budgeting.

*Occasional Paper 245: Budget System Reform in Emerging Economies — The Challenges and the Reform Agenda. Jack Diamond. INTERNATIONAL MONETARY FUND, Washington DC, 2006.*

### Section 1

### I Overview

### Background and purpose
- Over the past two decades, many countries in the Organization for Economic Cooperation and Development (OECD) have introduced fundamental changes in budget management emphasizing performance and results rather than inputs.
- The Fiscal Affairs Department (FAD) of the IMF has been called upon with increasing frequency over the past decade to assist middle-income countries, especially emerging economies, in adopting these budget reforms.
- This study synthesizes FAD technical assistance (TA) experience to answer recurring questions: OECD experience and lessons; applicability of the reform paradigm to non-OECD countries; how to start and sequence reforms; and whether countries possess the managerial capacity to implement reforms.

### The three-track reform paradigm
- Reform characterized by three fundamental tracks (Section II):
  - Allow managers greater flexibility in managing resources.
  - Give managers greater certainty in resourcing.
  - Introduce a system of rewards and penalties to pressure managers to perform against government policy objectives.
- Result: a move away from detailed central controls toward decentralized, arm’s-length management with new accountability relationships oriented toward results.

### Program structure, strategic linkage, and MTBFs
- First reform step: improve definition of government programs and clarify objectives to prioritize programs within a strategic policy framework.
- Program structures translate broad policies into activities and projects that can be costed and approved as budget appropriations.
- Medium-term budget frameworks (MTBFs) are increasingly adopted to:
  - Capture full costs of activities and projects over time.
  - Improve program planning and prioritization.
  - Provide discipline over resource use.
- Developing and maintaining an MTBF can be difficult (see Section III).

### Performance measurement and management
- Next step: link inputs with program outcomes and make performance information relevant to managers by tying it to resource allocation.
- Challenges (Section IV):
  - Defining and measuring outputs and especially outcomes is often problematic.
  - Producing consistent performance information, creating incentives for managers to use it, and monitoring performance are additional demanding requirements.
- Full-fledged performance management systems (e.g., New Zealand, Australia) may be difficult and costly for many emerging economies to implement.

### Public expenditure management (PEM) safeguards required (Section V)
- Three PEM areas often weak in emerging countries and requiring strengthening:
  - Internal control systems: essential before granting agencies wider resource-management responsibilities to detect errors and irregularities and to facilitate oversight and audit.
  - Internal audit: a central component of internal financial controls to protect the government’s financial interests.
  - Financial management information systems (FMIS) and IT: timely, usable management information reports tailored to management needs are critical given growing volume and complexity of government financial operations.
- Costing systems: capacity to capture the full cost of programs and activities is often scarce but necessary to relate costs to performance measures.

### Accrual accounting considerations (Section VI)
- Typical government accounting systems are cash-based or modified cash-based, emphasizing matching approved spending items with actual cash outlays.
- Cash-based systems meet MoF compliance and stabilization objectives but are less relevant for department-level budget managers.
- The move to accrual-based accounting is debated:
  - Accrual accounting can strengthen cost information.
  - Countries shifting to accrual accounting have found the process difficult and costly.
  - Many benefits from accrual-style costing may be attainable by intermediary moves (e.g., modified accruals); full accrual adoption is not always necessary.

### Institutional reorganization and the five Ds (Section VII)
- Performance budgeting pressures governments to reorganize operations; institutional innovations can be ordered into five groups—the five Ds—representing progressive shifts away from centralized models:
  - Deconcentration
  - Decentralization
  - Delegation
  - Devolution
  - Divestment
- Delegation, devolution, and divestment are most closely associated with the new performance management approach.
- Two widely discussed innovations:
  - Contracting in government (including output/performance contracting).
  - Autonomous devolved management units (agency model).
- Caution: contracting and agency models can be problematic if administrative and accountability systems are not sufficiently robust; full output/performance contracting is resource-demanding and realized in only a few advanced countries.

### Managing the reform process
- Implementing the new budget management model requires substantial political and financial investment to manage change.
- Complementary changes often needed in legal frameworks and institutional organization to support the new accountability framework.
- The study emphasizes sequencing, preconditions, and the need to strengthen basic PEM systems before extensive delegation or performance-based contracting.

*Occasional Paper 245: Budget System Reform in Emerging Economies — The Challenges and the Reform Agenda. Jack Diamond. INTERNATIONAL MONETARY FUND, Washington DC, 2006.*

### Section 2

### _op245 - Section 2

### Strain on administrative and PEM systems
- Even limited movement toward programmatic and performance-oriented budgeting is likely to strain administrative systems in emerging economies.
- Demands on PEM systems are heavy, especially regarding reporting requirements and the skills required of managers.
- Concerns extend to strategies for divesting or sharing government responsibility for providing public services, including contracting and private-public partnerships (PPPs).

### Implementation problems and capacity gaps
- It is difficult to find emerging economies that have made rapid progress on all three tracks of the reform process, indicating important implementation problems.
- Many difficulties have arisen from the lack of basic management infrastructure within the budget system.
- The capacity to link policies with programs through strategic planning mechanisms requires:
  - Skills to construct MTBFs with well-defined programs.
  - Analytical skills and adequate reporting systems to clarify the relationship between program resources and outputs and/or policy results (outcomes).
- Program design and program costing work is unlikely to be straightforward and is likely to demand skills, such as cost accounting, which are often in short supply.

### Administrative procedures, sequencing, and change management
- The new approach to budget management requires parallel administrative procedures to activate strategic plans and the program structure for decision making.
- Implementation must reflect the reform capacity of the country and should not be implemented too rapidly; it should be carefully sequenced.
- The transformation from traditional budgeting procedures is likely to require a substantial effort to manage the change process, a dimension often overlooked.
- For many countries, human resource constraints may impede, or at least slow, the move to performance budgeting.

*Source: _op245 - Section 2*

---


_Source: https://www.imf.org/-/media/websites/imf/imported-publications/external/pubs/nft/op/245/_op245.pdf_
