International Monetary Fund
Azerbaijan: Financial Position in the Fund

Member Financial Data



Azerbaijan: Projected Payments to the IMF
as of September 30, 1999



Projected charges/interest and due dates are tentative. GRA charges are due two business days following notification to members shortly after quarter end. Net SDR charges and annual SDR assessments are due on the first day after the end of the quarter and April 30, respectively. RST interest is due promptly after the end of the quarter.

Download this file
TSV -- TSV tips

(in SDRs)
Description Schedule Date Total
Amount Due
GRA Repurchase (SBA)  October 02, 19991,535,625
GRA Repurchase (SBA)  October 21, 19991,535,625
GRA Repurchase (STF)  October 23, 19992,437,500
GRA Charges  November 07, 19992,210,943
GRA Repurchase (SBA)  November 21, 19991,170,000
PRGT Interest 1/  December 31, 1999154,246
PRGT Interest 1/  December 31, 199951,620
Total for the year 19999,095,559
 
GRA Repurchase (SBA)  January 02, 20001,535,625
GRA Repurchase (SBA)  January 20, 20001,535,625
GRA Repurchase (SBA)  January 21, 20001,535,625
GRA Charges  February 07, 20002,152,246
GRA Repurchase (SBA)  February 14, 20001,535,625
GRA Repurchase (SBA)  February 21, 20001,170,000
GRA Repurchase (SBA)  April 02, 20001,535,625
GRA Repurchase (SBA)  April 20, 20001,535,625
GRA Repurchase (SBA)  April 21, 20001,535,625
GRA Repurchase (STF)  April 23, 20002,437,500
GRA Charges  May 07, 20002,030,292
GRA Repurchase (SBA)  May 14, 20001,535,625
GRA Repurchase (SBA)  May 21, 20001,170,000
GRA Repurchase (STF)  May 21, 20002,437,500
PRGT Interest 1/  June 30, 200050,919
PRGT Interest 1/  June 30, 2000152,710
GRA Repurchase (SBA)  July 02, 20001,535,625
GRA Repurchase (SBA)  July 20, 20001,535,625
GRA Repurchase (SBA)  July 21, 20001,535,625
GRA Charges  August 07, 20001,960,242
GRA Repurchase (SBA)  August 14, 20001,535,625
GRA Repurchase (SBA)  August 21, 20001,170,000
GRA Repurchase (SBA)  October 02, 20001,535,625
GRA Repurchase (SBA)  October 20, 20001,535,625
GRA Repurchase (SBA)  October 21, 20001,535,625
GRA Repurchase (STF)  October 23, 20002,437,500
GRA Charges  November 07, 20001,879,194
GRA Repurchase (SBA)  November 14, 20001,535,625
GRA Repurchase (STF)  November 21, 20002,437,500
GRA Repurchase (SBA)  November 21, 20001,170,000
PRGT Interest 1/  December 31, 2000154,388
PRGT Interest 1/  December 31, 200051,478
Total for the year 200047,431,469
 
GRA Repurchase (SBA)  January 02, 20011,535,625
GRA Repurchase (SBA)  January 20, 20011,535,625
GRA Repurchase (SBA)  January 21, 20011,535,625
GRA Charges  February 07, 20011,766,268
GRA Repurchase (SBA)  February 14, 20011,535,625
GRA Repurchase (SBA)  April 02, 20011,535,625
GRA Repurchase (SBA)  April 20, 20011,535,625
GRA Repurchase (SBA)  April 21, 20011,535,625
GRA Repurchase (STF)  April 23, 20012,437,500
GRA Charges  May 07, 20011,642,559
GRA Repurchase (SBA)  May 14, 20011,535,625
GRA Repurchase (STF)  May 21, 20012,437,500
GRA Repurchase (EFF)  June 25, 2001390,000
PRGT Interest 1/  June 30, 200150,778
PRGT Interest 1/  June 30, 2001152,286
GRA Repurchase (SBA)  July 02, 20011,535,625
GRA Repurchase (SBA)  July 20, 20011,535,625
GRA Charges  August 07, 20011,594,631
GRA Repurchase (SBA)  August 14, 20011,535,625
GRA Repurchase (EFF)  October 02, 2001390,000
GRA Repurchase (SBA)  October 20, 20011,535,625
GRA Repurchase (STF)  October 23, 20012,437,500
GRA Charges  November 07, 20011,541,987
GRA Repurchase (SBA)  November 14, 20011,535,625
GRA Repurchase (STF)  November 21, 20012,437,500
GRA Repurchase (EFF)  December 25, 2001390,000
PRGT Interest 1/  December 31, 2001154,810
PRGT Interest 1/  December 31, 200151,620
Total for the year 200137,838,064
 
