## Botswana: Technical Assistance Report-National Accounts Mission

_IMF Staff Country Reports, December 19, 2023_

## Source details

**Canonical URL:** [Botswana: Technical Assistance Report-National Accounts Mission](https://www.imf.org/en/publications/cr/issues/2023/12/19/botswana-technical-assistance-report-national-accounts-mission-542644)

## Other formats

- [Markdown version](/en/publications/cr/issues/2023/12/19/botswana-technical-assistance-report-national-accounts-mission-542644/index.md)
- [Structured JSON version](/en/publications/cr/issues/2023/12/19/botswana-technical-assistance-report-national-accounts-mission-542644/index.json)
- [Bundle manifest](/en/publications/cr/issues/2023/12/19/botswana-technical-assistance-report-national-accounts-mission-542644/bundle-manifest.json)

## Bibliographic details
- Published: December 19, 2023
- Series: IMF Staff Country Reports
- DOI: https://doi.org/10.5089/9798400261312.002

---

### Mission activities and progress
- The draft Census of Economic Establishments (CEE) questionnaires finalized during the previous mission in March 2023 have been tested.
- Some improvements were identified and have been incorporated into the CEE questionnaires.
- The mission and team commenced development of the data collection and data processing manuals.
- The mission discussed deflator issues that had been raised by the IMF country team.

### Key findings
- Statistics Botswana (SB) indicated they had resolved the deflator issues after the Ministry of Finance raised the same concern.
- SB are planning to use the tax list to identify the sample frame for this rebase.
- The sample design will have an impact on the data processing system.
- The mission reminded the team to consult with the Population and Housing Census data processing team to obtain the data required for the rebase.

### Data and sample issues
- Planned sample frame source: tax list (to be coordinated with Botswana Unified Revenue Service).
- Immediate action required: SB need to commence discussions with Botswana Unified Revenue Service to determine the sample frame as soon as possible.
- Interdependencies: sample design decisions affect the data processing system and require coordination with Population and Housing Census data processing.

### Next steps and recommendations (implicit from mission actions)
- Finalize and incorporate identified improvements into CEE questionnaires (already underway).
- Complete development of data collection and data processing manuals.
- SB to initiate discussions with Botswana Unified Revenue Service to confirm sample frame for the rebase.
- Coordinate now with Population and Housing Census data processing team to obtain required data for the rebase.

---

## Content in this bundle

- **1bwaea2023005**
  - [1bwaea2023005 (Markdown version)](/-/media/files/publications/cr/2023/english/1bwaea2023005.pdf.md){rel="alternate" type="text/markdown"}
  - [1bwaea2023005 (PDF)](/-/media/files/publications/cr/2023/english/1bwaea2023005.pdf){rel="external" type="application/pdf"}

---

_Source: https://www.imf.org/en/publications/cr/issues/2023/12/19/botswana-technical-assistance-report-national-accounts-mission-542644_