GRA Repurchase (EFF)  January 01, 2002390,000
GRA Charges  February 07, 20021,466,228
GRA Repurchase (EFF)  April 02, 2002390,000
GRA Repurchase (EFF)  April 02, 2002780,000
GRA Repurchase (STF)  April 23, 20022,437,500
GRA Repurchase (CFF)  April 27, 20027,039,375
GRA Charges  May 07, 20021,397,488
GRA Repurchase (STF)  May 21, 20022,437,500
GRA Repurchase (EFF)  June 25, 2002390,000
GRA Repurchase (EFF)  June 28, 2002145,833
PRGT Interest 1/  June 30, 2002152,286
PRGT Interest 1/  June 30, 200250,778
GRA Repurchase (EFF)  July 01, 2002390,000
PRGT Repayment (PRGF)  July 09, 20022,048,000
GRA Repurchase (CFF)  July 27, 20027,039,375
GRA Charges  August 07, 20021,320,264
GRA Repurchase (EFF)  September 26, 2002585,000
GRA Repurchase (EFF)  October 02, 2002780,000
GRA Repurchase (EFF)  October 02, 2002390,000
GRA Repurchase (STF)  October 23, 20022,437,500
GRA Repurchase (CFF)  October 27, 20027,039,375
GRA Charges  November 07, 20021,229,732
GRA Repurchase (STF)  November 21, 20022,437,500
GRA Repurchase (EFF)  December 25, 2002390,000
GRA Repurchase (EFF)  December 28, 2002145,833
PRGT Interest 1/  December 31, 200246,683
PRGT Interest 1/  December 31, 2002154,810
GRA Repurchase (EFF)  December 31, 2002145,833
Total for the year 200243,656,893
 
GRA Repurchase (EFF)  January 01, 2003390,000
PRGT Repayment (PRGF)  January 09, 20032,048,000
PRGT Repayment (ECF)  January 14, 20032,048,000
GRA Repurchase (CFF)  January 27, 20037,039,375
GRA Charges  February 07, 20031,102,114
GRA Repurchase (EFF)  February 17, 2003585,000
GRA Repurchase (EFF)  March 26, 2003585,000
GRA Repurchase (EFF)  April 02, 2003390,000
GRA Repurchase (EFF)  April 02, 2003780,000
GRA Repurchase (STF)  April 23, 20032,437,500
GRA Repurchase (CFF)  April 27, 20037,039,375
GRA Charges  May 07, 2003973,820
GRA Repurchase (STF)  May 21, 20032,437,500
GRA Repurchase (EFF)  June 25, 2003390,000
GRA Repurchase (EFF)  June 28, 2003145,833
PRGT Repayment (ECF)  June 29, 20031,462,000
PRGT Interest 1/  June 30, 200340,848
GRA Repurchase (EFF)  June 30, 2003145,833
PRGT Interest 1/  June 30, 2003147,534
GRA Repurchase (EFF)  July 01, 2003390,000
PRGT Repayment (PRGF)  July 09, 20032,048,000
PRGT Repayment (ECF)  July 14, 20032,048,000
GRA Repurchase (EFF)  July 27, 2003146,667
GRA Repurchase (CFF)  July 27, 20037,039,375
GRA Charges  August 07, 2003877,166
GRA Repurchase (EFF)  August 17, 2003585,000
GRA Repurchase (EFF)  September 26, 2003585,000
GRA Repurchase (EFF)  October 02, 2003780,000
GRA Repurchase (EFF)  October 02, 2003390,000
GRA Repurchase (STF)  October 23, 20032,437,500
GRA Repurchase (CFF)  October 27, 20037,039,375
GRA Charges  November 07, 2003779,423
GRA Repurchase (STF)  November 21, 20032,437,500
GRA Repurchase (EFF)  December 25, 2003390,000
GRA Repurchase (EFF)  December 28, 2003145,833
PRGT Repayment (ECF)  December 29, 20031,462,000
GRA Repurchase (EFF)  December 31, 2003145,833
PRGT Interest 1/  December 31, 2003141,107
PRGT Interest 1/  December 31, 200336,360
Total for the year 200360,091,871
 
GRA Repurchase (EFF)  January 01, 2004390,000
GRA Repurchase (EFF)  January 05, 2004439,167
PRGT Repayment (PRGF)  January 09, 20042,048,000
PRGT Repayment (ECF)  January 14, 20041,462,000
PRGT Repayment (ECF)  January 14, 20042,048,000
GRA Repurchase (CFF)  January 27, 20047,039,375
GRA Repurchase (EFF)  January 27, 2004146,667
GRA Charges  February 07, 2004648,829
GRA Repurchase (EFF)  February 17, 2004585,000
GRA Repurchase (EFF)  February 19, 2004439,167
GRA Repurchase (EFF)  March 26, 2004585,000
GRA Repurchase (EFF)  April 02, 2004780,000
GRA Repurchase (EFF)  April 02, 2004390,000
GRA Repurchase (STF)  April 23, 20042,437,500
GRA Charges  May 07, 2004535,748
GRA Repurchase (STF)  May 21, 20042,437,500
GRA Repurchase (EFF)  June 25, 2004390,000
GRA Repurchase (EFF)  June 28, 2004145,833
PRGT Repayment (ECF)  June 29, 20041,462,000
GRA Repurchase (EFF)  June 30, 2004145,833
PRGT Interest 1/  June 30, 2004127,114
PRGT Interest 1/  June 30, 200430,776
GRA Repurchase (EFF)  July 01, 2004390,000
GRA Repurchase (EFF)  July 05, 2004439,167
PRGT Repayment (PRGF)  July 09, 20042,048,000
PRGT Repayment (ECF)  July 14, 20041,462,000
PRGT Repayment (ECF)  July 14, 20042,048,000
GRA Repurchase (EFF)  July 27, 2004146,667
PRGT Repayment (ECF)  August 02, 2004585,000
GRA Charges  August 07, 2004487,538
GRA Repurchase (EFF)  August 17, 2004585,000
GRA Repurchase (EFF)  August 19, 2004439,167
GRA Repurchase (EFF)  September 26, 2004585,000
GRA Repurchase (EFF)  October 02, 2004390,000
GRA Repurchase (EFF)  October 02, 2004780,000
GRA Repurchase (STF)  October 23, 20042,437,500
GRA Charges  November 07, 2004454,009
GRA Repurchase (STF)  November 21, 20042,437,500
GRA Repurchase (EFF)  December 25, 2004390,000
GRA Repurchase (EFF)  December 28, 2004145,833
PRGT Repayment (ECF)  December 29, 20041,462,000
PRGT Interest 1/  December 31, 200425,965
GRA Repurchase (EFF)  December 31, 2004145,833
PRGT Interest 1/  December 31, 2004114,770
Total for the year 200442,712,458
 
GRA Repurchase (EFF)  January 01, 2005390,000
GRA Repurchase (EFF)  January 05, 2005439,167
PRGT Repayment (ECF)  January 07, 2005585,000
PRGT Repayment (PRGF)  January 09, 20052,048,000
PRGT Repayment (ECF)  January 14, 20051,462,000
PRGT Repayment (ECF)  January 14, 20052,048,000
GRA Repurchase (EFF)  January 27, 2005146,667
PRGT Repayment (ECF)  February 02, 2005585,000
GRA Charges  February 07, 2005394,437
GRA Repurchase (EFF)  February 17, 2005585,000
GRA Repurchase (EFF)  February 19, 2005439,167
GRA Repurchase (EFF)  March 26, 2005585,000
GRA Repurchase (EFF)  April 02, 2005780,000
GRA Repurchase (EFF)  April 02, 2005390,000
GRA Repurchase (STF)  April 23, 20052,437,500
GRA Charges  May 07, 2005349,988
GRA Repurchase (STF)  May 21, 20052,437,500
GRA Repurchase (EFF)  June 25, 2005390,000
GRA Repurchase (EFF)  June 28, 2005145,833
PRGT Repayment (ECF)  June 29, 20051,462,000
GRA Repurchase (EFF)  June 30, 2005145,833
PRGT Interest 1/  June 30, 200520,537
PRGT Interest 1/  June 30, 200598,062
GRA Repurchase (EFF)  July 01, 2005390,000
GRA Repurchase (EFF)  July 05, 2005439,167
PRGT Repayment (ECF)  July 07, 2005585,000
PRGT Repayment (PRGF)  July 09, 20052,048,000
PRGT Repayment (ECF)  July 14, 20051,462,000
PRGT Repayment (ECF)  July 14, 20052,048,000
GRA Repurchase (EFF)  July 27, 2005146,667
PRGT Repayment (ECF)  August 02, 2005585,000
GRA Charges  August 07, 2005301,576
GRA Repurchase (EFF)  August 17, 2005585,000
GRA Repurchase (EFF)  August 19, 2005439,167
GRA Repurchase (EFF)  September 26, 2005585,000
GRA Repurchase (EFF)  October 02, 2005390,000
GRA Repurchase (EFF)  October 02, 2005780,000
GRA Charges  November 07, 2005270,353
GRA Repurchase (STF)  November 21, 20052,437,500
GRA Repurchase (EFF)  December 25, 2005390,000
GRA Repurchase (EFF)  December 28, 2005145,833
PRGT Repayment (ECF)  December 29, 20051,462,000
PRGT Interest 1/  December 31, 200584,172
GRA Repurchase (EFF)  December 31, 2005145,833
PRGT Interest 1/  December 31, 200515,711
Total for the year 200534,100,670
 
GRA Repurchase (EFF)  January 01, 2006390,000
GRA Repurchase (EFF)  January 05, 2006439,167
PRGT Repayment (ECF)  January 07, 2006585,000
PRGT Repayment (PRGF)  January 09, 20062,048,000
PRGT Repayment (ECF)  January 14, 20061,462,000
PRGT Repayment (ECF)  January 14, 20062,048,000
GRA Repurchase (EFF)  January 27, 2006146,667
PRGT Repayment (ECF)  February 02, 2006585,000
GRA Charges  February 07, 2006232,385
GRA Repurchase (EFF)  February 17, 2006585,000
GRA Repurchase (EFF)  February 19, 2006439,167
GRA Repurchase (EFF)  March 26, 2006585,000
GRA Repurchase (EFF)  April 02, 2006390,000
GRA Repurchase (EFF)  April 02, 2006780,000
GRA Charges  May 07, 2006194,649
GRA Repurchase (EFF)  June 25, 2006390,000
GRA Repurchase (EFF)  June 28, 2006145,833
PRGT Repayment (ECF)  June 29, 20061,462,000
PRGT Interest 1/  June 30, 200610,379
PRGT Interest 1/  June 30, 200667,605
GRA Repurchase (EFF)  June 30, 2006145,833
GRA Repurchase (EFF)  July 01, 2006390,000
GRA Repurchase (EFF)  July 05, 2006439,167
PRGT Repayment (ECF)  July 07, 2006585,000
PRGT Repayment (PRGF)  July 09, 20062,048,000
PRGT Repayment (ECF)  July 14, 20062,048,000
PRGT Repayment (ECF)  July 14, 20061,462,000
GRA Repurchase (EFF)  July 27, 2006146,667
PRGT Repayment (ECF)  August 02, 2006585,000
GRA Charges  August 07, 2006182,494
GRA Repurchase (EFF)  August 17, 2006585,000
GRA Repurchase (EFF)  August 19, 2006439,167
GRA Repurchase (EFF)  September 26, 2006585,000
GRA Repurchase (EFF)  October 02, 2006390,000
GRA Repurchase (EFF)  October 02, 2006780,000
GRA Charges  November 07, 2006156,601
GRA Repurchase (EFF)  December 25, 2006390,000
GRA Repurchase (EFF)  December 28, 2006145,833
PRGT Repayment (ECF)  December 29, 20061,462,000
PRGT Interest 1/  December 31, 20065,388
PRGT Interest 1/  December 31, 200653,210
GRA Repurchase (EFF)  December 31, 2006145,833
Total for the year 200626,156,045
 
GRA Repurchase (EFF)  January 01, 2007390,000
GRA Repurchase (EFF)  January 05, 2007439,167
PRGT Repayment (ECF)  January 07, 2007585,000
PRGT Repayment (PRGF)  January 09, 20072,048,000
PRGT Repayment (ECF)  January 14, 20072,048,000
PRGT Repayment (ECF)  January 14, 20071,462,000
GRA Repurchase (EFF)  January 27, 2007146,667
PRGT Repayment (ECF)  February 02, 2007585,000
GRA Charges  February 07, 2007137,816
GRA Repurchase (EFF)  February 17, 2007585,000
GRA Repurchase (EFF)  February 19, 2007439,167
GRA Repurchase (EFF)  March 26, 2007585,000
GRA Repurchase (EFF)  April 02, 2007780,000
GRA Repurchase (EFF)  April 02, 2007390,000
GRA Charges  May 07, 2007108,320
GRA Repurchase (EFF)  June 28, 2007145,833
PRGT Repayment (ECF)  June 29, 20071,462,000
PRGT Interest 1/  June 30, 200737,146
PRGT Interest 1/  June 30, 2007224
GRA Repurchase (EFF)  June 30, 2007145,833
GRA Repurchase (EFF)  July 01, 2007390,000
GRA Repurchase (EFF)  July 05, 2007439,167
PRGT Repayment (ECF)  July 07, 2007585,000
PRGT Repayment (ECF)  July 14, 20072,048,000
PRGT Repayment (ECF)  July 14, 20071,462,000
GRA Repurchase (EFF)  July 27, 2007146,667
PRGT Repayment (ECF)  August 02, 2007585,000
GRA Charges  August 07, 200794,834
GRA Repurchase (EFF)  August 17, 2007585,000
GRA Repurchase (EFF)  August 19, 2007439,167
GRA Repurchase (EFF)  September 26, 2007585,000
GRA Repurchase (EFF)  October 02, 2007780,000
GRA Charges  November 07, 200772,564
GRA Repurchase (EFF)  December 28, 2007145,837
PRGT Repayment (ECF)  December 29, 20071,462,000
PRGT Interest 1/  December 31, 200722,246
GRA Repurchase (EFF)  December 31, 2007145,833
Total for the year 200722,508,488
 
GRA Repurchase (EFF)  January 05, 2008439,167
PRGT Repayment (ECF)  January 07, 2008585,000
PRGT Repayment (ECF)  January 14, 20081,462,000
GRA Repurchase (EFF)  January 27, 2008146,667
PRGT Repayment (ECF)  February 02, 2008585,000
GRA Charges  February 07, 200859,313
GRA Repurchase (EFF)  February 17, 2008585,000
GRA Repurchase (EFF)  February 19, 2008439,167
GRA Repurchase (EFF)  March 26, 2008585,000
GRA Charges  May 07, 200841,228
PRGT Interest 1/  June 30, 200811,471
GRA Repurchase (EFF)  June 30, 2008145,837
GRA Repurchase (EFF)  July 05, 2008439,167
PRGT Repayment (ECF)  July 07, 2008585,000
PRGT Repayment (ECF)  July 14, 20081,462,000
GRA Repurchase (EFF)  July 27, 2008146,667
PRGT Repayment (ECF)  August 02, 2008585,000
GRA Charges  August 07, 200834,818
GRA Repurchase (EFF)  August 17, 2008585,000
GRA Repurchase (EFF)  August 19, 2008439,167
GRA Charges  November 07, 200820,971
PRGT Interest 1/  December 31, 20084,974
Total for the year 20089,387,614
 
GRA Repurchase (EFF)  January 05, 2009439,167
PRGT Repayment (ECF)  January 07, 2009585,000
GRA Repurchase (EFF)  January 27, 2009146,663
PRGT Repayment (ECF)  February 02, 2009585,000
GRA Charges  February 07, 200917,730
GRA Repurchase (EFF)  February 19, 2009439,167
GRA Charges  May 07, 20099,411
PRGT Interest 1/  June 30, 20091,753
GRA Repurchase (EFF)  July 05, 2009439,163
PRGT Repayment (ECF)  July 07, 2009585,000
GRA Charges  August 07, 20097,539
GRA Repurchase (EFF)  August 19, 2009439,163
GRA Charges  November 07, 2009864
PRGT Interest 1/  December 31, 200948
Total for the year 20093,695,668
Total 336,674,799

1/ On July 14, 2021, the IMF Executive Board approved a modified interest rate setting mechanism which effectively sets interest rates to zero on ECF and SCF through July 2023 and possibly longer, while the interest rate on RCF remains at zero percent, in line with the Executive Board's decision in 2015. Based on these decisions, the following interest rates are assumed beyond July 2023: 0/0/0 percent per annum for the ECF, SCF and RCF respectively. The Executive Board will review the interest rates on concessional lending by end-July 2023 and every two years thereafter.

Short Description Description
GRA Repurchase (STF)Systemic Transformation Facility
GRA ChargesGeneral Resources Account - REGULAR Charges
GRA Repurchase (SBA)Stand-By Arrangement - Obligation
PRGT Repayment (ECF)Principal - Extended Credit Facility
GRA Repurchase (EFF)Extended Fund Facility Arrangement - Obligation
PRGT InterestInterest - PRG Trust
GRA Repurchase (CFF)Contingency and Compensatory Financing Facility
PRGT Repayment (PRGF)Principal - Extended Credit Facility

Disclaimer
The information provided is for your convenience and is not intended to replace other official IMF reports and statements.